MT/T 1255-2025Technical Standards for Construction of Full-Face Rock Tunneling Machines in Mine Inclined Shafts (English PDF)
矿山斜井全断面岩石掘进机施工技术标准
This is a limited preview
Buy now to download the full PDF (47 pages)
Need quotation for your management?
Get a formal quotation for MT/T 1255-2025 in 30 minutes.
Issued by
National Energy Administration
Level / Type
National · Recommended
Issue date
June 30, 2025
Implementation date
December 30, 2025
Scope
MT/T 1255-2025 is the English-translated version of 矿山斜井全断面岩石掘进机施工技术标准.
MT/T 1255-2025 — Technical Standards for Construction of Full-Face Rock Tunneling Machines in Mine Inclined Shafts
Found what you need?
Document preview — MT/T 1255-2025
National Standard of the People's Republic of China
Issued by: National Energy Administration
Contents
- Document data1
Document data
Estimated length of the Chinese original: 70,735 words.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 47 pages — is available in the English PDF.
How to Download MT/T 1255-2025
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
MT/T 1030-2025 — Commercial coal quality - Coal for sinter ore
MT/T 105-2025 — General technical specification of face conveyor
MT/T 1095-2025 — Compound dry separator for coal
Secure payment via Stripe
Payments accepted
MT/T 1255-2025
$1,524.00