HG/T 2796-2009Magnesium oxide for soft magnetic ferrite use (English PDF)
软磁铁氧体用氧化镁
HG/T 2796 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| HG/T 2796-2009 | Magnesium oxide for soft magnetic ferrite use | Obsolete |
HG/T 2796-2009 is obsolete. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for HG/T 2796-2009 in 30 minutes.
Issued by
Ministry of Industry and Information Technology of the People's Republic of China
Level / Type
Industry · Recommended
Issue date
December 4, 2009
Implementation date
June 1, 2010
Scope
HG/T 2796-2009 is the English-translated version of 软磁铁氧体用氧化镁.
HG/T 2796-2009 is the Chinese industry standard "Magnesium oxide for soft magnetic ferrite use". It was issued on December 4, 2009 by the Ministry of Industry and Information Technology of the People's Republic of China, and took effect on June 1, 2010. It is obsolete: it has been withdrawn.
Found what you need?
Document preview — HG/T 2796-2009
National Standard of the People's Republic of China
Issued by: Ministry of Industry and Information Technology of the People's Republic of China
Contents
- Document data
1 Document data
Sector: Chemical Industry (industry standard).
Issuing body: Ministry of Industry and Information Technology of the People's Republic of China.
Date of issue: 2009-12-04.
Date of implementation: 2010-06-01.
Status: obsolete, withdrawn.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
How to Download HG/T 2796-2009
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
HG/T 2796-2009
$169.00