Valid

JT/T 164.5-2026Technical requirement of repairing for specific equipment of cutter suction dredger - Part 5: Spud keeper (English PDF)

绞吸挖泥船专用设备修理技术要求

Preview PDF

This is a limited preview

Buy now to download the full PDF

Need quotation for your management?

Get a formal quotation for JT/T 164.5-2026 in 30 minutes.

Issued by

Ministry of Transport

Level / Type

National · Recommended

Issue date

January 12, 2026

Implementation date

May 1, 2026

Scope

JT/T 164.5-2026 is the English-translated version of 绞吸挖泥船专用设备修理技术要求.

JT/T 164.5-2026 — This standard specifies the structure, inspection, repair, testing, and delivery documentation requirements for steel pile clamps on cutter suction dredgers.

This standard applies to the repair of steel pile clamps on cutter suction dredgers.

Found what you need?

Document preview — JT/T 164.5-2026

National Standard of the People's Republic of China

Replacing
JT/T 164.5-2002

Issued by: Ministry of Transport

Contents

  • What this standard covers1
  • Document data2

What this standard covers

This standard specifies the structure, inspection, repair, testing, and delivery documentation requirements for steel pile clamps on cutter suction dredgers. This standard applies to the repair of steel pile clamps on cutter suction dredgers.

Document data

Supersedes the earlier edition JT/T 164.5-2002.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

How to Download JT/T 164.5-2026

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

JT/T 164.5-2026

$105.00