NB/T 10393-2020Technical Code for Construction Safety of Offshore Wind Power Projects (English PDF)
海上风电场工程施工安全技术规范
This is a limited preview
Buy now to download the full PDF (32 pages)
Need quotation for your management?
Get a formal quotation for NB/T 10393-2020 in 30 minutes.
Issued by
NEA
Level / Type
Industry · Recommended
Issue date
October 23, 2020
Implementation date
February 1, 2021
Scope
NB/T 10393-2020 is the English-translated version of 海上风电场工程施工安全技术规范.
NB/T 10393-2020 is the Chinese standard "Technical Code for Construction Safety of Offshore Wind Power Projects". Its scope clause reads: In order to standardize the construction safety of offshore wind farm projects, prevent and reduce personal injury and property damage during the construction process.
If it is lost, this specification is formulated. This code is applicable to the sea area construction of new construction, reconstruction and expansion of offshore wind farm projects.
The onshore construction of offshore wind farm projects shall comply with the current industry standard "Technical Regulations for Construction Safety of Onshore Wind Farm Projects" Fan" NB/T 10208.
The construction safety of offshore wind farm projects shall not only comply with this code, but shall also comply with the current relevant national standards. Its clauses include general; term; basic regulations; comprehensive management.
Found what you need?
Document preview — NB/T 10393-2020
National Standard of the People's Republic of China
- ICS
- 27.180
- Classification
- P 61
Issued by: National Energy Administration of the People's Republic of China
Contents
- 1 General1
- 2 Terminology2
- 3 Basic regulations4
- 4 Integrated Management5
- 4.1 Offshore personnel5
- 4.2 Construction of temporary facilities5
- 4.3 Electricity for construction6
- 4.4 Transportation6
- 4.5 Fire and explosion protection8
- 4.6 Ship operations9
- 4.7 Working at height9
- 4.8 Welding10
- 4.9 Diving operations10
- 4.10 Seasonal and special environment construction11
- 4.11 Marine equipment12
- 4.12 Safety protection facilities and personal protective equipment12
- 4.13 Occupational Health13
- 5 Foundation Engineering Construction14
- 5.1 General provisions14
- 5.2 Pile foundation construction14
- 5.3 Construction of steel components15
- 5.4 Concrete construction16
- 6 Equipment Installation18
- 7 Submarine cable construction20
- 8 Commissioning and trial operation21
- 9 Emergency Rescue22
- Explanation of terms used in this specification23
- List of Reference Standards24
- Attachment. Article description25
1 General
1.0.1
In order to standardize the construction safety of offshore wind farm projects, prevent and reduce personal injury and property damage during the construction process.
If it is lost, this specification is formulated.
1.0.2
This code is applicable to the sea area construction of new construction, reconstruction and expansion of offshore wind farm projects.
1.0.3
The onshore construction of offshore wind farm projects shall comply with the current industry standard "Technical Regulations for Construction Safety of Onshore Wind Farm Projects"
Fan" NB/T 10208.
1.0.4
The construction safety of offshore wind farm projects shall not only comply with this code, but shall also comply with the current relevant national standards.
2 term
2.0.1 construction site
The wind farm project construction unit and personnel carry out construction activities in accordance with the contract and laws and regulations, and the approved occupation
Construction site. Mainly include areas and places delineated by the project legal person, construction units and personnel rented to complete the engineering products
Or purchased areas or places and public areas and places temporarily occupied during production activities.
2.0.2 construction safety
The work field for the purpose of preventing various safety accidents during the construction work, and the law, technology, equipment,
Corresponding measures taken by the organization system and education.
2.0.3 offshore work platform
A work site set up for the construction of offshore wind farm projects in the sea area.
2.0.4 offshore operation
Construction management personnel, crew members, special operators and other construction personnel of offshore wind farm projects are constructing
Construction work carried out in the sea.
2.0.5 outboard work
Operations performed on the outside of the hull above the unloaded waterline.
2.0.6 Temporary facilities
Various non-permanent facilities built on the construction site for the construction of construction projects, mainly including construction water supply,
Power supply, integrated processing plant, mixing station, material warehouse, construction camp, temporary road, temporary wharf, temporary platform.
2.0.7 construction electric power supply
Provide power supply for project construction and installation, including power supply lines and electrical facilities.
2.0.8 personal protective equipment
The various protective products worn, equipped and used by practitioners to protect against physical, chemical, biological and other external factors
Collectively.
2.0.9 Safety protection facilities
Various facilities, equipment, appliances, etc. set up on the construction site to prevent casualties during construction.
2.0.10 J-tube
It is fixed on the foundation of the sea booster station or the foundation of the offshore wind turbine, shaped like the letter J, used to level the seabed
The laid submarine cables are converted to cable pipes that are laid upward to the sea booster station or offshore wind power generators.
2.0.11 Feathering
The geometric angle of attack of the wind turbine blade changes to a state where the wind turbine blade approaches zero lift.
3 Basic regulations
3.0.1
The construction unit shall establish a sound safety management organization, organize the establishment of a safety production committee, and establish a safety production management
System, clarify the responsibilities of safety management, establish and improve safety production rules and regulations, and promote the construction of safety production standardization,
Ensure the safety of project construction.
3.0.2
The construction unit shall establish a sound safety production supervision and inspection and hidden danger investigation and management mechanism, and implement the whole process of the construction site
Safety production management.
3.0.3
The construction unit shall establish an emergency management system for the engineering project, prepare a comprehensive emergency plan, organize survey, design, and implementation
Engineering, engineering supervision and other units to formulate emergency plans for various safety accidents, implement emergency organization, procedures, resources and measures, and determine
Organize drills regularly to ensure the effective implementation of emergency work.
3.0.4
Each participating unit shall establish a safety management organization, effectively implement the safety production responsibility system, and formulate overall and annual safety
Production goals, to ensure safe investment, and to do a good job in site civilized construction.
3.0.5
The personnel on the construction site shall have the basic knowledge and skills of the operations they are engaged in. Offshore personnel, special operations personnel
And special equipment operators shall receive special safety technical training and pass the examination, and obtain the corresponding qualifications before they can take up their posts.
industry.
3.0.6
The survey and design unit shall make technical and safety clarifications to the construction unit before the start of construction.
3.0.7
The construction unit shall apply for the construction permit in accordance with relevant regulations, conduct on-site surveys and identify hazards before starting construction.
Prepare construction organization design, construction plan and safety technical measures. Partial projects with greater risk should be prepared for special implementation
The construction plan shall organize experts to demonstrate the special construction plan of the dangerous and relatively large project exceeding a certain scale.
3.0.8
The construction unit shall plan and set the safety signs on the construction site, and the construction environment and operation procedures shall change
At the time, the site hazards and harmful factors should be re-identified, and safety signs should be dynamically arranged.
3.0.9
The construction unit shall formulate emergency rescue plans and on-site disposal plans according to the characteristics and scope of the project construction,
Sites and links prone to accidents shall be monitored.
3.0.10
The construction unit shall regularly organize construction site safety inspections and hidden dangers investigation and management, and strictly implement construction site safety
Measures to prevent the occurrence of illegal commands, illegal operations, and violations of labor discipline.
3.0.11
The construction unit shall be based on the characteristics of the construction work, the hazards and harmful factors and the corresponding safety operation regulations or safety
Technical measures, make safety technical clarifications to the construction personnel, and perform the signing procedures.
3.0.12
The supervision unit shall implement supervision in accordance with laws, regulations and mandatory engineering construction standards, and perform supervision of construction project safety
Management responsibilities.
4 Comprehensive management
4.1 Offshore personnel
4.1.1
Offshore personnel should have basic physical and psychological qualities, and have an understanding of offshore construction sites and work positions.
The existing dangerous and harmful factors and the corresponding preventive measures and accident emergency measures.
4.1.2
Before going to sea and while on board, marine operators do not...
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 32 pages — is available in the English PDF.
Similar standards
How to Download NB/T 10393-2020
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
NB/T 10086-2025 — Regulations for Compiling Energy Conservation Reports for Wind Farm Projects
NB/T 10103-2025 — Technical Specifications for Micro-Site Selection in Wind Farm Projects
NB/T 10116-2025 — Recommended Practices for Reducing the Impact of Hydraulic Fracturing Operations on the Surface Environment
Secure payment via Stripe
Payments accepted
NB/T 10393-2020
$485.00