LD/T 71.7-2009Rail transportation equipment manufacturing labor quota welding - Part 1: Common steel welding, Part 2: Stainless steel welding, Part 3: Aluminum welding, Part 4: welding robot machining (English PDF)
轨道交通装备制造业 焊接加工劳动定额 第1部分:普通碳钢焊接加工、第2部分:不锈钢焊接加工、第3部分:铝合金焊接加工、第4部分:焊接机械手加工
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for LD/T 71.7-2009 in 30 minutes.
Issued by
Ministry of Human Resources and Social Security of the People's Republic of China
Level / Type
National · Recommended
Issue date
September 7, 2009
Implementation date
October 1, 2009
Scope
LD/T 71.7-2009 is the English-translated version of 轨道交通装备制造业 焊接加工劳动定额 第1部分:普通碳钢焊接加工、第2部分:不锈钢焊接加工、第3部分:铝合金焊接加工、第4部分:焊接机械手加工.
LD/T 71.7-2009 is the Chinese industry standard "Rail transportation equipment manufacturing labor quota welding - Part 1: Common steel welding, Part 2: Stainless steel welding, Part 3: Aluminum welding, Part 4: welding robot machining".
It was issued on September 7, 2009 by the Ministry of Human Resources and Social Security of the People's Republic of China, and took effect on October 1, 2009. It is in force.
Found what you need?
Document preview — LD/T 71.7-2009
National Standard of the People's Republic of China
Issued by: Ministry of Human Resources and Social Security of the People's Republic of China
Contents
- Document data
1 Document data
Sector: Labour (industry standard).
Issuing body: Ministry of Human Resources and Social Security of the People's Republic of China.
Date of issue: 2009-09-07.
Date of implementation: 2009-10-01.
Status: valid.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
How to Download LD/T 71.7-2009
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
LD/T 71.8-2019 — Labor quota for rail transit equipment manufacturing
LD/T 71.6-2009 — Rail transportation equipment manufacturing grinding machine labor quota
LD/T 71.8-2000 — Formulation of work quota of riveting for railway industry
LD/T 71.7-2009
$510.00