NB/T 42040-2014General specification for vanadium flow battery (English PDF)

全矾液流电池通用技术条件

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for NB/T 42040-2014 in 30 minutes.

Issued by

NEA

Level / Type

Industry · Recommended

Issue date

June 29, 2014

Implementation date

November 1, 2014

Scope

NB/T 42040-2014 is the English-translated version of 全矾液流电池通用技术条件.

NB/T 42040-2014 is the first Chinese energy industry general specification for all-vanadium redox flow battery systems, applicable to every system size.

It sets the working environment (0 °C to 40 °C, altitude up to 1 000 m) and requirements for appearance, rated watt-hour capacity, rated power, rated energy efficiency above 50 %, 60 % or 65 % depending on power class, capacity retention, low and high temperature storage, overcharge, over-discharge and short-circuit protection, charge and discharge characteristic curves, flame retardancy to GB/T 2408-2008, explosion protection, insulation resistance of at least 1 megohm and electrolyte leak prevention.

Matching test procedures, factory and type inspection rules, marking, user instructions, packaging, transport and storage complete the document. Issued on 29 June 2014, it has applied since 1 November 2014.

Found what you need?

Document preview — NB/T 42040-2014

National Standard of the People's Republic of China

ICS
27.070
Classification
K 82

Issued by: National Energy Administration of the People's Republic of China

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 Technical requirements
  • 5 Test methods
  • 6 Inspection rules
  • 7 logo, instruction manual
  • 8 Packaging, transportation, storage

Foreword

This standard is drafted in accordance with the rules given in GB/T 1.1-2009 "Standardization Work Guide Part 1. Standard Structure and Preparation".

1 Scope

This standard specifies the technical requirements, test methods, inspection rules and signs of the all-vanadium redox flow battery system (hereinafter referred to as the battery system). Instructions for use, packaging, transportation and storage.

This standard applies to all specifications of all vanadium flow battery systems.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only the dated version applies to this document.

For undated references, the latest edition (including all amendments) applies to this document.

GB/T 2408-2008 Determination of the burning properties of plastics

GB/T 9969-2008 General instructions for the use of industrial products

GB/T 29840-2013 All vanadium flow battery terminology

3 Terms and definitions

The following terms and definitions defined in GB/T 29840-2013 apply to this standard.

3.1 Capacity recovery ability

When the battery watt-hour capacity is attenuated to less than 80% of the rated watt-hour capacity, the watt-hour capacity is restored to at least 80% of the rated value after operation. Ability on the ground.

Note: In order to not add new electrolyte, do not replace the electrolyte.

3.2 Unit battery system

A separate assembly of one or more modules connected by a circuit, connected to a converter to achieve a charge and discharge function.

4 Technical requirements

4.1 Working environment

The working environment of the battery system is as follows.

-- Temperature. 0 ° C ~ 40 ° C;

-- Altitude. <=1000m;

-- Air humidity. 5% to 95%.

4.2 Appearance

When the battery system is inspected according to 5.3, the appearance should be clean, flat, no deformation, no electrolyte precipitation and leakage, and the mark is clear. intact.

4.3 Rated watt-hour capacity

The battery system shall be tested in accordance with 5.4 and the watt-hour capacity shall not be lower than the rating recommended by the manufacturer.

4.4 Rated power

The battery system shall be tested in accordance with 5.5 and the power shall not be lower than the rating recommended by the manufacturer. NB / T 42040 -.2014

4.5 Battery System Rated Energy Efficiency

The battery system shall be tested in accordance with 5.6. The rated energy efficiency of the battery system shall meet the following requirements.

- For battery systems with rated power less than 10 kW, the rated energy efficiency should be greater than 50%;

- For battery systems with rated power from 10kW to 100kW, the rated energy efficiency should be greater than 60%;

-- For battery systems with a rated power greater than 100 kW, the rated energy efficiency should be greater than 65%.

4.6 Capacity retention

The battery system is tested in accordance with 5.7 and the watt-hour capacity decay rate should be less than 10%.

4.7 Low temperature storage performance

The battery system shall be tested in accordance with 5.8. The discharge watt-hour capacity shall not be less than 95% of the rated watt-hour capacity.

4.8 High temperature storage performance

The battery system shall be tested in accordance with 5.9, and the discharge watt-hour capacity shall not be less than 95% of the rated watt-hour capacity.

4.9 Overcharge protection

The battery system should have overcharge protection. After testing according to 5.10, the battery system can work normally.

4.10 Overdischarge protection

The battery system should have over-discharge protection measures. After testing according to 5.11, the battery system can work normally.

4.11 Charging characteristic curve

The battery system shall be tested in accordance with 5.12 and the following reference charging characteristics shall be provided.

a) charging watthour capacity - time;

b) charging watt-hour capacity - SOC;

c) Battery voltage - time.

4.12 Discharge characteristic curve

The battery system shall be tested in accordance with 5.13 and the following reference discharge characteristics shall be provided.

a) discharge watt hour capacity - time;

b) discharge watt hour capacity - SOC;

c) Battery voltage - time.

4.13 Flame retardant properties

After the battery system is tested according to 5.14, its outer casing, storage tank, pipeline and related important components shall comply with GB/T 2408-2008.

The requirements of Section 8.3.2, FH-1 (horizontal level) and 9.3.2, FV-0 (vertical level).

4.14 Explosion-proof performance

The battery system shall be tested in accordance with 5.15 and shall not ignite or detonate.

4.15 Insulation resistance

The battery system shall be tested in accordance with 5.16 and the insulation resistance shall be not less than 1 Mohm.

4.16 Short circuit protection

The battery system should have short-circuit protection.

4.17 Anti-leakage

The battery system shall be equipped with means or measures to prevent electrolyte leakage. The bracket, the casing and the like shall have anti-corrosion function.

5 Test methods

5.1 Test conditions

Unless otherwise specified, the test shall be carried out in the environment specified in this standard. The test environmental conditions are as follows.

-- electrolyte temperature. 25 ° C ~ 35 ° C;

-- Air humidity. 5% to 95%. NB / T 42040 -.2014

5.2 Test equipment

The accuracy requirements of the test instrument are as follows.

- voltmeter. accuracy of 0.5, internal resistance of at least 1kohm/V;

-- ammeter. accuracy of 0.5;

-- Thermometer. with appropriate range, the division value is not more than l ° C, the calibration accuracy is not lower than 0.5 ° C;

--Insulation resistance tester. the range meets the test requirements;

-- Electrical measuring equipment that can be adjusted by power, current and voltage through national institutions.

5.3 Appearance

Visual inspection of the appearance of the battery system, the appearance of the battery system should comply with the provisions of 4.2.

5.4 Rated watt-hour capacity test

Carry out the test of the rated watt-hour capacity of the battery system as follows.

a) charging the battery system to 100% SOC;

b) the battery system is discharged to a 30% SOC at rated power;

c) continue to discharge at 30% of the rated power until the discharge cut-off condition;

d) recording the SOC of the electrolyte during discharge;

e) repeat steps a) to d) 3 times;

f) calculating the average value of the watt-hour capacity of the discharge of the battery system for 3 charge and discharge cycles;

Note: For large-scale battery systems, considering the operability of the test, a unit battery system can be used instead of the battery system for testing.

g) If the value is greater than or equal to the rated watt-hour capacity specified by the manufacturer, it is considered to be satisfactory.

5.5 Rated power test

Carry out the test of the rated power of the battery system as follows.

a) the battery system is discharged to 0% SOC;

b) the battery system is charged at constant power until the charge cut-off condition;

c) the battery system discharges at a constant power until the discharge cut-off condition;

d) recording the SOC of the electrolyte during charging and discharging;

e) repeat steps b) to d) 3 times;

f) record the maximum continuous power during charging and discharging of the battery system;

Note: For large-scale battery systems, considering the operability of the test, a unit battery system can be used instead of the battery system for testing.

g) The value is greater than or equal to the rated power specified by the manufacturer and meets the requirements of 4.3 and 4.5.

5.6 Battery system rated energy efficiency test

Perform the battery system rated energy efficiency test as follows.

a) charging the battery system to 100% SOC;

b) the battery system discharges at rated power until the discharge cut-off condition;

c) the battery system is charged at rated power until the charge cut-off condition;

d) recording the SOC of the electrolyte during charging and discharging;

e) repeat steps b) to c) 3 times;

f) record the charge and discharge watt hour capacity data of the last cycle;

Note: For large-scale battery systems, considering the operability of the test, a unit battery system can be used instead of the battery system for testing.

5.7 Capacity retention test

Carry out the test of the capacity retention capacity of the battery system as follows.

a) charging the battery system to 100% SOC;

b) the battery system discharges at rated power until the discharge cut-off condition;

c) the battery system is charged at rated power until the charge cut-off condition;

d) recording the SOC of the electrolyte during charging and discharging;

e) repeating steps b) to d) for 99 times;

f) The battery system performs the capacity test according to the method specified in 5.4 and records the discharge watt hour capacity data;

Note: For large-scale battery systems, considering the operability of the test, a unit battery system can be used instead of the battery system for testing.

Perform the test of the low temperature storage performance of the battery system as follows.

a) charging the battery system to 100% SOC;

b) The battery system is shut down, the electrolyte temperature is lowered to not higher than 5 ° C and maintained for 12 h;

Note: Considering the operability of the test, you can use the stack and electrolyte that make up the battery system to assemble a small battery system that can perform test functions instead. The primary battery system is tested.

c) The electrolyte does not precipitate or crystallize, and the electrolyte temperature is restored to normal temperature;

d) Repeat steps b) to c) three times to record the watt-hour capacity data of the last cycle of discharge;

e) The ratio of the volt-hour capacity of the last cycle to the rated watt-hour capacity data shall be in accordance with 4.7.

5.9 High temperature storage performance test

Perform the test of the high temperature storage performance of the battery system as follows.

a) charging the battery system to 100% SOC;

b) The battery system is shut down, the electrolyte temperature is raised to not lower than 40 ° C and maintained for 12 h;

Note: Considering the operability of the test, you can use the stack and electrolyte that make up the battery system to assemble a small battery system that can perform test functions instead. The primary battery system is tested.

c) The electrolyte does not precipitate or crystallize, and the electrolyte temperature is restored to normal temperature;

d) Repeat steps b) to c) three times to record the watt-hour capacity data of the last cycle of discharge;

e) The ratio of the watt-hour capacity of the last cycle to the rated watt-hour capacity data shall be in accordance with 4.8.

5.10 Overcharge protection test

After the battery system is charged to the charge cut-off condition at rated power, it continues to be charged at a constant power, and the battery system should automatically start overcharging. Electric alarm function. NB / T 42040 -.2014

5.11 Over-discharge protection test

After the battery system discharges to the discharge cut-off condition at rated power, it continues to discharge at a constant power, and the battery system should automatically start over-discharge. Electric alarm function.

5.12 Charging characteristic test

Perform the test of the battery system charging characteristic curve as follows.

a) the battery system is discharged to 0% SOC;

b) the battery system is charged at constant power until the charge cut-off condition;

c) recording the SOC of the battery system charging process;

d) Repeat steps a) to c) with 5 different power values and form a charging curve.

Note 1. The battery system should reach 100% SOC when charging with minimum power, and should not exceed 50% SOC when charging at maximum power.

Note 2. For large-scale battery systems, considering the operability of the test, a unit battery system can be used instead of the battery system for testing.

5.13 Discharge characteristic curve test

Perform the test of the battery system discharge characteristic curve as follows.

a) charging the battery system to 100% SOC;

b) the battery system discharges at a constant power until the discharge cut-off condition;

c) recording the SOC of the battery system discharge process;

d) Repeat steps a) to c) with 5 different power values and form a discharge curve.

Note 1. The battery system should reach 0% SOC when discharging at minimum power, and should not be less than 50% SOC when discharging at maximum power.

Note 2. For large-scale battery systems, considering the operability of the test, a unit battery system can be used instead of the battery system for testing.

5.14 Flame retardant performance test

Perform the test of the flame retardant performance of the battery system as follows.

a) Horizontal method. according to the provisions of Chapter 8 of GB/T 2408-2008, the outer casing, storage tank, pipeline and internal of the battery system after the test The relevant important parts of the Ministry shall comply with the requirements of FH-1 (horizontal level) of Article 8.3.2 of GB/T 2408-2008;

b) Vertical method. according to the provisions of Chapter 9 of GB/T 2408-2008, after the test, the outer casing, storage tank, pipeline and internal of the battery system The relevant important parts of the Ministry shall comply with the requirements of FV-0 (vertical level) in 9.3.2 of GB/T 2408-2008.

5.15 Explosion-proof performance test

Carry out the test of the explosion-proof performance of the battery system as follows.

a) should be tested after confirming that the safety measures are guaranteed;

b) The battery system is charged at rated power until the charge cut-off condition, and continues to remain charged;

c) After 1h, with a DC 24V power supply at a 2/3 height outside the tank (or the highest point of the battery system) without power failure Fuse the fuses of 1A to 3A and repeat the flame test twice;

d) The battery system shall not ignite or detonate.

5.16 Insulation resistance test

The insulation resistance tester is used to measure the insulation resistance between the positive and negative terminals of the battery system to ground. The test results should meet the requirements of 4.15.

6 Inspection rules

6.1 Inspection classification

The inspections specified in this standard are divided into factory inspection and type test.

6.2 Factory inspection

6.2.1 The product shall be inspected at the factory before leaving the factory. The inspection method is random inspection. The inspection items are shown in Table 1.

6.2.2 If one or more items fail in the factory inspection, the product shall be returned to the relevant department for rework and submitted for acceptance again. If If one or more failures are detected again, the product is judged to be unqualified. NB / T 42040 -.2014

6.3 Type inspection

6.3.1 Type inspection requirements

A type test should be performed when one of the following conditions occurs.

-- trial production of new products or small batch trial production;

- Regular sampling, continuous mass production of products shall not be less than once a year;

-- changes in design or process are sufficient to cause a change in the performance of the product;

--Products are transferred to the factory for production or long-term stop (more than the regular sampling period) and resume production after production;

-- when the customer has special requirements;

-- When the superior quality supervision department has requirements.

6.3.2 Decision rules

When all the test items meet the requirements, the type test is passed. If any item does not meet the specified requirements, then add If the sample is not qualified, the type test is judged to be unqualified.

6.3.3 Sampling method

Samples for type inspection shall be of the same battery system as the normal production of materials, equipment and processes, and the inspection items are shown in Table 2.

7 logo, instruction manual

7.1 Mark

7.1.1 The following signs should be on the product.

a) the name of the manufacturer or its registered trademark;

b) the nominal specification of the battery system, expressed as. rated power/rated capacity;

c) the date of manufacture or serial number of the battery system;

d) the polarity symbol;

e) Warning signs, the contents of the warning signs should include vibration hazards, crushing hazards, corrosive liquids, etc.

7.1.2 The outer wall of the package shall have the following signs.

a) the name, model, specification and quantity of the product, the name of the manufacturer, the address of the factory, and the zip code;

b) product standard number;

c) net weight and gross weight per box;

d) Marking signs indicating moisture, frost, no inverted, light, corrosive, dangerous, etc.

7.2 User's Manual

Instructions for use shall comply with the requirements of GB/T 9969-2008.

8 Packaging, transportation, storage

8.1 Packaging

8.1.1 The packaging of the battery system shall comply with the requirements of moisture, vibration and corrosion.

8.1.2 The following documents accompanying the product shall be loaded in the package.

--Packing List;

--Product certification;

--Instruction Manual.

8.2 Transportation

8.2.1 During transportation, the product shall not be subjected to severe mechanical impact, exposure to the sun, or rain, and shall not be inverted.

8.2.2 During the loading and unloading process, the product should be handled lightly, and it is strictly forbidden to throw, roll, and press. If necessary, a crane or similar should be provided. The equipment is loaded and unloaded.

8.3 Storage

8.3.1 The product shall be designed and packaged so that it can be stored safely without damage (eg sufficient stability and special reinforcement).

8.3.2 The product should be stored in a dry, clean and well ventilated warehouse at a temperature between 0 °C and 40 °C.

8.3.3 The product shall be free from direct sunlight and shall not be less than 2 m away from the heat source.

8.3.4 Do not invert and lay down, and avoid mechanical shock and heavy pressure.

16 Anti-leakage 4.17

NB / T 42040 -.2014

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download NB/T 42040-2014

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

NB/T 42040-2014

$199.00