Withdrawn

JT/T 572-2015Water transport engineering.Groundwater stage gauge (English PDF)

水运工程 地下水位计

Preview PDF

JT/T 572 | Evolution and historical versions

Std IDTitleStatus
JT/T 572-2015Water transport engineering.Groundwater stage gaugeObsolete

JT/T 572-2015 is obsolete. This page sells the obsolete edition, for projects and contracts that still cite it.

This is a limited preview

Buy now to download the full PDF

Need quotation for your management?

Get a formal quotation for JT/T 572-2015 in 30 minutes.

Issued by

Ministry of Transport of the People's Republic of China

Level / Type

National · Recommended

Issue date

April 24, 2015

Implementation date

July 31, 2015

Scope

JT/T 572-2015 is the English-translated version of 水运工程 地下水位计.

JT/T 572-2015 is the Chinese industry standard "Water transport engineering.Groundwater stage gauge". It was issued on April 24, 2015 by the Ministry of Transport of the People's Republic of China, and took effect on July 31, 2015. It is obsolete: it has been withdrawn.

Found what you need?

Document preview — JT/T 572-2015

National Standard of the People's Republic of China

Issued by: Ministry of Transport of the People's Republic of China

Contents

  • Document data
1 Document data

Sector: Highway & Transport (industry standard).

Issuing body: Ministry of Transport of the People's Republic of China.

Date of issue: 2015-04-24.

Date of implementation: 2015-07-31.

Status: obsolete, withdrawn.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

How to Download JT/T 572-2015

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

JT/T 572-2015

$210.00