LD/T 71.24-2000Formulation of work quota of gear machining for railway industry. Part 3: Formulation of work quota of gear hobbing (English PDF)
铁路工业制齿工劳动定额制定 第三部分:滚齿劳动定额制定
LD/T 71.24 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| LD/T 71.24-2019 | Rail transit equipment manufacturing labor quota Special gear hobbing processing | Valid |
| LD/T 71.24-2000 | Formulation of work quota of gear machining for railway industry. Part 3: Formulation of work quota of gear hobbing | Obsolete |
LD/T 71.24-2000 is obsolete. It has been replaced by LD/T 71.24-2019. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for LD/T 71.24-2000 in 30 minutes.
Level / Type
National · Recommended
Issue date
July 14, 2000
Implementation date
January 1, 2001
Scope
LD/T 71.24-2000 is the English-translated version of 铁路工业制齿工劳动定额制定 第三部分:滚齿劳动定额制定.
LD/T 71.24-2000 is the Chinese industry standard "Formulation of work quota of gear machining for railway industry. Part 3: Formulation of work quota of gear hobbing".
It was issued on July 14, 2000, and took effect on January 1, 2001. It is obsolete: it has been replaced by LD/T 71.24-2019.
Found what you need?
Document preview — LD/T 71.24-2000
Contents
- Document data
1 Document data
Sector: National Recommended (industry standard).
Date of issue: 2000-07-14.
Date of implementation: 2001-01-01.
Status: obsolete, replaced by LD/T 71.24-2019.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
How to Download LD/T 71.24-2000
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
LD/T 71.25-2019 — Rail transit equipment manufacturing labor quota Special gear grinding
LD/T 71.23-2000 — Formulation of work quota of gear machining for railway industry. Part 2: Formulation of work quota of gear shaping
LD/T 71.25-2000 — Formulation of work quota of gear machining for railway industry. Part 4: Formulation of work quota of gear grinding
Secure payment via Stripe
Payments accepted
LD/T 71.24-2000
$210.00