NB/T 10084-2018Guide for preparing operation procedures of hydropower projects (English PDF)

水电工程运行调度规程编制导则

Open the NB/T 10084-2018 preview as PDF

Preview — first pages of NB/T 10084-2018 (full document: 55 pages)

This is a limited preview

Buy now to download the full PDF (55 pages)

Issued by

NEA

Level / Type

Industry · Recommended

Issue date

October 29, 2018

Implementation date

March 1, 2019

Scope

NB/T 10084-2018 is the English-translated version of 水电工程运行调度规程编制导则.

NB/T 10084-2018 is the Chinese guide for preparing the operation and dispatch procedures of hydropower projects. Every reservoir is operated to a written procedure that fixes, for each season and each water level, how water is released and for what purpose: that document is what turns a dam into a managed system, and it is what an operator relies on when a flood arrives at night. This guide sets out how the procedure is to be written. It covers the general provisions and defined terms, then the basic data and design parameters the procedure must rest on - hydrology, reservoir characteristics, discharge capacities and the approved design operating rules. It then works through each purpose of operation in turn: power generation dispatch including peak regulation, capacity and ramp rate; flood control operation with the flood season levels and the rules for pre-release and for passing the flood; navigation, irrigation and water supply; ice regime operation in winter; the ecological flow to be maintained downstream; sediment management and flushing; and the operation of a cascade where several plants share a river. The coordination between purposes when they conflict, the emergency procedures, the operation of the reservoir area, and the arrangements for revising the procedure complete the guide, with appendices setting out the format of the procedure document.

Document preview — NB/T 10084-2018

National Standard of the People's Republic of China

ICS
27.140
Classification
P59

Issued by: National Energy Administration of the PRC

Contents

  • 1 General Provisions1
  • 2 Parameters and Basic Data2
  • 2.1 Parameters and Indexes2
  • 2.2 Basic Data3
  • 3 Hydrometeorological Forecast5
  • 3.1 Hydrometeorological Station Network5
  • 3.2 Hydrometeorological Forecast5
  • 3.3 Sediment Monitoring5
  • 4 Power Generation and Scheduling6
  • 4.1 Objective and Principle6
  • 4.2 Operation Mode6
  • 4.3 Implementation Procedure7
  • 4.4 Safe Operation Criteria for Electromechanical Equipment8
  • 5 Flood Regulation and Management9
  • 5.1 Objective and Principle9
  • 5.2 Operation Mode9
  • 5.3 Implementation Procedure10
  • 5.4 Water Release Facilities Operating Modes10
  • 6 Navigational Operation11
  • 6.1 Objective and Principle11
  • 6.2 Navigable Levels and Discharge Flow11
  • 6.3 Navigation Structure Operation11
  • 6.4 Passing Dam Operation12
  • 6.5 Approach Channel Maintenance12
  • 6.6 Navigation Safety Rules13
  • 7 Irrigation and Water Supply14
  • 7.1 Objective and Principle14
  • 7.2 Operation Mode14
  • 7.3 Implementation Procedure14
  • 8 Ice-Jam Prevention15
  • 8.1 Objective and Principle15
  • 8.2 Operation Mode15
  • 8.3 Implementation Procedure15
  • 8.4 Deicing Facilities Operating Modes16
  • 9 Ecological Flow Discharge Regulation17
  • 10 Sediment Discharge Operation18
  • 10.1 Objective and Principle18
  • 10.2 Operation Mode18
  • 10.3 Implementation Procedure19
  • 10.4 Desilting Facilities Operating Modes19
  • 11 Hydraulic Structures Operation and Management20
  • 12 Project Area Management21
  • 12.1 Scope and Principle21
  • 12.2 Project Area Management21
  • 13 Operation and Management Implementation22
  • 13.1 Technical Support System22
  • 13.2 Comprehensive Operation Planning22
  • 13.3 Routine Management22
  • 13.4 Emergency Action Plan23
  • Appendix A Contents of Preparing Operation Precedures of Hydropower Projects24
  • Appendix B Salient Features of Hydropower Project27
  • Explanation of Wording in This Guide34
  • Addition: Explanation of Provisions35

Foreword

This document was issued on 29 October 2018 by the National Energy Administration of the PRC and takes effect on 1 March 2019.

It is a NB/T standard: recommended rather than compulsory, but it is the text a Chinese reviewer applies when assessing a submission.

It is classified under ICS 27.140, Chinese classification P59.

This guide was formulated by the drafting group in accordance with the requirements of the Notice of the National Energy Administration on Issuing the Second Batch of the 2012 Energy Sector Standard Formulation (Revision) Plan (Guo Neng Ke Ji [2012] No. 326), after extensive investigation and research, careful summarization of practical experience, and on the basis of widely soliciting opinions.

The main technical contents of this guide are: parameters and basic data, hydrometeorological forecast, power generation operation, flood control operation, navigation operation, irrigation and water supply operation, ice-jam prevention operation, ecological operation, sediment operation, requirements for the operation management of the project complex, project area management, and operation implementation management.

The National Energy Administration is in charge of the administration of this guide; China Renewable Energy Engineering Institute proposes it and is responsible for its routine management; and the Energy Industry Standardization Technical Committee for Hydropower Planning, Reservoir and Environmental Protection (Nengyuan Hangye Shuidian Guihua Shuiku Huanbao Biaozhunhua Jishu Weiyuanhui) is responsible for the interpretation of its specific technical contents.

Any opinions or suggestions arising during implementation should be sent to China Renewable Energy Engineering Institute (address: No. 2 Liupukang Beixiaojie, Xicheng District, Beijing; postcode: 100120).

Chief editing organization of this guide: PowerChina Kunming Engineering Corporation Limited.

Participating organizations of this guide: PowerChina Chengdu Engineering Corporation Limited; PowerChina Zhongnan Engineering Corporation Limited.

Principal drafters of this guide: Xiang Jun, Zhou Pengcheng, Li Liang, Zhou Tiezhu, Huang Yong, Zhou Jing, Zhang Jianhua, Han Bing, Yang Zijun, Zhou Jia, Zhao Song, Chen Jinsong.

Principal reviewers of this guide: Peng Caide, Wan Wengong, Zhao Zenghai, Yang Baiyin, Yang Dequan, Yan Bibo, Zhao Yunfa, He Yubin, Ma Dengqing, Ji Jinhua, Feng Li, Yang Dinggui, Guo Yunfeng, Fan Guofu, Zhou Yun, Yang Lifeng, Li Jianhua, Piao Ling, Li Shisheng.

Publication data

NB/T 10084-2018 is an Energy Industry Standard of the People's Republic of China entitled Guide for Preparing Operation Procedures of Hydropower Projects (Chinese title: Shuidian Gongcheng Yunxing Diaodu Guicheng Bianzhi Daoze).

Classification data printed on the cover: ICS 27.140; CCS P59; filing number J2608-2018.

The standard was issued on 2018-10-29 and implemented on 2019-03-01. It was issued by the National Energy Administration.

Chief editing department: China Renewable Energy Engineering Institute. Approving department: National Energy Administration. Date of implementation: March 1, 2019. Published in Beijing, 2019.

Announcement of the National Energy Administration, 2018 No. 12: In accordance with the relevant provisions of the Notice of the National Energy Administration on Issuing the Administrative Measures for Energy Sector Standardization (Trial) and the Detailed Rules for their Implementation (Guo Neng Ke Ji [2009] No. 52), and after review, the National Energy Administration approved 204 sector standards, including Air-Cooled Speed-Regulating Magnetic Couplings for Mining Use, of which 54 are energy standards (NB), 8 are petrochemical standards (NB/SH) and 142 are petroleum standards (SY), and hereby publishes them. Attachment: catalogue of sector standards. National Energy Administration, October 29, 2018.

In the attached catalogue of sector standards, NB/T 10084-2018 Guide for Preparing Operation Procedures of Hydropower Projects is listed as serial number 39, with no superseded standard and no adopted standard indicated, approval date 2018-10-29 and implementation date 2019-03-01.

Structure of the standard

Chapter 1 General Provisions begins on page 1 of the standard.

Chapter 2 Parameters and Basic Data (page 2) comprises 2.1 Parameters and Indexes and 2.2 Basic Data.

Chapter 3 Hydrometeorological Forecast (page 5) comprises 3.1 Hydrometeorological Station Network, 3.2 Hydrometeorological Forecast and 3.3 Sediment Monitoring.

Chapter 9 Ecological Flow Discharge Regulation begins on page 17.

Chapter 11 Hydraulic Structures Operation and Management begins on page 20.

Chapter 12 Project Area Management (page 21) comprises 12.1 Scope and Principle and 12.2 Project Area Management.

Chapter 13 Operation and Management Implementation (page 22) comprises 13.1 Technical Support System, 13.2 Comprehensive Operation Planning, 13.3 Routine Management and 13.4 Emergency Action Plan.

Appendix A, Contents of Preparing Operation Procedures of Hydropower Projects, begins on page 24.

Appendix B, Salient Features of Hydropower Project, begins on page 27.

Explanation of Wording in This Guide is given on page 34.

The standard closes with an addition, Explanation of Provisions, beginning on page 35.

1 Scope

NB/T 10084-2018 is the Chinese guide for preparing the operation and dispatch procedures of hydropower projects. Every reservoir is operated to a written procedure that fixes, for each season and each water level, how water is released and for what purpose: that document is what turns a dam into a managed system, and it is what an operator relies on when a flood arrives at night. This guide sets out how the procedure is to be written. It covers the general provisions and defined terms, then the basic data and design parameters the procedure must rest on - hydrology, reservoir characteristics, discharge capacities and the approved design operating rules. It then works through each purpose of operation in turn: power generation dispatch including peak regulation, capacity and ramp rate; flood control operation with the flood season levels and the rules for pre-release and for passing the flood; navigation, irrigation and water supply; ice regime operation in winter; the ecological flow to be maintained downstream; sediment management and flushing; and the operation of a cascade where several plants share a river. The coordination between purposes when they conflict, the emergency procedures, the operation of the reservoir area, and the arrangements for revising the procedure complete the guide, with appendices setting out the format of the procedure document.

2 Parameters and Basic Data

2.1.1 The preparation of the parameters and indexes of the operation procedures shall state the elevation system adopted for the hydropower project.

2.1.2 The preparation of the parameters and indexes of the operation procedures shall state the project rank of the hydropower project, the grade of each structure and the corresponding flood design standards.

2.1.3 The preparation of the parameters and indexes of the operation procedures shall state the characteristic water levels and the reservoir storage capacities of the hydropower project. The characteristic water levels shall mainly include the normal pool level, dead water level, operation control water level, flood limit water level, flood control high water level, design flood level and check flood level; the reservoir storage capacities shall mainly include the total storage capacity, the storage capacity below the normal pool level, the regulating storage, the dead storage and the flood control storage. Where the operation control water level is controlled in tiers, the control water level of each tier and the control conditions shall be stated. For hydropower projects with staged flood limit water levels, each staged flood limit water level and its operation period shall be stated. For hydropower projects with different flood control high water levels, each flood control high water level and its flood protection object shall be stated.

2.1.4 The preparation of the parameters and indexes of the operation procedures shall state the storage coefficient and the regulating performance of the hydropower project.

2.1.5 The preparation of the parameters and indexes of the operation procedures shall state the upstream and downstream control stations or control sections for the operation of the hydropower project.

2.1.6 The preparation of the parameters and indexes of the operation procedures shall state the characteristics and parameters of the runoff and floods at the dam site of the hydropower project; the parameters mainly include the catchment area, the mean annual flow, the design flood and the check flood. The runoff and flood series should be extended as far as possible on the premise of ensuring accuracy.

2.1.7 The preparation of the parameters and indexes of the operation procedures shall state the parameters and indexes of power generation operation, mainly including the installed capacity, firm output, design mean annual energy output, type and number of units, characteristic heads, unit operating condition parameters, maximum diversion flow of the hydropower station, water utilization ratio and design dependability. The characteristic heads shall mainly include the rated head, maximum head and minimum head. The unit operating condition parameters shall mainly include the rated output, rated speed, suction height and rated flow.

2.1.8 The preparation of the parameters and indexes of the operation procedures shall state the parameters and indexes of flood control operation, mainly including the flood protection object, flood control standard, flood control section, safe discharge of the river channel, and the flood control storage reserved in the flood season together with the corresponding periods.

2.1.9 The preparation of the parameters and indexes of the operation procedures shall state the main parameters of the water release structures, mainly including the type and number of water release structures, the orifice elevation and dimensions, and the gate type and dimensions.

2.1.10 The preparation of the parameters and indexes of the operation procedures shall list the main project characteristics table, which shall comply with the requirements of Appendix B of this guide.

2.2.1 The preparation of the basic data of the operation procedures shall state the basic design data of the project, and the basic data shall be rechecked in light of the actual conditions of the project; the basic data adopted shall be valid and shall meet the requirements of operation. The basic data shall include the following contents:

1 Runoff results such as long-series or typical-year monthly, ten-day and daily runoff processes, flood results for different frequencies, and staged flood results.

2 Water level-area-storage capacity curves.

3 The tailwater level-discharge relation curve at the powerhouse site under natural conditions, and the tailwater level-discharge relation curve at the powerhouse site as affected by the sedimentation backwater of the downstream reservoir.

4 The suspended sediment series or representative-year sediment concentration, sediment discharge, sediment yield modulus, sediment grain size distribution, median grain size and bed load discharge under natural conditions, as well as the above sediment data after sediment trapping by upstream reservoirs.

5 Ice regime data such as the frozen river reaches, ice thickness, ice volume, and freeze-up and break-up times.

6 Reservoir backwater computation results.

7 The expected output of the turbine-generator units, the turbine operating characteristic curves and the generator efficiency.

Remaining clauses in the full document

  • 3 Hydrometeorological Forecast
  • 4 Power Generation and Scheduling
  • 5 Flood Regulation and Management
  • 6 Navigational Operation
  • 7 Irrigation and Water Supply
  • 8 Ice-Jam Prevention
  • 9 Ecological Flow Discharge Regulation
  • 10 Sediment Discharge Operation
  • 11 Hydraulic Structures Operation and Management
  • 12 Project Area Management
  • 13 Operation and Management Implementation

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 55 pages — is available in the English PDF.

How to Buy NB/T 10084-2018

  1. 1Add to cart. Click the "Buy NB/T 10084-2018" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
55 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

NB/T 10084-2018

$980.00

$835.00for partners