Scope
NB/T 11429-2023 is the English-translated version of 煤矿 TBM 安装技术规范.
NB/T 11429-2023 — This document specifies the ground installation site requirements, underground installation chamber requirements, pre-installation preparations, lifting equipment requirements, and other requirements for coal mine TBMs.
Requirements, assembly technical requirements, coal mine TBM assembly, equipment commissioning, and installation acceptance. This document applies to the installation, commissioning and acceptance of TBM in coal mines.
Found what you need?
Document preview — NB/T 11429-2023
National Standard of the People's Republic of China
- ICS
- 73.020
- Classification
- D 01
Issued by: National Energy Administration
Contents
- Preface
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 Ground Installation Site Requirements
- 5 Requirements for underground installation chamber
- 6 Pre-installation preparation
- 7 Lifting equipment requirements
- 8 Assembly Technical Requirements
- 8.1 Mechanical Assembly
- 8.2 Hydraulic assembly
- 8.3 Electrical assembly
- 9 Coal Mine TBM Assembly
- 9.1 Assembly Procedure
- 9.2 Assembly preparation
- 9.3 Coal Mine TBM Mainframe Assembly
- 9.4 Coal Mine TBM Post-Assembly System Assembly
- 10 Equipment Debugging
- 10.1 Coal Mine TBM Commissioning Requirements
- 10.2 Preparations before commissioning
- 10.3 Power supply system commissioning
- 10.4 Hydraulic system debugging
- 10.5 Cooling system commissioning
- 10.6 Lubrication system commissioning
- 10.7 Main drive system commissioning
- 10.8 Debugging of each cylinder's movements
- 10.9 Belt Conveyor System Debugging
- 10.10 Communication and monitoring system debugging
- 10.11 Emergency stop system debugging
- 10.12 Gas Detection System Debugging
- 10.13 Water supply and drainage system commissioning
- 10.14 Guidance System Debugging
- 10.15 Other requirements
- 11 Installation acceptance
- Reference
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting.
1 Scope
This document specifies the ground installation site requirements, underground installation chamber requirements, pre-installation preparations, lifting equipment requirements, and other requirements for coal mine TBMs.
Requirements, assembly technical requirements, coal mine TBM assembly, equipment commissioning, and installation acceptance.
This document applies to the installation, commissioning and acceptance of TBM in coal mines.
2 Normative references
The contents of the following documents constitute the essential clauses of this document through normative references in this document.
For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to this document.
Coal Mine Safety Regulations [Ministry of Emergency Management (2022 Edition)] Standard for the integrity of electromechanical equipment in coal mines [Ministry of Coal Industry of the People's Republic of China (1987 edition)]
3 Terms and definitions
The following terms and definitions apply to this document.
coal mine TBM coalmine TBM by rotating the cutterhead and pushing it forward, the roller cutter squeezes and crushes the rock, and the entire section of the coal mine tunnel can be excavated and formed at one time, integrating exploration, excavation, support and transportation.
A general term for a complete set of equipment.
Assembly tunnel
According to the design requirements, it meets the requirements of TBM assembly and stepping, and is equipped with lifting equipment, ventilation, water supply, gas supply facilities and lighting.
Alley.
Launch tunnel
It can accommodate the TBM main machine so that its support shoes can support a section of the tunnel wall.
Front shield the front section of the shield of a shield-type coal mine TBM is mainly used to support the main drive.
Telescopic shield
Located between the front shield and the support shield, it consists of two parts, the inner and outer parts, which move relative to each other and can protect the safety of equipment and personnel in the area.
Ring housing.
[Source. GB/T 41056-2021, 3.10] 3.6 supportshield A shield used to hold the cave wall tight.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 13 pages — is available in the English PDF.
How to Download NB/T 11429-2023
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
NB/T 10086-2025 — Regulations for Compiling Energy Conservation Reports for Wind Farm Projects
NB/T 10103-2025 — Technical Specifications for Micro-Site Selection in Wind Farm Projects
NB/T 10116-2025 — Recommended Practices for Reducing the Impact of Hydraulic Fracturing Operations on the Surface Environment
Secure payment via Stripe
Payments accepted
NB/T 11429-2023
$330.00