Browse Standards

Found: 226547 — page 3691 of 4720

Superseded

SY/T 10034-2000 — Recommended Practice for Fire Prevention and Control on Open Type Offshore Production Platforms

National·Recommended
Instant delivery (0–9 sec)
$500.00PDF
Superseded

SY/T 10035-2000 — MODU towing and positioning operation rule

National·Recommended
Instant delivery (0–9 sec)
$345.00PDF
Superseded

SY/T 5030-2000 — Series 190 diesel engine for the petroleum and natural gas industry

National·Recommended
Instant delivery (0–9 sec)
$210.00PDF
Superseded

SY/T 5037-2000 — Spiral submerged arc-welded steel pipe for pipelines for low pressure field fluid service

National·Recommended
Instant delivery (0–9 sec)
$85.00PDF
Superseded

SY/T 5040-2000 — Spiral submerged arc-welded steel pipe piles

National·Recommended
Instant delivery (0–9 sec)
$105.00PDF
Superseded

SY/T 5044-2000 — Beam pumping unit

National·Recommended
Instant delivery (0–9 sec)
$630.00PDF
Withdrawn

SY/T 5046.1-2000 — Geophone. Part 1: Moving coil geophone

National·Recommended
Instant delivery (0–9 sec)
$240.00PDF
Superseded

SY/T 5059-2000 — Tubing pump with combined liners

National·Recommended
Instant delivery (0–9 sec)
$325.00PDF
Superseded

SY/T 5068-2000 — Overshot for drilling and servicing

National·Recommended
Instant delivery (0–9 sec)
$105.00PDF
Superseded

SY/T 5069-2000 — Spear for drilling and servicing

National·Recommended
Instant delivery (0–9 sec)
$105.00PDF
Withdrawn

SY/T 5103-2000 — Stub cable for geophone

National·Recommended
Instant delivery (0–9 sec)
$240.00PDF
Valid

SY/T 5110-2000 — Casing scrapers

National·Recommended
Instant delivery (0–9 sec)
$234.00PDF
Superseded

SY/T 5150-2000 — Multiple stage cementer

National·Recommended
Instant delivery (0–9 sec)
$85.00PDF
Withdrawn

SY/T 5181-2000 — Recommended practice for gravel pack of sand control of the naked hole

National·Recommended
Instant delivery (0–9 sec)
$240.00PDF
Superseded

SY/T 5183-2000 — Evaluation method for sand control effect of oil well

National·Recommended
Instant delivery (0–9 sec)
$55.00PDF
Withdrawn

SY/T 5208-2000 — Main hoisting equipment for petroleum workover

National·Recommended
Instant delivery (0–9 sec)
$240.00PDF
Superseded

SY/T 5216-2000 — Conventional coring tools

National·Recommended
Instant delivery (0–9 sec)
$365.00PDF
Superseded

SY/T 5217-2000 — Diamond drilling bits and diamond core bits

National·Recommended
Instant delivery (0–9 sec)
$150.00PDF
Superseded

SY/T 5236-2000 — Sucker rod hook

National·Recommended
Instant delivery (0–9 sec)
$90.00PDF
Superseded

SY/T 5249-2000 — Land hydraulic driving vibrator

National·Recommended
Instant delivery (0–9 sec)
$150.00PDF
Superseded

SY/T 5254-2000 — Symbol and code name for openhole logging data processing

National·Recommended
Instant delivery (0–9 sec)
$500.00PDF
Superseded

SY/T 5262-2000 — Specification for fire tube type heater

National·Recommended
Instant delivery (0–9 sec)
$375.00PDF
Superseded

SY/T 5267-2000 — Determination of the loss of crude oil in the oil field

National·Recommended
Instant delivery (0–9 sec)
$240.00PDF
Withdrawn

SY/T 5271-2000 — Instructions on free point indicating and backing-off with shooting

National·Recommended
Instant delivery (0–9 sec)
$240.00PDF
Superseded

SY/T 5273-2000 — Evaluation method for behaviour of corrosion inhibitor for produced water of oilfield

National·Recommended
Instant delivery (0–9 sec)
$125.00PDF
Superseded

SY/T 5274-2000 — Resin-coated sand

National·Recommended
Instant delivery (0–9 sec)
$85.00PDF
Withdrawn

SY/T 5276-2000 — Test method for flexural strength, compression strength and air permeability of chemical sand consolidation in man-made core

National·Recommended
Instant delivery (0–9 sec)
$240.00PDF
Superseded

SY/T 5280-2000 — General technical conditions for crude oil demulsifiers

National·Recommended
Instant delivery (0–9 sec)
$85.00PDF
Withdrawn

SY/T 5287-2000 — Fracturing blender truck

National·Recommended
Instant delivery (0–9 sec)
$240.00PDF
Superseded

SY/T 5289-2000 — Evaluating method for hydraulic fracturing effect of oil well

National·Recommended
Instant delivery (0–9 sec)
$395.00PDF
Withdrawn

SY/T 5320-2000 — JZ weight indicator

National·Recommended
Instant delivery (0–9 sec)
$240.00PDF
Withdrawn

SY/T 5322-2000 — Design method of casing string strength

National·Recommended
Instant delivery (0–9 sec)
$240.00PDF
Superseded

SY/T 5331-2000 — Interpretation maps for petroleum seismic exploration

National·Recommended
Instant delivery (0–9 sec)
$150.00PDF
Superseded

SY/T 5338-2000 — Recommended practice for sand consolidation of strengthen borehole wall

National·Recommended
Instant delivery (0–9 sec)
$590.00PDF
Withdrawn

SY/T 5339-2000 — Recommended practic e for sand control technology of artificial borehole wall

National·Recommended
Instant delivery (0–9 sec)
$240.00PDF
Superseded

SY/T 5340-2000 — Gravel paching method for sand control in cased hole

National·Recommended
Instant delivery (0–9 sec)
$760.00PDF
Withdrawn

SY/T 5355-2000 — The demand of oil reservoir geology character description technology carbonate buried hill reservoir portion

National·Recommended
Instant delivery (0–9 sec)
$240.00PDF
Superseded

SY/T 5366-2000 — Technological requirement of coring data of development wells

National·Recommended
Instant delivery (0–9 sec)
$289.00PDF
Superseded

SY/T 5368-2000 — Thin section examination of rock

National·Recommended
Instant delivery (0–9 sec)
$330.00PDF
Withdrawn

SY/T 5374-2000 — The application procedure of preflush for well cementing

National·Recommended
Instant delivery (0–9 sec)
$240.00PDF
Superseded

SY/T 5386-2000 — The regulations of proved reserves calculation of petroleum The part of fractured oil and gas reservoir

National·Recommended
Instant delivery (0–9 sec)
$300.00PDF
Superseded

SY/T 5387-2000 — Technological requirement of geology for conventional oil reservoir production test

National·Recommended
Instant delivery (0–9 sec)
$150.00PDF
Withdrawn

SY/T 5388-2000 — The dividing method for carbonate reservoir

National·Recommended
Instant delivery (0–9 sec)
$240.00PDF
Superseded

SY/T 5396-2000 — Well-site transportation and inspection criterion for oil casing

National·Recommended
Instant delivery (0–9 sec)
$165.00PDF
Withdrawn

SY/T 5400.1-2000 — Power tongs for petroleum drilling and servicing. Part 1: Drill tongs

National·Recommended
Instant delivery (0–9 sec)
$240.00PDF
Withdrawn

SY/T 5400.2-2000 — Power tongs for petroleum drilling and servicing. Part 2: Casing tongs

National·Recommended
Instant delivery (0–9 sec)
$240.00PDF
Superseded

SY/T 5426-2000 — Rock drillability measurement and its classification

National·Recommended
Instant delivery (0–9 sec)
$85.00PDF
Superseded

SY/T 5435-2000 — Methods of directional well path designing & trajectory graphing

National·Recommended
Instant delivery (0–9 sec)
$680.00PDF