Browse Standards

Found: 212212 — page 2975 of 4422

Superseded

SY/T 5534-2007 — Universal speciafications for oilfield special vehicles

National·Recommended
Instant delivery (0–9 sec)
$120.00PDF
Superseded

SY/T 5554-2007 — Work quota for wire-line logging engineering

National·Recommended
Instant delivery (0–9 sec)
$285.00PDF
Valid

SY/T 5587.9-2007 — Codes for conventional workover job-Part 9: Procedure of wellhead for replacing opertating

National·Recommended
Instant delivery (0–9 sec)
$90.0015 pages
Superseded

SY/T 5612-2007 — Specification for solids control equipments of drilling fluid

National·Recommended
Instant delivery (0–9 sec)
$624.00PDF
Valid

SY/T 5764-2007 — General technical specifications of natural plant gum for fracturing

National·Recommended
Instant delivery (0–9 sec)
$135.009 pages
Valid

SY/T 5785-2007 — Directives for information classifying and coding of petroleum industry

National·Recommended
Instant delivery (0–9 sec)
$225.0012 pages
Superseded

SY/T 5825-2007 — Procedures of temperature test by a electronic down-hole thermometer

National·Recommended
Instant delivery (0–9 sec)
$120.00PDF
Superseded

SY/T 5834-2007 — Performance specifications and measuring methods of low-solid killing fluid

National·Recommended
Instant delivery (0–9 sec)
$150.00PDF
Superseded

SY/T 5840-2007 — Recommended practice for laboratory testing of bridging materials for drilling fluids

National·Recommended
Instant delivery (0–9 sec)
$105.00PDF
Valid

SY/T 5920-2007 — Specification for operation management of crude oil and natural gasoline terminal

National·Recommended
Instant delivery (0–9 sec)
$135.008 pages
Superseded

SY/T 5936-2007 — Rules for geophoneuse and maintenance

National·Recommended
Instant delivery (0–9 sec)
$70.00PDF
Superseded

SY/T 6084-2007 — Using and maintaining for ground drive progressing cavity pumps

National·Recommended
Instant delivery (0–9 sec)
$105.00PDF
Superseded

SY/T 6111-2007 — Technical requirements for preparing of development plan adjustment for gas reservoir

National·Recommended
Instant delivery (0–9 sec)
$105.00PDF
Superseded

SY/T 6203-2007 — Wrecking method for oil and gas well blowout and fires

National·Recommended
Instant delivery (0–9 sec)
$105.00PDF
Superseded

SY/T 6229-2007 — Standard on training for initial emergency scene operations(NFPA 1410: 2000, IDT)

National·Recommended
Instant delivery (0–9 sec)
$390.00PDF
Superseded

SY/T 6253-2007 — Specification of horizontal well perforation

National·Recommended
Instant delivery (0–9 sec)
$150.00PDF
Superseded

SY/T 6331-2007 — Technical specification for design of energy conservation for gas field surface engineering

National·Recommended
Instant delivery (0–9 sec)
$205.00PDF
Superseded

SY/T 6476-2007 — Practice for drop-weight tear tests on steel line pipe

National·Recommended
Instant delivery (0–9 sec)
$165.00PDF
Superseded

SY/T 6490-2007 — Specification for normalization measurement of core NMR parameter in laboratory

National·Recommended
Instant delivery (0–9 sec)
$210.00PDF
Valid

SY/T 6675-2007 — Calibration method of the down hole flow meter gauge

National·Recommended
Instant delivery (0–9 sec)
$120.007 pages
Superseded

SY/T 6676-2007 — Calibration method of drilling fluid density meter

National·Recommended
Instant delivery (0–9 sec)
$165.00PDF
Superseded

SY/T 6677-2007 — Calibration method of drilling fluid retort assembly

National·Recommended
Instant delivery (0–9 sec)
$165.00PDF
Valid

SY/T 6678-2007 — Calibration method of the electronic dynamometer

National·Recommended
Instant delivery (0–9 sec)
$120.007 pages
Superseded

SY/T 6679.1-2007 — Calibration method for mud. logging unit. Part 1: Sensors

National·Recommended
Instant delivery (0–9 sec)
$650.00PDF
Superseded

SY/T 6680-2007 — Acceptance specification for petroleum drilling and servicing rigs

National·Recommended
Instant delivery (0–9 sec)
$435.00PDF
Valid

SY/T 6682-2007 — Measurement of liquid hydrocarbons by Coriolis meters

National·Recommended
Instant delivery (0–9 sec)
$360.0021 pages
Withdrawn

SY/T 6683-2007 — Technical requirement of development project design for polymer flooding

National·Recommended
Instant delivery (0–9 sec)
$240.00PDF
Superseded

SY/T 6684-2007 — Technical requirements for business evaluation of natural gas fiel

National·Recommended
Instant delivery (0–9 sec)
$85.00PDF
Superseded

SY/T 6685-2007 — The checking items and technical specification for SYSTEM IV /408UL seismic data acquisition system

National·Recommended
Instant delivery (0–9 sec)
$135.00PDF
Superseded

SY/T 6687-2007 — Technical specifications for borehole to surface geoelectric method

National·Recommended
Instant delivery (0–9 sec)
$165.00PDF
Superseded

SY/T 6688-2007 — Technical specifications for time-frequency electromagnetic method

National·Recommended
Instant delivery (0–9 sec)
$165.00PDF
Superseded

SY/T 6691-2007 — Specification for operation plan of logging

National·Recommended
Instant delivery (0–9 sec)
$210.00PDF
Superseded

SY/T 6692-2007 — Technical code for logging while drilling

National·Recommended
Instant delivery (0–9 sec)
$105.00PDF
Withdrawn

SY/T 6693-2007 — Evaluating method for polymer flooding development effect

National·Recommended
Instant delivery (0–9 sec)
$240.00PDF
Superseded

SY/T 6695-2007 — Operations practice of refined oil products pipeline

National·Recommended
Instant delivery (0–9 sec)
$135.00PDF
Superseded

SY/T 6696-2007 — Tank mechanical cleaning operational norms

National·Recommended
Instant delivery (0–9 sec)
$285.00PDF
Superseded

SY/T 6698-2007 — Recommended practice for coiled tubing operations in oil and gas well services

National·Recommended
Instant delivery (0–9 sec)
$950.00PDF
Valid

SY/T 6699-2007 — Recommended practice for ultrasonic evaluation of pipe imperfections

National·Recommended
Instant delivery (0–9 sec)
$405.0019 pages
Superseded

SY/T 6700-2007 — Coiled line pipe

National·Recommended
Instant delivery (0–9 sec)
$510.00PDF
Withdrawn

SY/T 6701-2007 — Reinforced MC nylon pipes and nylon-steel composite pipes and fittings

National·Recommended
Instant delivery (0–9 sec)
$240.00PDF
Superseded

SY/T 6702-2007 — Technical specifications of measurement while drilling

National·Recommended
Instant delivery (0–9 sec)
$285.00PDF
Valid

SY/T 6703-2007 — General specifications for core flowing system

National·Recommended
Instant delivery (0–9 sec)
$135.001 pages
Superseded

SY/T 6704-2007 — Calibration method of inclinometer calibration facility

National·Recommended
Instant delivery (0–9 sec)
$120.00PDF
Superseded

TB 10012-2007 — Code for geology investigation of railway engineering

National·Mandatory
Instant delivery (0–9 sec)
$1,700.00PDF
Superseded

TB 10063-2007 — Code for design on fire prevention of railway engineering

National·Mandatory
Instant delivery (0–9 sec)
$285.00PDF
Valid

TB 10084-2007 — Code for geology investigation of natural building material of railway engineering

National·Mandatory
Instant delivery (0–9 sec)
$375.0026 pages
Valid

TB 10121-2007 — Technical code for monitoring measurement of railway tunnel

National·Mandatory
Instant delivery (0–9 sec)
$345.0020 pages
Valid

TB/T 10121-2007 — Technical code for monitoring measurement of railway tunnel

National·Recommended
Instant delivery (0–9 sec)
$824.0020 pages