NB/T 10113-2018Guide for technology supervision of photovoltaic power station (English PDF)
光伏发电站技术监督导则
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for NB/T 10113-2018 in 30 minutes.
Issued by
NEA
Level / Type
Industry · Recommended
Issue date
December 25, 2018
Implementation date
May 1, 2019
Scope
NB/T 10113-2018 is the English-translated version of 光伏发电站技术监督导则.
NB/T 10113-2018 is a recommended energy industry standard of China that guides technical supervision at photovoltaic power stations. It lays down the principles on which such supervision rests, the content it must cover and the management requirements that govern it.
The guidance is written for the technical supervision of photovoltaic power stations generally, rather than for one plant type or one item of equipment. It draws on DL/T 1051, which it lists as its single cited document.
Classified under F12 in the Chinese system and 27.160 internationally, it belongs with the solar power engineering documents issued by the National Energy Administration. Issued on 25 December 2018, it has applied since 1 May 2019.
Found what you need?
Document preview — NB/T 10113-2018
National Standard of the People's Republic of China
- ICS
- 27.160
Issued by: National Energy Administration of the People's Republic of China
Contents
- 2 Normative references
2 Normative references
NB/T 10113-2018 cites the following standards, which apply in full or in part through the references made to them in its clauses.
DL/T 1051
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Normative references
Similar standards
How to Download NB/T 10113-2018
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 1051-2019 — Guide for technology supervision in electrical power system
NB/T 10086-2025 — Regulations for Compiling Energy Conservation Reports for Wind Farm Projects
NB/T 10103-2025 — Technical Specifications for Micro-Site Selection in Wind Farm Projects
Secure payment via Stripe
Payments accepted
NB/T 10113-2018
$105.00