GB/T 46180-2025Test method on electrical insulation performance of superconducting magnet made from CICC (English PDF)
管内电缆导体(CICC)型超导磁体电气绝缘性能测试方法
This is a limited preview
Buy now to download the full PDF (24 pages)
Need quotation for your management?
Get a formal quotation for GB/T 46180-2025 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
August 29, 2025
Implementation date
March 1, 2026
Scope
GB/T 46180-2025 is the English-translated version of 管内电缆导体(CICC)型超导磁体电气绝缘性能测试方法.
GB/T 46180-2025 sets out how the electrical insulation of a cable-in-conduit conductor (CICC) superconducting magnet is tested after manufacture and before the magnet is put into service.
It describes the DC Paschen withstand voltage test and the AC withstand voltage test, and lists the equipment needed: DC and AC hipot testers, a vacuum container, a vacuum unit, a helium source and a vacuum control system.
It also covers the test samples, the experimental steps, the processing of the data, the acceptance criteria and the content of the test report, with an informative annex on calculating the uncertainty of the current.
Magnets of similar structure and working conditions can be assessed by reference to it. It was issued on 29 August 2025 and has applied since 1 March 2026.
Found what you need?
Document preview — GB/T 46180-2025
National Standard of the People's Republic of China
- ICS
- 29.035
- Classification
- K 15
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Preface
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 Principle
- 4.1 DC Paschen withstand voltage test
- 4.2 AC withstand voltage test
- 5 Instruments and Equipment
- 5.1 DC Hipot Tester
- 5.2 AC Hipot Tester
- 5.3 Vacuum container
- 5.4 Vacuum unit
- 5.5 Helium Source
- 5.6 Vacuum Control System
- 5.7 Other Equipment
- 6 Experimental samples
- 7 Experimental Step
- 7.1 General requirements for testing
- 7.2 DC Paschen withstand voltage test
- 7.3 AC withstand voltage test
- 8 Experimental Data Processing
- 9 Acceptance Criteria
- 10 Test Report
- Appendix A (Informative) Current Uncertainty Calculation Method
- A.1 Evaluation of the standard uncertainty component UA introduced by measurement repeatability
- A.2 Calculation of the standard uncertainty UB caused by measuring instruments
- A.3 Calculation of combined standard uncertainty UC
- A.4 Evaluation of relative expanded uncertainty UI
- A.5 Calculation Example
- Reference
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting.
Introduction
Cable-in-tube conductor (CICC) superconducting magnets are becoming more and more widely used in superconducting magnet devices due to their excellent structure and performance.
Among them, superconducting magnet insulation is the core of the magnet device, and the quality of magnet insulation performance is directly related to the safe operation of the magnet device.
Some large CICC superconducting magnet devices have experienced discharge accidents due to insulation failure of superconducting magnets, which has caused serious damage to the magnet devices.
Different degrees of damage, even some irreversible effects. In the future, there will be many applications of CICC superconducting magnet devices, such as magnetic confinement fusion Therefore, in order to ensure the reliability and safety of CICC superconducting magnet devices, Before the official use, important electrical insulation performance parameters are obtained during the R&D and production process to judge the insulation performance of CICC superconducting magnets.
It is necessary to check whether the insulation performance meets the design requirements.
1 Scope
This document describes the test methods for the electrical insulation performance of cable-in-conduit (CICC) type superconducting magnets, including the DC withstand voltage test of superconducting magnets. Test, AC withstand voltage test, Paschen test.
This document is applicable to the performance test and safety assessment of CICC superconducting magnets after the manufacturing process is completed and before they are officially put into use.
The performance test and safety assessment of magnets with similar structures and working conditions shall be carried out as a reference.
2 Normative references
The contents of the following documents constitute the essential clauses of this document through normative references in this document.
For referenced documents without a date, only the latest version (including all revised versions) applies to this document.
GB/T 13979-2008 Mass spectrometer leak detector
GB 26861 Electricity Safety Work Regulations - High Voltage Laboratory Part
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1 Cable-in-conduit conductor
Use cables armored in closed conduits with multiple refrigerant channels inside the conduits.
3.2 Withstand voltage test
Verify the magnet device's ability to withstand DC or AC overvoltage tests.
3.3 Maximum operating voltage; Vn
The maximum voltage that a magnet can withstand under normal operating conditions.
Note: The maximum operating voltage is in kilovolts (kV).
3.4 Maximum fault voltage; Vf
The maximum voltage that a magnet can withstand under foreseeable fault conditions.
Note: The unit of maximum fault voltage is kilovolt (kV).
3.5 Leakage current
The magnetic insulation is subjected to a current flowing through it at a high DC voltage.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 24 pages — is available in the English PDF.
Referenced standards
How to Download GB/T 46180-2025
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 26861-2011 — Safety code of electric power industry - High voltage laboratory
GB/T 13979-2008 — Mass spectrometer leak detector
GB/T 7251.4-2026 — Low-voltage switchgear and controlgear assemblies - Part 4: Particular requirements for assemblies for construction sites (ACS)
Secure payment via Stripe
Payments accepted
GB/T 46180-2025
$420.00