HJ 75-2017Specifications for continuous emissions monitoring of SO2, NOX, and particulate matter in the flue gas emitted from stationary sources (English PDF)
Also coversHJ75-2017
This is a limited preview
Buy now to download the full PDF (7 pages)
Need quotation for your management?
Get a formal quotation for HJ 75-2017 in 30 minutes.
Issued by
Ministry of Environmental Protection
Level / Type
National · Mandatory
Issue date
December 29, 2017
Implementation date
March 1, 2018
Scope
HJ 75-2017 (Specifications for continuous emissions monitoring of SO2, NOX, and particulate matter in the flue gas emitted from stationary sources) is available as an English-translated PDF.
HJ 75-2017 is the Chinese standard "Specifications for continuous emissions monitoring of SO2, NOX, and particulate matter in the flue gas emitted from stationary sources".
Its scope clause reads: This standard specifies the composition and functions, technical performance, monitoring station, installation, technical index commissioning and testing, technical acceptance, daily operation management, daily operation quality assurance, data review and processing requirements of the continuous monitoring system for flue gas emissions from stationary pollution sources, including gaseous pollutants (SO2, NOX), particulate matter emissions, as well as related flue gas parameters (oxygen content, etc.).
This standard applies to the continuous monitoring system for flue gas (SO2, NOX, particulate matter) emissions from stationary pollution sources such as thermal power plant boilers, industrial/civilian boilers, industrial furnaces that use solid or liquid as fuel or raw materials.
The continuous monitoring system for flue gas (SO2, NOX, particulate matter) emissions from domestic waste incinerators, hazardous waste incinerators, stationary pollution sources, that use gas as fuel or raw materials, can refer to this standard for implementation.
Before the corresponding standards for continuous monitoring systems for flue gas pollutant emissions are officially promulgated and implemented, they can refer to this standard for implementation.
Its clauses include terms and definitions. It was issued by the Ministry of Environmental Protection on 2017-12-29 and took effect on 2018-03-01.
Found what you need?
Document preview — HJ 75-2017
National Standard of the People's Republic of China
Issued by: Ministry of Environmental Protection
Contents
- Foreword...4
- 1 Scope...6
- 2 Normative references...6
- 3 Terms and definitions...7
1 Scope
This standard specifies the composition and functions, technical performance, monitoring station, installation, technical index commissioning and testing, technical acceptance, daily operation management, daily operation quality assurance, data review and processing requirements of the continuous monitoring system for flue gas emissions from stationary pollution sources, including gaseous pollutants (SO2, NOX), particulate matter emissions, as well as related flue gas parameters (oxygen content, etc.).
This standard applies to the continuous monitoring system for flue gas (SO2, NOX, particulate matter) emissions from stationary pollution sources such as thermal power plant boilers, industrial/civilian boilers, industrial furnaces that use solid or liquid as fuel or raw materials.
The continuous monitoring system for flue gas (SO2, NOX, particulate matter) emissions from domestic waste incinerators, hazardous waste incinerators, stationary pollution sources, that use gas as fuel or raw materials, can refer to this standard for implementation.
Before the corresponding standards for continuous monitoring systems for flue gas pollutant emissions are officially promulgated and implemented, they can refer to this standard for implementation.
2 Normative references
The content of this standard refers to the following documents or clauses therein. For any undated referenced documents, the latest version shall apply to this standard.
GB 4208 Degrees of protection provided by enclosure (IP code)
GB 50057 Code for design protection of structures against lightning
GB 50093 Code for construction and quality acceptance of automation instrumentation engineering
GB 50168 Standard for construction and acceptance of cable line electric equipment installation engineering
GB/T 16157 The determination of particulates and sampling methods of gaseous pollutants emitted from exhaust gas of stationary source
3 Terms and definitions
3.1
Continuous emission monitoring, CEM
Continuous and real-time automatic monitoring of the emission concentration and emission of particulate matter and (or) gaseous pollutants, as emitted by stationary pollution sources, referred to as CEM.
3.5
Valid data
The data measured by the normal operation of CEMS under the condition of flue gas emission from stationary pollution sources, which meets the technical indicators of this standard and has passed the acceptance.
3.6
Valid hourly average
The arithmetic mean of valid data of not less than 45 minutes within 1 whole hour.
3.7
Reference method
A standard method published by a country or industry for comparison with CEMS measurement results.
3.8
Checkout/verification
The process of comparing the relative accuracy, correlation coefficient, confidence interval, allowable interval, relative error, absolute error, etc. of the test results of
CEMS (including sampling system and analysis system) using a reference method.
3.9
Performance testing
The calibration and verification of CEMS before technical acceptance after the installation, initial adjustment, normal continuous operation of CEMS for at least
168 hours.
3.10
Comparison testing
The accuracy of a normally operating CEMS is randomly checked using a reference method.
4 Composition and functional requirements of the continuous monitoring system of flue gas emissions from stationary pollution sources
CEMS consists of a particulate matter monitoring unit and (or) a gaseous pollutant monitoring unit, a flue gas parameter monitoring unit, a data acquisition and processing unit.
5 Technical performance requirements for continuous monitoring system of flue gas emissions from stationary pollution sources
Meet the relevant requirements of HJ 76.
6 Requirements for monitoring station of continuous monitoring system of flue gas emissions from stationary pollution sources
6.1 An independent station shall be provided for outdoor CEMS; the distance between the monitoring station and the sampling point shall be as close as possible, in principle not exceeding 70 m.
6.3 Air conditioning and heating equipment shall be installed in the monitoring station room; the indoor temperature shall be maintained at (15 ~ 30) °C; the relative humidity shall be <= 60%; the air conditioner shall have the function of automatic restart when a call is received; exhaust fans or other ventilation facilities shall be installed in the station room.
6.4 The power distribution power in the monitoring station room can meet the actual requirements of the instrument; the power is not less than 8 kW; at least 5 three-hole sockets, 1 voltage-stabilizing power supply, 1 UPS power supply are reserved.
6.5 The monitoring station room shall be equipped with certified standard gases of different concentrations;
6.6 The monitoring station room shall have necessary waterproof, moisture-proof, heat- insulating and thermal insulation measures; it shall also have explosion-proof functions in specific occasions.
6.7 The monitoring station room shall have communication conditions that can meet the data transmission requirements of CEMS.
7 Installation requirements for the continuous monitoring system for flue gas emissions from stationary pollution sources
7.1 Installation location requirements
7.1.1 General requirements
7.1.1.1 Located downstream of the emission control equipment for stationary pollution
sources and upstream of the comparison monitoring section;
7.1.1.5 The installation location shall not leak air;
7.1.1.6 A waterproof low-voltage distribution box shall be set up in the working area where CEMS is installed, with a leakage protector and no less than two 10 A sockets to ensure the power required by the monitoring equipment;
7.1.1.7 The sampling platform and sampling holes shall be arranged reasonably;
7.1.2 Specific requirements
7.1.2.1 The vertical pipe section and the negative pressure area of the flue shall be preferred to ensure the representativeness of the collected samples.
7.1.2.3 For newly built emission sources, the sampling platform shall be designed and constructed simultaneously with the exhaust device, to ensure that the sampling section meets the requirements of 7.1.2.2 of this standard. For existing emission sources, when it is impossible to find a sampling position that meets 7.1.2.2, the CEMS sampling or
7.2.4 The design drawings shall comply with the provisions of technical drawings, mechanical drawings, electrical drawings, building structure drawings and other standards.
7.2.5 The cleaning, inspection, maintenance of the equipment before installation shall meet the following requirements.
8 Technical indicator performance testing of the continuous monitoring system for flue gas emissions from stationary pollution sources
After the CEMS is installed and operated on site, before acceptance, the technical performance indicators shall be debugged and tested. The technical indicators of performance testing include.
9 Technical acceptance of continuous monitoring system for flue gas emissions from stationary pollution sources
9.1 General requirements
After the installation, performance testing of CEMS are completed and the network is connected to the competent department, technical acceptance shall be carried out, including CEMS technical indicator acceptance and network acceptance.
9.2 Technical acceptance conditions
After the installation, performance testing of CEMS are completed and the following requirements are met, technical acceptance work can be organized and implemented.
9.3 Acceptance of CEMS technical indicators
9.3.1 General requirements
9.3.1.1 The acceptance of CEMS technical indicators includes the acceptance of particulate matter CEMS, gaseous pollutant CEMS, flue gas parameter CMS technical indicators.
9.3.1.5 Certified standard materials or standard samples must be used for on-site acceptance. Standard gases with lower concentrations can be obtained by using high- concentration standard gases by proportional dilution method. The precision of the proportional dilution device is within 1%. Standard gases are required to be stored in aluminum or stainless steel bottles with an uncertainty of no more than ±2%.
9.3.3 Technical indicators acceptance of CEMS for gaseous pollutants and CMS
for oxygen
9.3.3.1 Acceptance content
The technical indicators acceptance of CEMS for gaseous pollutants and CMS for oxygen includes zero drift, span drift, indication error, system response time, accuracy acceptance. During the on-site acceptance, the indication error and system response time acceptance test shall be conducted first. If the acceptance does not meet the technical requirements, the acceptance of other items may not be continued.
......
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 7 pages — is available in the English PDF.
Referenced standards
Normative references
- GB 50057Code for design protection of structures against lightning
- GB 50168Standard for construction and acceptance of cable line electric equipment installation engineering
- GB/T 16157Determination of particulates and sampling methods of gaseous pollutants emitted from exhaust gas of stationary source
GB 4208 · GB 50093
Cited by
- GB 25466.1-2025Emission standard of air pollutants for lead and zinc industry
- HJ 212-2025Technical requirements for data transmission of pollutant automatic monitoring and surveillance systems
- HJ 57-2017Stationary source emission - Determination of sulfur dioxide - Fixed potential by electrolysis method
How to Download HJ 75-2017
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 50057-2010 — Code for design protection of structures against lightning
GB 50168-2018 — Standard for construction and acceptance of cable line electric equipment installation engineering