Valid

JJG 985-2004Verification Regulation of Reference Standard Facility of High Temperature Platinum Resistance Thermometers (English PDF)

Preview PDF

This is a limited preview

Buy now to download the full PDF (25 pages)

Need quotation for your management?

Get a formal quotation for JJG 985-2004 in 30 minutes.

Issued by

The General Administration of Quality Supervision, Inspection and Quarantine issued, This regulation was approved by the General Administration of Quality Supervision, Inspection and Quarantine on March 2,.2004, and

Level / Type

National · Mandatory

Issue date

March 2, 2004

Implementation date

June 2, 2004

Scope

JJG 985-2004 (Verification Regulation of Reference Standard Facility of High Temperature Platinum Resistance Thermometers) is available as an English-translated PDF.

JJG 985-2004 — This standard applies to working reference temperature platinum resistance thermometers and platinum resistance thermometer temperature reference means working at 0°C ~ 961. 78 �� range of initial verification and follow-up examination.

Found what you need?

Document preview — JJG 985-2004

National Standard of the People's Republic of China

ICS
17.220.20
Classification
A 54

Issued by: The General Administration of Quality Supervision, Inspection and Quarantine issued, This regulation was approved by the General Administration of Quality Supervision, Inspection and Quarantine on March 2,.2004, and

Contents

  • 1 Scope (1)
  • 2 Overview (1)
  • 2.1 Definition of temperature value and interpolation method (1)
  • 2.2 Symbol Description (2)
  • 3 Metrological performance requirements (2)
  • 3.1 Working reference high temperature platinum resistance thermometer (2)
  • 3.2 Define fixed points in the working reference device (3)
  • 4 General technical requirements (4)
  • 4.1 Appearance Dimensions (4)
  • 4.2 Structure (5)
  • 5 Measuring instrument control (5)
  • 5.1 Verification conditions (5)
  • 5.2 Verification items and verification methods (5)
  • 5.3 Processing of verification results (10)
  • 5.4 Verification cycle (11)
  • Appendix A (0~961.78) °C temperature zone reference function table (12)
  • Appendix B Coefficient Value Table of Reference Function Wr(t) (30)
  • Appendix C Certification Certificate (Back) Format (31)
  • Appendix D Verification Result Notice (Back) Format (32)

1 Scope (1)

2 Overview (1)

2.1 Definition of temperature value and interpolation method (1)

2.2 Symbol Description (2)

3 Metrological performance requirements (2)

3.1 Working reference high temperature platinum resistance thermometer (2)

3.2 Define fixed points in the working reference device (3)

4 General technical requirements (4)

4.1 Appearance Dimensions (4)

4.2 Structure (5)

5 Measuring instrument control (5)

5.1 Verification conditions (5)

5.2 Verification items and verification methods (5)

5.3 Processing of verification results (10)

5.4 Verification cycle (11)

Appendix A (0~961.78) °C temperature zone reference function table (12)

Appendix B Coefficient Value Table of Reference Function Wr(t) (30)

Appendix C Certification Certificate (Back) Format (31)

Appendix D Verification Result Notice (Back) Format (32)

High-temperature platinum resistance thermometer working reference device verification procedure

1 Scope

This procedure applies to the working reference high temperature platinum resistance thermometer and high temperature platinum resistance thermometer working reference device First verification and subsequent verification in the range of 0 °C ~ 961.78 °C.

2 Overview

The high-temperature platinum resistance thermometer measures the temperature according to the characteristic that the resistance of the metal platinum wire changes with temperature.

Kind of instrument.

High-temperature platinum resistance thermometer working reference device should include working reference high-temperature platinum resistance thermometer and definition fixed point Set. Define fixed point devices including silver freezing point, aluminum freezing point, zinc freezing point, tin freezing point, and water triple point loading Set.

The high-temperature platinum resistance thermometer working reference device is used to verify the first-class standard high-temperature platinum resistance thermometer.

2.1 Definition of temperature value and interpolation method in 1990, the International Temperature Scale (ITS-90) specified temperature values in the temperature range from 0 °C to 961.78 °C as specified in a group.

High-temperature platinum resistance thermometers that define fixed-point graduations, defined fixed points including silver freezing point, aluminum freezing point, zinc condensation Fixation point, tin freezing point and water triple point, and define the fixed point using the specified reference function and deviation function interpolation calculation the temperature value between.

The temperature value is determined by the following formula.

W(t)=R(t)/R(0.01°C) (1) where W(t)---high-temperature platinum resistance thermometer is at the temperature t and the water triple point temperature (0.01 °C) the ratio of resistance values.

The reference function of the 0°C~961.78°C temperature zone is defined as Wr(t)=C0 sum i=1 Ci[(t-481)/481]i (2) the inverse of equation (2) is given by the following equation, which is consistent with equation (2) within 0.13 mK.

t=D0 sum

Di[(Wr(t)-2.64)/1.64]i (3) where t---temperature value, °C;

Wr(t)---reference function, see the numerical value of the reference function Wr(t) in the temperature range from 0 °C to 961.78 °C.

Appendix A;

C0, D0, Ci, Di---constants are listed in Appendix B.

The deviation function of the temperature range from 0 °C to 961.78 °C is deltaW(t)=W(t)-Wr(t)=a6[W(t)-1] b6[W(t)-1]2 C6[W(t)-1]3 d[W(t)-W(660.323°C)]2 (4) in the formula a6, b6, c6, d---coefficient. Below the freezing point of aluminum, d=0; the coefficients a6, b6, c6 are

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 25 pages — is available in the English PDF.

How to Download JJG 985-2004

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
25 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

JJG 985-2004

$465.00