LY/T 2411-2015Technical regulation on Three-north shelt-belt assessment (English PDF)
三北防护林工程评估技术规程
This is a limited preview
Buy now to download the full PDF (26 pages)
Need quotation for your management?
Get a formal quotation for LY/T 2411-2015 in 30 minutes.
Issued by
State Forestry Administration
Level / Type
National · Recommended
Issue date
January 27, 2015
Implementation date
May 1, 2015
Scope
LY/T 2411-2015 is the English-translated version of 三北防护林工程评估技术规程.
LY/T 2411-2015 — This standard specifies the Three North Shelterbelt project national, regional, provincial, prefectural and county five different stages, different ways of assessment content, procedures, parties Law and other content.
This standard applies to the Three North Shelterbelt project construction, national, regional, provincial, prefectural and county construction performance evaluation.
Found what you need?
Document preview — LY/T 2411-2015
National Standard of the People's Republic of China
- ICS
- 65.020.40
- Classification
- B 65
Issued by: State Forestry Administration
Contents
- Preface
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 Types of assessment
- 4.1 By the project construction period
- 4.2 According to the project assessment agency
- 5 Assessment process and methods
- 5.1 Process
- 5.2 Evaluation Methods
- 6 Assessment content
- 6.1 Engineering Decision Assessment
- 6.2 Engineering Process Assessment
- 6.3 Project Objectives Assessment
- 6.4 Engineering Sustainability Assessment
- 7 Data Acquisition and Analysis
- 7.1 Project performance information collection
- 7.2 Engineering Social Information Collection
- 7.3 Analysis and Evaluation Indicators
- 7.4 Analysis and Evaluation Indicator Weight
- 8 Assessment Results and Reports
- 8.1 Assessment Results
- 8.2 Evaluation Report
- Appendix A (informative) Three North Shelterbelt Project Assessment Basic Statistics List
- Appendix B (informative) Three North Shelterbelt afforestation performance statistics table
- Appendix C (informative) Three North Shelterbelt project investment list
- Appendix D (informative) Three North Shelterblue Program comprehensive assessment factor analysis list
- Appendix E (Informative) Three North Shelterbelt Project Assessment Report Structure
- References
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard is proposed by the State Forestry Administration Northwest North China Northeast Protection Forest Construction Bureau.
This standard by the National Forest Technology Standardization Technical Committee (SAC/TC385) centralized.
This standard was drafted. State Forestry Administration Northwest North China Northeast Shelterbelt Bureau.
1 Scope
This standard specifies the Three North Shelterbelt project national, regional, provincial, prefectural and county five different stages, different ways of assessment content, procedures, parties Law and other content.
This standard applies to the Three North Shelterbelt project construction, national, regional, provincial, prefectural and county construction performance evaluation.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all amendments) applies to this document.
Technical code of afforestation Technical Specification for Investigation and Design of Forest Resources Planning
3 Terms and definitions
The following terms and definitions apply to this document.
Mid-term assessment According to the requirements of the construction planning of the Three-North Shelterbelt System (stage and period), it will take half of the time in the project (stage and period) when the assessment.
Final assessment of terminalassessment Three North Shelterbelt System Construction Project (stage, stage) all the planning activities carried out when the assessment activities.
Selfassessment Forestry administrative departments at all levels of the Three-North Shelterbelt project control the project planning and evaluate the performance of the project construction organization activity.
After assessing finalassessment Three-North Shelterbelt Construction Projects at all levels The forestry administrative department hires non-participating pre-consultation and decision-making assessment agencies to evaluate self-Assessment of the situation, sub-project mid-term assessment and final assessment.
Three North Three-north Northwest China, northern North China and Northeast China.
Three North Shelterbelt System Construction Project Large-scale man-made forestry ecological projects in northern North China's Three North regions (Northwest, North North China and Northeast China) to mitigate the accelerating Desertification and soil erosion processes. Three phases of eight projects, which lasted 73 years (1978-2050).
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 26 pages — is available in the English PDF.
How to Download LY/T 2411-2015
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
LY/T 1186-2026 — Technical Specifications for Desertification Prevention and Control
LY/T 1268-2026 — Determination of chemical indicators of forest plants and litter
LY/T 1285-2026 — Sawn timber for transportation vehicles
Secure payment via Stripe
Payments accepted
LY/T 2411-2015
$415.00