Browse Standards

Found: 189235 — page 2994 of 3943

Superseded

SY/T 5374.2-2006 — Cementing specification. Part 2: Special cementing

National·Recommended
Instant delivery (0–9 sec)
$25.00PDF
Superseded

SY/T 5416.1-2006 — Measurement and inspect regulation of directional surveying instruments. Part 1: Measurement while drilling

National·Recommended
Instant delivery (0–9 sec)
$135.00PDF
Superseded

SY/T 5495-2006 — The labor quota for long-distance pipeline construction

National·Recommended
Instant delivery (0–9 sec)
$465.00PDF
Superseded

SY/T 5507-2006 — Labor quota for seismic prospecting with vibrator

National·Recommended
Instant delivery (0–9 sec)
$300.00PDF
Superseded

SY/T 5523-2006 — Practice for analysis of oilfield waters

National·Recommended
Instant delivery (0–9 sec)
$460.00PDF
Superseded

SY/T 5550-2006 — Hollow sucker rods

National·Recommended
Instant delivery (0–9 sec)
$285.00PDF
Superseded

SY/T 5599-2006 — Compiling specification for the geological summary report of geologging of the oil and gas exploration wells

National·Recommended
Instant delivery (0–9 sec)
$560.00PDF
Superseded

SY/T 5691-2006 — The specification for the interpretation of wireline formation tester data

National·Recommended
Instant delivery (0–9 sec)
$195.00PDF
Superseded

SY/T 5768-2006 — Welded steel pipe for normal structure purposes

National·Recommended
Instant delivery (0–9 sec)
$105.00PDF
Superseded

SY/T 5857-2006 — Management regulations of civil explosion equipments in the seismic operation of petroleum geophysical exploration

National·Recommended
Instant delivery (0–9 sec)
$285.00PDF
Superseded

SY/T 5964-2006 — Combination installation adjustment and maintenance of well-control equipments

National·Recommended
Instant delivery (0–9 sec)
$345.00PDF
Superseded

SY/T 6102-2006 — Oil field development monitoring and data requirement

National·Recommended
Instant delivery (0–9 sec)
$90.00PDF
Superseded

SY/T 6125-2006 — Technology procedures for gas well testing, gas producing and performance monitoring

National·Recommended
Instant delivery (0–9 sec)
$330.00PDF
Superseded

SY/T 6127-2006 — Specification of data collection items for downhole operation in oil, gas, water wells

National·Recommended
Instant delivery (0–9 sec)
$195.00PDF
Superseded

SY/T 6172-2006 — Technical specification for well testing of oilfield

National·Recommended
Instant delivery (0–9 sec)
$315.00PDF
Superseded

SY/T 6231-2006 — Electronic downhole pressure gauge

National·Recommended
Instant delivery (0–9 sec)
$135.00PDF
Superseded

SY/T 6264-2006 — Specifications of major repair project design for oil, gas, water well

National·Recommended
Instant delivery (0–9 sec)
$165.00PDF
Superseded

SY/T 6267-2006 — Specification for high pressure fiberglass line pipe

National·Recommended
Instant delivery (0–9 sec)
$405.00PDF
Valid

SY/T 6295-2006 — The reliability, maintainability prediction on equipment of oil field drilling and production

National·Recommended
Instant delivery (0–9 sec)
$360.0018 pages
Superseded

SY/T 6310-2006 — Technical requirements for feasible evaluation of gas field development

National·Recommended
Instant delivery (0–9 sec)
$70.00PDF
Superseded

SY/T 6315-2006 — Relative permeability and displacement efficiency test under the condition of high temperature for heavy oil reservoir

National·Recommended
Instant delivery (0–9 sec)
$285.00PDF
Superseded

SY/T 6588-2006 — Calibration methods for electric log tools

National·Recommended
Instant delivery (0–9 sec)
$360.00PDF
Superseded

SY/T 6641-2006 — Specification for cement bond logging data processing and interpreting technology

National·Recommended
Instant delivery (0–9 sec)
$120.00PDF
Valid

SY/T 6642-2006 — Cross well seismic data imaging system

National·Recommended
Instant delivery (0–9 sec)
$360.002 pages
Superseded

SY/T 6643-2006 — Technical specification of multiwave and multicomponent seismic data acquisition on land

National·Recommended
Instant delivery (0–9 sec)
$285.00PDF
Superseded

SY/T 6645-2006 — Regulations drafted for the injection and production well of perforated completion design of the underground gas storage about the depleted sandstone reservoir

National·Recommended
Instant delivery (0–9 sec)
$240.00PDF
Superseded

SY/T 6646-2006 — Well abandonment and inactive well practices

National·Recommended
Instant delivery (0–9 sec)
$470.00PDF
Superseded

SY/T 6647-2006 — Technical requirements of upper evaluation for productivity construction of new gas fields

National·Recommended
Instant delivery (0–9 sec)
$120.00PDF
Superseded

SY/T 6648-2006 — Managing system integrity for hazardous liquid pipelines

National·Recommended
Instant delivery (0–9 sec)
$1,025.00PDF
Superseded

SY/T 6649-2006 — Recommended practice of repairing crude oil, liquefied petroleum gas, and product pipelines

National·Recommended
Instant delivery (0–9 sec)
$165.00PDF
Superseded

SY/T 6650-2006 — Reciprocating compressors for petroleum, chemical and gas industry services

National·Recommended
Instant delivery (0–9 sec)
$1,850.00PDF
Superseded

SY/T 6651-2006 — Axial and centrifugal compressors and expander-compressors for petroleum, chemical and gas industry services

National·Recommended
Instant delivery (0–9 sec)
$3,035.00PDF
Superseded

SY/T 6653-2006 — Recommended practice for risk. based inspection

National·Recommended
Instant delivery (0–9 sec)
$575.00PDF
Superseded

SY/T 6656-2006 — Specification for polyethylene line pipe (PE)

National·Recommended
Instant delivery (0–9 sec)
$315.00PDF
Superseded

SY/T 6658-2006 — Measurement of natural gas flow by vortex precession meter

National·Recommended
Instant delivery (0–9 sec)
$315.00PDF
Superseded

SY/T 6659-2006 — Measurement of natural gas by Coriolis meter

National·Recommended
Instant delivery (0–9 sec)
$500.00PDF
Valid

SY/T 6660-2006 — Measurement of natural Gas flow by Rotary displacement gas meters

National·Recommended
Instant delivery (0–9 sec)
$255.0015 pages
Superseded

SY/T 6661-2006 — Geophone calibration method

National·Recommended
Instant delivery (0–9 sec)
$120.00PDF
Superseded

SY/T 6664-2006 — Diesel hydraulic coupling set for oil drilling rigs

National·Recommended
Instant delivery (0–9 sec)
$285.00PDF
Superseded

SY/T 6666-2006 — Recommended practice on application, care, and use of wire rope for petroleum and natural gas industry service

National·Recommended
Instant delivery (0–9 sec)
$435.00PDF
Valid

SY/T 6667-2006 — Recommended practice for diverter systems equipment and operations

National·Recommended
Instant delivery (0–9 sec)
$875.0049 pages
Superseded

SY/T 6668-2006 — Installation and lubrication of beam pumping units

National·Recommended
Instant delivery (0–9 sec)
$210.00PDF
Valid

SY/T 6670-2006 — The construction specification for fire station of oil and natural gas field

National·Recommended
Instant delivery (0–9 sec)
$150.009 pages
Superseded

SY/T 6671-2006 — Recommended practice for classification of locations for electrical installations at petroleum facilities classified asa class Ⅰ, zone 0, zone 1, and zone 2

National·Recommended
Instant delivery (0–9 sec)
$1,700.00PDF
Superseded

SY/T 6672-2006 — Natural gas processing plant practices for protection of the environment

National·Recommended
Instant delivery (0–9 sec)
$270.00PDF
Superseded

SY/T 6673-2006 — Recommended practice venting atmospheric and Iow-pressure storage tanks

National·Recommended
Instant delivery (0–9 sec)
$510.00PDF
Valid

SY/T 6674-2006 — The transformation method of density logging calibrator

National·Recommended
Instant delivery (0–9 sec)
$315.0015 pages
Superseded

TB 10007-2006 — Code for design of railway signaling

National·Mandatory
Instant delivery (0–9 sec)
$535.00PDF