JG/T 284-2010Glass fiber sheet for strengthening and restoring structures (English PDF)
结构加固修复用玻璃纤维布
JG/T 284 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| JG/T 284-2019 | Glass fiber sheet for strengthening and restoring structures | Valid |
| JG/T 284-2010 | Glass fiber sheet for strengthening and restoring structures | Obsolete |
JG/T 284-2010 is obsolete. It has been replaced by JG/T 284-2019. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for JG/T 284-2010 in 30 minutes.
Issued by
Ministry of Housing and Urban-Rural Development of the People's Republic of China
Level / Type
National · Recommended
Issue date
July 29, 2010
Implementation date
January 1, 2011
Scope
JG/T 284-2010 is the English-translated version of 结构加固修复用玻璃纤维布.
JG/T 284-2010 is the Chinese industry standard "Glass fiber sheet for strengthening and restoring structures". It was issued on July 29, 2010 by the Ministry of Housing and Urban-Rural Development of the People's Republic of China, and took effect on January 1, 2011. It is obsolete: it has been replaced by JG/T 284-2019.
Found what you need?
Document preview — JG/T 284-2010
National Standard of the People's Republic of China
Issued by: Ministry of Housing and Urban-Rural Development of the People's Republic of China
Contents
- Document data
1 Document data
Sector: National Recommended (industry standard).
Issuing body: Ministry of Housing and Urban-Rural Development of the People's Republic of China.
Date of issue: 2010-07-29.
Date of implementation: 2011-01-01.
Status: obsolete, replaced by JG/T 284-2019.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
How to Download JG/T 284-2010
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
JG/T 216-2024 — Small unit building curtain wall components
JG/T 236-2022 — Electric heating radiator for space heating
JG/T 302-2022 — Roller shutters
Secure payment via Stripe
Payments accepted
JG/T 284-2010
$125.00