MT/T 1033-2007Connecting, adapter junction box for mine optical fiber cables (English PDF)
矿用光纤接、分线盒
This is a limited preview
Buy now to download the full PDF (7 pages)
Need quotation for your management?
Get a formal quotation for MT/T 1033-2007 in 30 minutes.
Issued by
National Development and Reform Commission of the People's Republic of China
Level / Type
National · Recommended
Issue date
March 30, 2007
Implementation date
July 1, 2007
Scope
MT/T 1033-2007 is the English-translated version of 矿用光纤接、分线盒.
MT/T 1033-2007 — This standard specifies the mine with fiber access, junction box technical requirements, test methods, inspection rules, signs, packaging, transport and storage conditions.
Found what you need?
Document preview — MT/T 1033-2007
National Standard of the People's Republic of China
- ICS
- 73.100.99
- Classification
- D 98
Issued by: National Development and Reform Commission of the People's Republic of China
Contents
- What this standard covers1
- Document data2
- Standards quoted by this document3
What this standard covers
This standard specifies the mine with fiber access, junction box technical requirements, test methods, inspection rules, signs, packaging, transport and storage conditions. This standard applies to coal with fiber access, junction box, such as the existence of the cable wiring, splitter cable should be connected to another junction box meets the technical conditions.
Document data
International classification (ICS): 73.100.99.
Chinese classification (CCS): D98.
Estimated length of the Chinese original: 11,134 words.
Standards quoted by this document
State Administration of Production Safety Supervision Bulletin No. 6; 2007
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 7 pages — is available in the English PDF.
How to Download MT/T 1033-2007
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
MT/T 1030-2025 — Commercial coal quality - Coal for sinter ore
MT/T 105-2025 — General technical specification of face conveyor
MT/T 1095-2025 — Compound dry separator for coal
Secure payment via Stripe
Payments accepted
MT/T 1033-2007
$344.00