NB/T 25103-2019Guideline for commissioning generator cooling system of nuclear power plant (PWR) (English PDF)
压水堆核电厂发电机冷却系统调试导则
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for NB/T 25103-2019 in 30 minutes.
Issued by
NEA
Level / Type
Industry · Recommended
Issue date
January 1, 2019
Implementation date
January 1, 2019
Scope
NB/T 25103-2019 is the English-translated version of 压水堆核电厂发电机冷却系统调试导则.
NB/T 25103-2019 is the Chinese standard "Guideline for commissioning generator cooling system of nuclear power plant (PWR)".
Found what you need?
Document preview — NB/T 25103-2019
National Standard of the People's Republic of China
- ICS
- 27.120
Contents
- [Preview only]
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 Technical requirements
- 4.1 Environmental conditions
- 4.2 Operating conditions during on-grid operation
- 4.3 Wind turbine conditions during off-grid power supply
- 4.4 Bearing current
- 4.5 Isolation insulation resistance
- 4.6 Performance requirements
- 4.7 Sensors
- 4.8 Electromagnetic compatibility requirements
- 4.9 Human-machine interaction
- 5 Test methods
- 5.1 Test requirements
- 5.2 Test principles and methods
- 6.1 Samples and interfaces
- 6.2 Technical requirements for test items
- 7 Inspection rules
- 7.1 Basic function test
- 7.2 Touch current test
- 7.3 Loading test
- 7.4 Braking test
- 7.5 Machine-side differential mode voltage dU/dt value
- 7.6 Temperature rise test
- 7.7 Converter module current sharing test
- 7.8 Filter capacitor switching current test
- 7.9 Filter capacitor operating current test
- 8 Product nameplate, marking, packaging, transportation and storage
- 9 Assembly alignment of weldments
1 Foreword
NB/T 25103-2019 was issued by National Energy Administration of the People's Republic of China on 30 December 2019.
The NB/T prefix marks a recommended standard. It is not law in itself: it becomes binding when a contract names it, when a regulation or a mandatory standard refers to it, or when a producer declares conformity with it.
The document runs to 15 pages in English translation.
2 Scope Preview
NB/T 25103-2019 falls under ICS 27.120, in the field of energy and heat transfer engineering.
This catalogue holds 1,264 other NB/T standards in that field.
In this catalogue, NB/T standards carry edition years from 2009 to 2025.
3 About this standard
Sector: Energy Industry
Issued by: National Energy Administration of the People's Republic of China
English translation: about 15 pages (approximate)
4 Classification and status
International classification (ICS): 27.120
Prefix NB/T: recommended standard.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
How to Download NB/T 25103-2019
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
NB/T 10186-2026 — Technical specification for power conversion equipment used in photovoltaic-storage systems
NB/T 11969-2026 — Guide for energy efficiency assessment of off-board conductive chargers for electric vehicles
NB/T 11970-2026 — Specification for operation safety evaluation of grid-connected electric vehicle charging facilities
NB/T 25103-2019
$135.00