NB/T 11792-2025Regulation for the content depth for the feasibility study report of the electric power management information system project (English PDF)
This is a limited preview
Buy now to download the full PDF (22 pages)
Need quotation for your management?
Get a formal quotation for NB/T 11792-2025 in 30 minutes.
Issued by
National Energy Administration
Level / Type
National · Recommended
Issue date
June 30, 2025
Implementation date
December 30, 2025
Scope
NB/T 11792-2025 (Regulation for the content depth for the feasibility study report of the electric power management information system project) is available as an English-translated PDF.
NB/T 11792-2025 — Regulation for the content depth for the feasibility study report of the electric power management information system project
Found what you need?
Document preview — NB/T 11792-2025
National Standard of the People's Republic of China
- ICS
- 35.240.50
- Classification
- F 21
Issued by: National Energy Administration
Contents
- Document data1
Document data
International classification (ICS): 35.240.50.
Chinese classification (CCS): F21.
Estimated length of the Chinese original: 33,349 words.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 22 pages — is available in the English PDF.
How to Download NB/T 11792-2025
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
NB/T 11758-2025 — Specification for Quality Evaluation of Household Photovoltaic Power Generation System Work
NB/T 11759-2025 — Technical regulations for distributed wind power operation and maintenance
NB/T 11760-2025 — Technical specification for oil spill monitoring in offshore wind farms
Secure payment via Stripe
Payments accepted
NB/T 11792-2025
$654.00