Valid

NB/T 10761-2021Technical requirement of fully mechanized mining with solid backfilling and caving in coal mines (English PDF)

煤矿综合机械化固体充填与垮落协同采煤法技术要求

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for NB/T 10761-2021 in 30 minutes.

Issued by

NEA

Level / Type

Industry · Recommended

Issue date

November 16, 2021

Implementation date

February 16, 2022

Scope

NB/T 10761-2021 is the English-translated version of 煤矿综合机械化固体充填与垮落协同采煤法技术要求.

NB/T 10761-2021 describes a coal mining method in which one fully mechanized face is divided along its length into a solid backfilling section and a caving section, with a transition zone between them where backfilling supports even out the roof pressure.

It sets the conditions under which the method is suitable, the layout of the mining and backfilling systems, the equipment set, and how the mining process and backfilling results are controlled and monitored.

The method is aimed at mines that must keep face output up while disposing of large volumes of waste rock. Equipment references include hydraulic supports for coal mines, scraper conveyors, belt conveyors and the NB/T standards on backfilling supports, crawler-mounted belt loaders and porous bottom-discharge conveyors. Issued on 16 November 2021, it has applied since 16 February 2022.

Found what you need?

Document preview — NB/T 10761-2021

National Standard of the People's Republic of China

Classification
D 15

Issued by: National Energy Administration of the People's Republic of China

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules of Standardization Documents" drafted.

1 Scope

This standard specifies the applicable conditions, mining and filling system layout, equipment composition, Control and monitoring of mining process and filling effect.

This standard is applicable to mines that not only need to ensure the production capacity of the working face, but also need large-scale treatment of gangue. Cooperative mining face.

2 Normative references

The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to this document.

GB 25974.1-2010 Hydraulic supports for coal mines - Part 1: General technical conditions

MT/T 105-2006 General technical conditions for scraper conveyors

MT820-2006 Technical conditions of belt conveyor for coal mine

NB/T 50120-2014 Technical conditions for solid filling hydraulic supports for coal mines

NB/T 51002-2012 Comprehensive mechanized solid filling coal mining method

NB/T 51021-2014 Technical conditions of crawler walking solid filling material belt loader

NB/T 51024-2014 Technical conditions of porous bottom discharge scraper conveyor for solid filling materials

3 Terms and Definitions

The following terms and definitions apply to this document.

3.1 Solid backfilling and caving cooperative mining

In the same fully mechanized working face, the mining method of roof cooperating management by filling method and caving method is adopted along the inclined direction of the working face.

3.2 Backfilling section

Filling segment backfilingarea.

The solid filling method is used to manage the area of the roof in the working face of the solid filling method and the caving method.

3.3 Caving section

The caving method is used to manage the area of the roof in the co-mining working face of the solid filling method and the caving method.

3.4 Transition section

It is a part of the filling section (3.2), and the hydraulic support for filling coal mining is mainly arranged in the transition section of the working face to realize the mining between the filling section and the caving section. area of smooth transition of pressure.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download NB/T 10761-2021

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

NB/T 10761-2021

$135.00