Valid

NB/T 20005.10-2013Carbon Steel and Low Alloy Steel for Pressurized Water Reactor Nuclear Power Plants - Part 10: Classes 2 and 3 Steel Pipes Welded with the Addition of Filler Metal (English PDF)

压水堆核电厂用碳钢和低合金钢 第10部分:用填充金属焊接的2、3级钢管

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for NB/T 20005.10-2013 in 30 minutes.

Issued by

NEA

Level / Type

Industry · Recommended

Issue date

June 8, 2013

Implementation date

October 1, 2013

Scope

NB/T 20005.10-2013 is the English-translated version of 压水堆核电厂用碳钢和低合金钢 第10部分:用填充金属焊接的2、3级钢管.

NB/T 20005.10-2013 is the Chinese energy industry standard covering carbon Steel and Low Alloy Steel for Pressurized Water Reactor Nuclear Power Plants, Part 10: Classes 2 and 3 Steel Pipes Welded with the Addition of Filler Metal.

It was issued on 8 June 2013 and has been in force since 1 October 2013, as a first edition. The document is under the responsibility of the National Energy Administration.

This page is published from the official record of the 2013 edition. The figures, limits and tables the standard contains are those of the document itself, delivered in full with the English translation.

Found what you need?

Document preview — NB/T 20005.10-2013

National Standard of the People's Republic of China

Issued by: National Energy Administration of the People's Republic of China

Contents

  • [Preview only]
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 General requirements
  • 4.1 Environmental conditions
  • 4.2 Basic principles
  • 4.3 Basic process
  • 5 Technical Requirements
  • 6 Test methods
  • 7 Inspection Rules
  • 8 Marking, packaging, transportation and storage
  • 9 Evaluation indicators

1 Foreword

NB/T 20005.10-2013 was issued by National Energy Administration of the People's Republic of China on 8 June 2013 and has been in force since 1 October 2013.

It is one of 45 parts of the NB/T 20005 series.

The NB/T prefix marks a recommended standard. It is not law in itself: it becomes binding when a contract names it, when a regulation or a mandatory standard refers to it, or when a producer declares conformity with it.

2 Scope Preview

NB/T 20005.10-2013 carries no ICS number and no Chinese Standard Classification code.

This catalogue holds 4,537 other NB/T standards.

Of the 1,959 NB/T standards that do carry an ICS number, 1,265 (65%) fall under ICS 27, in the field of energy and heat transfer engineering.

3 About this standard

Issued by: National Energy Administration of the People's Republic of China

English translation: about 15 pages

4 Related standards

Other parts of this standard:

NB/T 20005.1-2010 — Part 1: Classes 1, 2, 3 Forgings

NB/T 20005.1-2019 — Carbon steel and low-alloy steel for pressurized water reactor nuclear power plants. Part 1: Grade 1, 2, 3 forgings

NB/T 20005.1-2024 — Carbon steel and low alloy steel for pressurized water reactor nuclear power plants - Part 1: Forgings and rolled products for level 1, 2 and 3 equipment

NB/T 20005.2-2012 — Part 2: Forgings for Classes 2, 3 Heat Exchanger Tube Plates

NB/T 20005.2-2019 — Carbon steel and low alloy steel for pressurized water reactor nuclear power plants. Part 2: Tube sheet forgings for heat exchangers of grades 2 and 3

NB/T 20005.3-2012 — Part 3: Forgings for Classes 2, 3 Auxiliary Pump Shafts

NB/T 20005.4-2012 — Carbon steel and low alloy steel for pressurized water reactor nuclear power plants - Part 4: Forged or rolled parts for main steam systems, main feedwater flow control systems, auxiliary feedwater systems and turbine bypass systems

NB/T 20005.4-2019 — Carbon steel and low alloy steel for pressurized water reactor nuclear power plants Part 4: Forging and rolling parts for main steam system, main feedwater flow control system, auxiliary feedwater system and steam turbine bypass system

NB/T 20005.5-2013 — Part 5: Classes 1, 2 and 3 Pressure Retaining Castings

NB/T 20005.5-2019 — Carbon steel and low-alloy steel for pressurized water reactor nuclear power plants. Part 5: Class 1, 2, and 3 pressure castings

NB/T 20005.6-2013 — Part 6: Motor Support Stand Casting for Reactor Coolant Pumps

NB/T 20005.7-2010 — Part 7: Classes 1, 2, 3 Plates

NB/T 20005.7-2017 — Carbon steel and low alloy steel for pressurized water reactor nuclear power plants - Part 7: Class 1, 2, 3 plates

NB/T 20005.7-2024 — Carbon steel and low alloy steel for pressurized water reactor nuclear power plants - Part 7: Steel plates for level 1, 2 and 3 equipment

NB/T 20005.8-2012 — PWR Nuclear Power Plant - Part 8: Steel Plates, Beams and Bars for Classes S1 and S2 Supports

NB/T 20005.9-2010 — Part 9: Seamless Steel Pipes for Classes 2, 3 Piping

NB/T 20005.9-2017 — Carbon steel and low alloy steel for pressurized water reactor nuclear power plants - Part 9: Class 2,3 seamless steel pipes

NB/T 20005.9-2024 — Carbon steel and low alloy steel for pressurized water reactor nuclear power plants - Part 9: Seamless steel tubes for level 2 and 3 equipment

NB/T 20005.11-2012 — Plant - Part 11: Seamless Pipes for Classes S1 and S2 Supports

NB/T 20005.12-2010 — Part 12: Seamless Steel Pipes for Use in Main Steam Systems, Feedwater Flow Control Systems, Auxiliary Feedwater Systems and Turbine Bypass Systems

NB/T 20005.12-2017 — Carbon steel and low alloy steel for pressurized water reactor nuclear power plants - Part 12: Seamless steel pipes for use in main steam systems, feedwater flow control systems, auxiliary feedwater systems and turbine bypass systems

NB/T 20005.13-2012 — Part 13: Seamless Drawn Carbon Steel Tubes for Classes 2 and 3 Heat Exchangers

NB/T 20005.13-2019 — Carbon steel and low-alloy steel for pressurized water reactor nuclear power plants Part 13: Seamless steel tubes for heat transfer tubes of Class 2 and 3 heat exchangers

NB/T 20005.14-2012 — Part 14: Classes 2 and 3 Butt-welding Seamless Fittings

NB/T 20005.14-2019 — Carbon steel and low alloy steel for pressurized water reactor nuclear power plants Part 14: Butt-welded seamless pipe fittings of grades 2 and 3

NB/T 20005.15-2013 — Part 15: Fittings Welded with the Addition of Filler Metal for Use in Classes 2 and 3 Auxiliary Piping

NB/T 20005.15-2019 — Carbon steel and low alloy steel for pressurized water reactor nuclear power plants Part 15: Grade 2 and 3 pipe fittings welded with filler metals

NB/T 20005.16-2012 — Part 16: Elbow for Main Steam System

NB/T 20005.16-2019 — Carbon steel and low alloy steel for pressurized water reactor nuclear power plants Part 16: Elbow for main steam system

NB/T 20005.16-2024 — Carbon and low alloy steels for pressurized water reactor nuclear power plants - Part 16: Elbows for main steam pipes

NB/T 20005.18-2018 — Carbon steel and low alloy steel for pressurized water reactor nuclear power plants - Part 18: Castings for main steam isolation valve bodies

NB/T 20005.19-2021 — Carbon steel and low alloy steel for pressurized water reactor nuclear power plants - Part 19: P280GH forgings for containment mechanical penetrations in main steam system and main feedwater system

NB/T 20005.19-2024 — Carbon and low alloy steels for pressurized water reactor nuclear power plants - Part 19: Forgings for containment mechanical penetrations

NB/T 20005.31-2015 — Carbon steel and low alloy steel for pressurized water reactor nuclear power plants - Part 31: 15Mn forgings for containment vessel

NB/T 20005.32-2015 — Carbon steel and low alloy steel for pressurized water reactor nuclear power plants - Part 32: 15MnHR steel plates for containment vessel

NB/T 20005.33-2015 — Carbon steel and low alloy steel for pressurized water reactor nuclear power plants - Part 33: 15Mn steel pipes for containment vessel

NB/T 20005.34-2015 — Carbon steel and low alloy steel for pressurized water reactor nuclear power plant - Part 34: Carbon steel shear studs for containment vessel

NB/T 20005.35-2017 — Carbon and low alloy steel for pressurized water reactor nuclear power plants - Part 35: Carbon steel tube used for control rod drive mechanism

NB/T 20005.36-2017 — Carbon steel and low alloy steel for pressurized water reactor nuclear power plants - Part 36: 24Mn bars for steam generator

NB/T 20005.37-2017 — Carbon and low alloy steel for pressurized water reactor nuclear power plants - Part 37: 17Mn steel forgings for steam generator

NB/T 20005.38-2017 — Carbon steel and low alloy steel for pressurized water reactor nuclear power plants - Part 38: 15MnHR welded steel pipe for mechanical penetration assemblies of containment vessel

NB/T 20005.39-2018 — Carbon steel and low alloy steel for pressurized water reactor nuclear power plants - Part 39: 15Mn forgings for containment vessel mechanical penetrations

NB/T 20005.40-2018 — Carbon steel and low alloy steel for pressurized water reactor nuclear power plants - Part 40: Low alloy steel plates for nuclear safety related equipment

NB/T 20005.41-2018 — Carbon steel and low alloy steel for pressurized water reactor nuclear power plants - Part 41: Low alloy steel pipes for nuclear safety related equipment

Other editions:

NB/T 20005.10-2024 (later edition)

NB/T 20005.10-2019 (later edition)

Standards on related subjects:

GB/T 19879-2023 — Steel plate for building structure

GB/T 20564.1-2017 — Continuously cold-rolled high strength steel sheet and strip for automobiles - Part 1: Bake hardening steel

GB/T 20564.10-2017 — Continuously cold-rolled high strength steel sheet and strip for automobiles - Part 10: Twinning induced plasticity steel

5 Classification and status

Prefix NB/T: recommended standard.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Similar standards

How to Download NB/T 20005.10-2013

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

NB/T 20005.10-2013

$229.00