Valid

LY/T 1723-2008Operational regulation of harvesting of farmland shelterbelt forest (English PDF)

农田防护林采伐作业规程

Preview PDF

This is a limited preview

Buy now to download the full PDF (9 pages)

Need quotation for your management?

Get a formal quotation for LY/T 1723-2008 in 30 minutes.

Issued by

State Forestry Administration

Level / Type

National · Recommended

Issue date

March 31, 2008

Implementation date

May 1, 2008

Scope

LY/T 1723-2008 is the English-translated version of 农田防护林采伐作业规程.

LY/T 1723-2008 — This standard specifies the type of farmland shelter logging, operating requirements and cutting operations supervision and inspection and other technical requirements.

This standard applies to the nationwide farmland shelterbelt logging, updating operations and management. Plain drainage, road shelter forest can refer to carried out.

Found what you need?

Document preview — LY/T 1723-2008

National Standard of the People's Republic of China

ICS
65.020.40
Classification
B 64

Issued by: State Forestry Administration

Contents

  • What this standard covers1
  • Document data2
  • Standards quoted by this document3

What this standard covers

This standard specifies the farmland shelterbelts logging type, operating requirements, and cutting operations supervision and inspection and other technical requirements. This standard applies to harvesting for farmland nationwide, update operations and management. Plains drainage, roads shelterbelts may refer to.

Document data

International classification (ICS): 65.020.40.

Chinese classification (CCS): B64.

Estimated length of the Chinese original: 14,171 words.

Standards quoted by this document

GB/T 18337.3; LY/T 1646-2005

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 9 pages — is available in the English PDF.

Referenced standards

How to Download LY/T 1723-2008

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
9 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

LY/T 1723-2008

$354.00