Valid

NB/T 25103-2019Guideline for commissioning generator cooling system of nuclear power plant (PWR) (English PDF)

压水堆核电厂发电机冷却系统调试导则

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for NB/T 25103-2019 in 30 minutes.

Issued by

NEA

Level / Type

Industry · Recommended

Issue date

January 1, 2019

Implementation date

January 1, 2019

Scope

NB/T 25103-2019 is the English-translated version of 压水堆核电厂发电机冷却系统调试导则.

NB/T 25103-2019 is the Chinese standard "Guideline for commissioning generator cooling system of nuclear power plant (PWR)".

Found what you need?

Document preview — NB/T 25103-2019

National Standard of the People's Republic of China

ICS
27.120

Contents

  • [Preview only]
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 Technical requirements
  • 4.1 Environmental conditions
  • 4.2 Operating conditions during on-grid operation
  • 4.3 Wind turbine conditions during off-grid power supply
  • 4.4 Bearing current
  • 4.5 Isolation insulation resistance
  • 4.6 Performance requirements
  • 4.7 Sensors
  • 4.8 Electromagnetic compatibility requirements
  • 4.9 Human-machine interaction
  • 5 Test methods
  • 5.1 Test requirements
  • 5.2 Test principles and methods
  • 6.1 Samples and interfaces
  • 6.2 Technical requirements for test items
  • 7 Inspection rules
  • 7.1 Basic function test
  • 7.2 Touch current test
  • 7.3 Loading test
  • 7.4 Braking test
  • 7.5 Machine-side differential mode voltage dU/dt value
  • 7.6 Temperature rise test
  • 7.7 Converter module current sharing test
  • 7.8 Filter capacitor switching current test
  • 7.9 Filter capacitor operating current test
  • 8 Product nameplate, marking, packaging, transportation and storage
  • 9 Assembly alignment of weldments

1 Foreword

NB/T 25103-2019 was issued by National Energy Administration of the People's Republic of China on 30 December 2019.

The NB/T prefix marks a recommended standard. It is not law in itself: it becomes binding when a contract names it, when a regulation or a mandatory standard refers to it, or when a producer declares conformity with it.

The document runs to 15 pages in English translation.

2 Scope Preview

NB/T 25103-2019 falls under ICS 27.120, in the field of energy and heat transfer engineering.

This catalogue holds 1,264 other NB/T standards in that field.

In this catalogue, NB/T standards carry edition years from 2009 to 2025.

3 About this standard

Sector: Energy Industry

Issued by: National Energy Administration of the People's Republic of China

English translation: about 15 pages (approximate)

4 Classification and status

International classification (ICS): 27.120

Prefix NB/T: recommended standard.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

How to Download NB/T 25103-2019

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

NB/T 25103-2019

$135.00