Valid

JJG 229-2010Industry Platinum and Copper Resistance Thermometers (English PDF)

Preview PDF

This is a limited preview

Buy now to download the full PDF (31 pages)

Need quotation for your management?

Get a formal quotation for JJG 229-2010 in 30 minutes.

Issued by

General Administration of Quality Supervision, Inspection and Quarantine This Regulation was approved by the G

Level / Type

National · Mandatory

Issue date

September 6, 2010

Implementation date

March 6, 2011

Scope

JJG 229-2010 (Industry Platinum and Copper Resistance Thermometers) is available as an English-translated PDF.

JJG 229-2010 is the Chinese standard "Industry Platinum and Copper Resistance Thermometers".

Its scope clause reads: This Regulation is applicable to the initial verification, subsequent verification and in- use inspection of industry platinum thermal resistance in the whole or part temperature range of -200°C~+850°C and with the nominal value alpha of temperature coefficient of 3.851×10-3°C-1; as well as the industry copper thermal resistance (hereinafter referred to as thermal resistance) in the whole or part temperature range of -200°C~+850°C and with the nominal value alpha of temperature coefficient of 4.280×10-3°C-1.

Its clauses include references; terms and definitions; overview; requirement for metrology performance; general technical requirements; control of metrologic instrument.

It was issued by the General Administration of Quality Supervision, Inspection and Quarantine This Regulation was approved by the G on 2010-09-06 and took effect on 2011-03-06.

Found what you need?

Document preview — JJG 229-2010

National Standard of the People's Republic of China

Issued by: General Administration of Quality Supervision, Inspection and Quarantine This Regulation was approved by the G

Contents

  • 1 Scope...5
  • 2 References...5
  • 3 Terms and Definitions...5
  • 4 Overview...6
  • 4.1 Composition...6
  • 4.2 Temperature characteristics...6
  • 5 Requirement for Metrology Performance...8
  • 5.1 Tolerance...8
  • 5.2 Stability...8
  • 6 General Technical Requirements...9
  • 6.1 Appearance...9
  • 6.2 Insulation resistance...9
  • 7 Control of Metrologic Instrument...10
  • 7.1 Verification conditions...10
  • 7.2 Verification items...12
  • 7.3 Verification method...13
  • 7.4 Processing of verification results...21
  • 7.5 Verification period...22
  • Appendix A Allowable Range of deltaalpha...23
  • Appendix B Temperature/Resistance Relationship Table...26
  • Appendix C Verification Record Format...31

1 Scope

This Regulation is applicable to the initial verification, subsequent verification and in- use inspection of industry platinum thermal resistance in the whole or part temperature range of -200°C~+850°C and with the nominal value alpha of temperature coefficient of

3.851×10-3°C-1; as well as the industry copper thermal resistance (hereinafter referred to as thermal resistance) in the whole or part temperature range of -200°C~+850°C and with the nominal value alpha of temperature coefficient of 4.280×10-3°C-1.

2 References

The following references are cited in this Regulation.

IEC 60751 (2008) Industrial Platinum Resistance Thermometers and Platinum

Temperature Sensors

JB/T 8623-1997 Technical Specification and Reference Table for Industrial Copper

Thermal Resistance

When citing, pay attention to using the currently valid version of the above cited references.

3 Terms and Definitions

3.1 Resistance thermometer

A temperature measuring instrument composed of one or more temperature-sensing resistance elements with lead wires, protective tubes and wiring terminals.

3.2 Nominal resistance R0

The expected resistance value of the thermal resistance (or temperature sensing element) at 0°C. The resistance values are usually. 10ohm, 50ohm, 100ohm, 500ohm, 1000ohm, which are declared by the manufacturer and marked on the thermal resistance.

Temperature sensing element is often characterized by its nominal resistance value.

For example, a Pt100 temperature sensing element has a nominal resistance value of

100ohm; Cu50 temperature sensing element has a nominal resistance value of 50ohm.

3.4 Relative resistance WS t

The ratio of the resistance value Rt of the standard platinum resistance thermometer at temperature t to the resistance value Rtp at the triple point of water.

3.5 Temperature coefficient of resistance

4 Overview

4.1 Composition

Industry platinum and copper thermal resistances are composed of one or more platinum and copper thermal resistance temperature sensing elements installed in a protective sleeve, including internal connecting wires and external terminals used to connect electrical measuring instruments (excluding measurement and display devices). It can contain device and junction boxes for installation and fixing, but does not contain a detachable protective tube or installation sleeve.

4.2 Temperature characteristics

5 Requirement for Metrology Performance

5.1 Tolerance

The tolerance level corresponds to the effective temperature range. Within the effective temperature range, the maximum deviation between the temperature t calculated by the division table and the real temperature of the resistance value of the thermal resistance shall not exceed the tolerance value given in Table 1.T

5.2 Stability

After the platinum thermal resistance has worked at the maximum working temperature for 672h, the change in its R0 value shall not be greater than the absolute value of the

0°C tolerance specified in Table 1 after being converted into temperature.

6 General Technical Requirements

6.1 Appearance

6.1.1 All parts of the thermal resistance shall be assembled correctly, reliably, and without missing parts; the outer coating shall be firm; the protective tube shall be intact;

and there shall be no dents, scratches and significant corrosion;

6.1.2 The temperature sensing element must not be broken, and there must be no obvious bending;

6.2 Insulation resistance

The insulation resistance between the temperature sensing element and the housing, and each temperature sensing element shall meet the following requirements.

7 Control of Metrologic Instrument

The control of Metrologic instrument includes initial verification, subsequent verification and in-use inspection.

7.1 Verification conditions

7.2 Verification items

The verification items for the initial verification, subsequent verification and in-use inspection are shown in Table 4.

7.3 Verification method

7.3.1 Visual inspection

According to the requirements of 6.1.1 ~ 6.1.4, check the outside of the protective sleeve for the thermal resistance and the temperature sensing element; and there shall be no visible damage to the naked eye. At the same time, according to the requirements of 6.1.4, check the markings and verification mark, etc. to determine whether the thermal resistance meets the management requirements.

7.3.4.3 Verification of R0

Measure the resistance value of the thermal resistance in a freezing point tank (or a thermostat tank with 0°C, the deviation does not exceed ±0.2°C), and compare it with the temperature of the freezing point tank measured by a standard measuring device, and calculate the deviation deltat0 at 0°C.

7.4 Processing of verification results

According to the requirements of this Regulation, the qualified thermal resistance shall be issued with a certificate of qualification of the corresponding level; if the verification is unqualified, the notice on verification results shall be issued, indicating the unqualified items.

7.5 Verification period

The verification period of thermal resistance can be determined according to the conditions of use, frequency and importance, and the longest period shall not exceed

1 year.

......

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 31 pages — is available in the English PDF.

Referenced standards

How to Download JJG 229-2010

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
31 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

JJG 229-2010

$475.00