NB/T 42001.1-2012The norm of energy consumption per unit product of thermal power equipment manufacturing enterprises. Part 1: Utility boiler (English PDF)
This is a limited preview
Buy now to download the full PDF (11 pages)
Need quotation for your management?
Get a formal quotation for NB/T 42001.1-2012 in 30 minutes.
Issued by
National Energy Administration
Level / Type
National · Recommended
Issue date
August 23, 2012
Implementation date
December 1, 2012
Scope
NB/T 42001.1-2012 (The norm of energy consumption per unit product of thermal power equipment manufacturing enterprises. Part 1: Utility boiler) is available as an English-translated PDF.
NB/T 42001.1-2012 — This standard specifies the power plant boiler energy consumption per unit of product technical requirements, computing principles, calculation methods and energy management with concrete measures.
Found what you need?
Document preview — NB/T 42001.1-2012
National Standard of the People's Republic of China
- ICS
- 27.060
- Classification
- J 98
Issued by: National Energy Administration
Contents
- What this standard covers1
- Document data2
- Standards quoted by this document3
What this standard covers
This standard specifies the power plant boiler energy consumption per unit of product technical requirements, computing principles, calculation methods and energy management with concrete measures. Some of the products covered by the rated power of 50MW a
Document data
International classification (ICS): 27.060.
Chinese classification (CCS): J98.
Estimated length of the Chinese original: 17,114 words.
Standards quoted by this document
GB/T 2589; GB/T 12723-2008; GB 17167
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 11 pages — is available in the English PDF.
How to Download NB/T 42001.1-2012
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
NB/T 11758-2025 — Specification for Quality Evaluation of Household Photovoltaic Power Generation System Work
NB/T 11759-2025 — Technical regulations for distributed wind power operation and maintenance
NB/T 11760-2025 — Technical specification for oil spill monitoring in offshore wind farms
Secure payment via Stripe
Payments accepted
NB/T 42001.1-2012
$664.00