Valid

JGJ 202-2010Technical code for safety of implementation scaffold practice in construction (English PDF)

Preview PDF

This is a limited preview

Buy now to download the full PDF (75 pages)

Need quotation for your management?

Get a formal quotation for JGJ 202-2010 in 30 minutes.

Issued by

Ministry of Housing and Urban-Rural Development of the People's Republic of China

Level / Type

National · Mandatory

Issue date

March 31, 2010

Implementation date

September 1, 2010

Scope

JGJ 202-2010 (Technical code for safety of implementation scaffold practice in construction) is available as an English-translated PDF.

JGJ 202-2010 — Technical code for safety of implementation scaffold practice in construction

Found what you need?

Document preview — JGJ 202-2010

National Standard of the People's Republic of China

Classification
P 09

Issued by: Ministry of Housing and Urban-Rural Development of the People's Republic of China

Contents

  • What this standard covers1
  • Document data2
  • Standards quoted by this document3

What this standard covers

This standard applies to the tools used in building construction scaffolding, including the attachment lift scaffolding, high job basket, plug-protective frame design, production, installation, removal, use, and security management.

Document data

Chinese classification (CCS): P09.

Estimated length of the Chinese original: 113,176 words.

Standards quoted by this document

GB 3095; GB 9078; GB 12348; GB/T 13338; ??GB/T 17195; GB 50257

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 75 pages — is available in the English PDF.

How to Download JGJ 202-2010

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
75 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

JGJ 202-2010

$800.00