Valid

HAD 10313-2022Nuclear power plant operating experience feedback (published draft) (English PDF)

核动力厂运行经验反馈

Preview PDF

This is a limited preview

Buy now to download the full PDF (14 pages)

Need quotation for your management?

Get a formal quotation for HAD 10313-2022 in 30 minutes.

Issued by

State Nuclear Safety Administration

Level / Type

National · Mandatory

Issue date

September 1, 2022

Implementation date

September 1, 2022

Scope

HAD 10313-2022 is the English-translated version of 核动力厂运行经验反馈.

HAD 10313-2022 — This standard applies to the operation experience feedback work carried out by the nuclear power plant operating organization, especially the operation experience feedback work related to nuclear safety.

Found what you need?

Document preview — HAD 10313-2022

National Standard of the People's Republic of China

Issued by: State Nuclear Safety Administration

Contents

  • [Preview only]
  • 1 Introduction
  • 1.1 Purpose
  • 1.2 Scope
  • 2 Development of emergency response plans and relevant documents
  • 2.1 Requirements on emergency preparation and response at different stages
  • 2.2 Development of emergency response plan
  • 2.3 Emergency response plan implementation procedure
  • 2.4 Coordination of emergency response plans
  • 2.5 Public communication 3
  • 2.6 Other requirements 3
  • 3 Emergency organization
  • 3.1 General
  • 3.2 Main responsibilities and basic organizational structure of emergency organization
  • 3.3 Emergency headquarters
  • 3.4 Emergency action groups
  • 3.5 Assessment of safety functions
  • 3.6 Optimum analysis
  • 3.7 Assessment of long-term safety
  • 3.8 Engineering analysis
  • 3.9 Waste management assessment
  • 4 Design 6
  • 4.1 General requirements 6
  • 4.2 Design requirements for main safety functions 10
  • 4.3 Typical initiating events 19
  • 4.4 Instrument and control 29
  • 4.5 Human factor engineering 33
  • 4.6 Safety analysis 35
  • 4.7 Radioactive waste management 38
  • 4.8 Effluent discharge management 39
  • 4.9 Environment monitoring and evaluation 40
  • 5 Construction 42
  • 5.1 General requirements
  • 5.2 Waste source term reduction measures
  • 5.3 Recycling and reuse
  • 5.4 Waste processing for storage or disposal
  • 6 Commissioning 43
  • 6.2 Commissioning program
  • 6.3 Commissioning stage
  • 6.4 Commissioning report
  • 7 Operation 50
  • 7.1 Operation management requirements
  • 7.2 Facility operation
  • 7.3 Safe shutdown
  • 8 Decommissioning preparation 68

1 Foreword

HAD 10313-2022 was issued by State Nuclear Safety Administration on 1 September 2022 and took effect the same day.

The HAD prefix marks a nuclear safety guide.

The document runs to 14 pages in English translation.

2 Scope Preview

This standard applies to the operation experience feedback work carried out by the nuclear power plant operating organization, especially the operation experience feedback work related to nuclear safety. The experience feedback work of other nuclear facility operating organizations can also be implemented as a reference.

HAD 10313-2022 carries no ICS number and no Chinese Standard Classification code.

This catalogue holds 28 other HAD standards.

In this catalogue, HAD standards carry edition years from 2010 to 2023.

3 About this standard

Issued by: State Nuclear Safety Administration

English translation: about 14 pages

Chinese original: about 21,217 characters

4 Related standards

Standards on related subjects:

JB 2293-1978 — Wind tunnel test method of radiator of automobile and tractor

5 Classification and status

Prefix HAD: nuclear safety guide.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 14 pages — is available in the English PDF.

How to Download HAD 10313-2022

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
14 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

HAD 10313-2022

$474.00