LD/T 99.8-1997Work quota for municipal engineering construction Water supply and drainage engineering (English PDF)
市政工程劳动定额 给水排水工程
LD/T 99.8 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| LD/T 99.8-2008 | Construction of municipal engineering work quota - pipe network project | Valid |
| LD/T 99.8-1997 | Work quota for municipal engineering construction Water supply and drainage engineering | Obsolete |
LD/T 99.8-1997 is obsolete. It has been replaced by LD/T 99.8-2008. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for LD/T 99.8-1997 in 30 minutes.
Level / Type
National · Recommended
Issue date
April 23, 1997
Implementation date
July 1, 1997
Scope
LD/T 99.8-1997 is the English-translated version of 市政工程劳动定额 给水排水工程.
LD/T 99.8-1997 is the Chinese industry standard "Work quota for municipal engineering construction Water supply and drainage engineering". It was issued on April 23, 1997, and took effect on July 1, 1997. It is obsolete: it has been replaced by LD/T 99.8-2008.
Found what you need?
Document preview — LD/T 99.8-1997
Contents
- Document data
1 Document data
Sector: National Recommended (industry standard).
Date of issue: 1997-04-23.
Date of implementation: 1997-07-01.
Status: obsolete, replaced by LD/T 99.8-2008.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
How to Download LD/T 99.8-1997
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
LD/T 99.12-2008 — Construction of municipal engineering work quota - Tunnel Project
LD/T 99.7-1997 — Work quota for municipal engineering construction Dike building
LD/T 99.12-1997 — Work quota for municipal engineering construction Tunnel engineering
Secure payment via Stripe
Payments accepted
LD/T 99.8-1997
$2,237.00