NB/T 35107-2017Preparation regulation for bidding design budgetary estimate of hydropower projects (English PDF)
水电工程招标设计概算编制规定
This is a limited preview
Buy now to download the full PDF (18 pages)
Need quotation for your management?
Get a formal quotation for NB/T 35107-2017 in 30 minutes.
Issued by
NEA
Level / Type
Industry · Recommended
Issue date
November 15, 2017
Implementation date
March 1, 2018
Scope
NB/T 35107-2017 is the English-translated version of 水电工程招标设计概算编制规定.
NB/T 35107-2017 is the Chinese energy industry standard that sets out how the budgetary estimate accompanying the bidding design of a hydropower project is to be prepared.
It concerns the stage at which the works of a scheme are put out to tender, and belongs to the cost and estimating part of the hydropower series rather than to its engineering codes.
The document carries the Chinese classification P02 and ICS 27.140 and was issued by the National Energy Administration. Its rules are used with DL/T 5212, NB/T 35106, NB/T 35031, NB/T 35033, NB/T 35072 and NB/T 35073. Issued on 15 November 2017, it has applied since 1 March 2018.
Found what you need?
Document preview — NB/T 35107-2017
National Standard of the People's Republic of China
- ICS
- 27.140
Issued by: National Energy Administration of the People's Republic of China
Contents
- 2 Normative references
2 Normative references
NB/T 35107-2017 cites the following standards, which apply in full or in part through the references made to them in its clauses.
DL/T 5212
NB/T 35106
NB/T 35031
NB/T 35033
NB/T 35072
NB/T 35073
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 18 pages — is available in the English PDF.
Referenced standards
Normative references
- DL/T 5212Code on compiling tender design report of hydropower projects
- NB/T 35106Preparation Regulation for Sub-bidding Budgetary Estimate of Hydropower Projects
- NB/T 35031Preparation regulation of special investment on safety monitoring system of hydropower proiect
- NB/T 35033Preparation regulation for special investment on environmentalprotection design of hydropower project
- NB/T 35072Preparation regulation for special investment on soil and water conservation of hydropower projects
- NB/T 35073Preparation regulation for special investment on hydrological surveying and forecasting and sediment monitoring of hydropower projects
Similar standards
How to Download NB/T 35107-2017
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 5212-2005 — Code on compiling tender design report of hydropower projects
NB/T 35031-2014 — Preparation regulation of special investment on safety monitoring system of hydropower project
NB/T 35031-2025 — Preparation regulation of special investment on safety monitoring system of hydropower proiect
Secure payment via Stripe
Payments accepted
NB/T 35107-2017
$315.00