Scope
GB/T 45905.3-2025 is the English-translated version of 电力现货市场运营 第3部分:省间技术支持系统.
GB/T 45905.3-2025 is the Chinese national standard covering the software platform that runs trading between provinces — the cloud architecture deployed across two sites that serve simultaneously, the functional requirements and the link to the power trading platform, the performance and the data interaction with the provincial systems, the reliability assurance and the cybersecurity level protection, and the detection tests that have to be passed before it takes real bids. Part 3 of the series, with the provincial system part GB/T 45905.2-2025. First edition, under the China Electricity Council. In force from 1 February 2026. Issued on 1 August 2025, it has been in force since 1 February 2026.
Document preview — GB/T 45905.3-2025
National Standard of the People's Republic of China
- ICS
- 29.240
- Classification
- F 20
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- PrefaceIII
- IntroductionIV
- 1 Scope1
- 2 Normative references1
- 3 Terms and Definitions1
- 4 System Architecture1
- 5 Functional Requirements3
- 6 Performance Requirements6
- 7 Data Interaction6
- 8 Reliability Assurance7
- 9 Safety Protection7
- 10 Detection Test7
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting.
This document is Part 3 of GB/T 45905 “Electricity Spot Market Operation”. GB/T 45905 has been published in the following parts.
— Part 1: Terminology;
— Part 2: Provincial technical support system;
— Part 3: Inter-provincial technical support system;
— Part 4: Load forecasting;
— Part 5: Calculation method for new energy participation in power balance;
— Part 6: Frequency modulation capacity management;
— Part 7: Spare capacity management;
— Part 8: Multi-cycle power and quantity balance calculation method;
— Part 9: Market power monitoring and mitigation;
— Part 10.Operational evaluation.
Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.
This document was proposed by the China Electricity Council.
This document is under the jurisdiction of the National Technical Committee for Standardization of Power Grid Operation and Control (SAC/TC446).
This document was drafted by: State Grid Corporation of China, China Electric Power Research Institute Co., Ltd., State Grid Corporation of China North China Branch, State Grid Corporation of China Southwest Branch, State Grid Corporation of China Central China Branch, Beijing Electric Power Exchange Center Co., Ltd., China Southern Power Grid Limited Liability Company, Inner Mongolia Electric Power (Group) Co., Ltd., Nanrui Group Co., Ltd., State Grid Zhejiang Electric Power Co., Ltd., State Grid No.
Sichuan Electric Power Co., Ltd., State Grid Jiangsu Electric Power Co., Ltd., State Grid Fujian Electric Power Co., Ltd., Tianjin Power Exchange Center Co., Ltd., Zhejiang Power Exchange Co., Ltd.
The main drafters of this document are: Tao Hongzhu, Li Lixin, Li Dan, Wang Chao, Ma Ke, Sun Dayan, Xu Hongqiang, Mu Yongzheng, Cai Yu, Cui Hui, Zhang Jiali, Luo Zhiqiang, Chang Naichao, Cui Da, Wang Delin, Liu Jinbo, Liu Dong, Wang Yanan, Cheng Yun, Han Bin, Guan Li, Zhang Yong, Luo Weihua, Chang Jiang, Li Bo, Hu Chenxu, Zhang Zhida, Hu Zhenyu, Xu Xialing, Xie Lirong, Gu Huijie, Guo Qi, Ji Shijie, Zhou Jieying, Wang Yang, Ma Ziming, Yao Weifeng, Li Zenghui, Zhang Xiao, Xu Danlei, Su Mengmeng, Qing Quan, Sun Yongchao, Huang Yunhao, Wu Shuzhou, Li Jinsong, Zhang Jing, Qian Jianguo, Tang Weidong, Huang Haiyu, Wang Gang, Fan Haifeng, Lai Yongsheng, Chen Shaojun, Wu Kegang, Wang Zi, Zhang Chi, Xu Qifeng, Peng Chaoyi, Huang Guodong, Zhang Chuancheng, Yan Jinghua, Wang Lei, Xu Dan, Guo Tao, Zhang Ruiwen, Xu Xiao, Zhang Shuyan, Mei Zheng, Li Min, Chang Li, Zhu Minjian, Ma Li, and Liu Wei.
Introduction
In order to further implement the national decision-making arrangements for deepening power system reform and accelerating the construction of a new power system, and to support the high-quality development of the power spot market, This series of standard.
GB/T 45905 "Electricity Spot Market Operation" covers terminology, provincial technical support system, inter-provincial technical support system, load forecasting, new energy Power balance calculation method for power source participation, frequency regulation capacity management, reserve capacity management, multi-cycle power balance calculation method, operation evaluation, etc.
GB/T 45905 is planned to consist of 10 parts.
— Part 1: Terminology. The purpose is to standardize the terms and definitions related to electricity spot market operation and grid operation, to provide a standardized and high-level Provide guidance for the effective construction and operation of electricity spot markets.
— Part 2: Provincial technical support system. The purpose is to standardize the system architecture, functional requirements, performance of the provincial technical support system requirements, data interaction, reliability assurance, security protection and other technical requirements, as a provincial technical support system design, development, construction and Basis for operation.
— Part 3: Inter-provincial technical support system. The purpose is to standardize the system architecture, functional requirements, performance of the inter-provincial technical support system requirements, data interaction, reliability assurance, security protection and other technical requirements, as the provincial technical support system design, development, construction and Basis for operation.
— Part 4: Load Forecasting. The purpose is to specify the basic technical requirements for load forecasting in the electricity spot market, which is used to guide the Market operating institutions, business entities and power grid companies carry out short-term and ultra-short-term system load forecasting, bus load forecasting and Household load forecasting.
— Part 5: Calculation method for new energy participating in power balance. The purpose is to standardize the power spot market environment, wind power, photovoltaic power, etc.
Principles, calculation methods and basic data requirements for the participation of new energy in electricity balance at different scales.
— Part 6: Frequency Regulation Capacity Management. The purpose is to standardize the overall requirements and calculation methods for frequency regulation capacity setting in the spot market, clarify Determine the frequency regulation capacity evaluation and adjustment methods, improve the standardization of the frequency regulation market and the compliance level of the spot market, and guide provincial/regional The power grid carries out frequency regulation capacity management.
— Part 7: Spare capacity management. The purpose is to standardize spare capacity configuration, spare capacity mutual assistance, spare capacity recovery and other requirements.
Provide guidance to provincial/regional power grids on reserve capacity management.
— Part 8: Multi-cycle power and quantity balance calculation method. The purpose is to specify the basic requirements for multi-cycle power and quantity balance calculation.
The requirements, data requirements, calculation methods and conclusion analysis are used to guide provincial and above power grids in dispatching production organization and spot market operation.
Carry out multi-cycle (year, month, week, day) power and electricity balance work during the process.
— Part 9: Market power monitoring and mitigation. The purpose is to standardize the monitoring methods and mitigation of market power in provincial/regional electricity spot markets.
Mitigation measures provide guidance for market power monitoring and mitigation.
— Part 10.Operational evaluation. The purpose is to standardize the evaluation requirements, evaluation indicators, and evaluation of provincial/regional electricity spot market operations.
The evaluation methods are used to provide guidance for the operation evaluation of the electricity spot market.
Electricity spot market operations Part 3: Inter-provincial technical support system
1 Scope
This document specifies the system architecture, functional requirements, The technical requirements such as performance requirements, data interaction, reliability assurance, and safety protection are described, and the corresponding detection and test methods are described.
This document applies to the design, development, construction and operation of the inter-provincial technical support system.
2 Normative references
GB/T 22239-2019
GB/T 45905.1
3 Terms and Definitions
The terms and definitions defined in GB/T 45905.1 apply to this document.
4 System Architecture
4.1 The inter-provincial technical support system should adopt a cloud architecture, with the platform and applications deployed in the cloud, supporting national dispatching agencies and inter-provincial dispatching agencies.
Users can use the human-machine terminal to access the system on site and realize the function and data interaction with the provincial technical support system; the system should adopt dual-station The system is deployed on a point-to-point basis, supporting real-time data synchronization between sites and simultaneous service provision at two sites. Figure 1 shows the typical architecture of the inter-provincial technical support system.
Figure 1 Typical architecture of the inter-provincial technical support system 4.2 The inter-provincial technical support system should be connected to the power trading platform to support the acquisition of market declaration information of business entities and market disclosure
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Editions of GB/T 45905.3
| Edition | Title | Revision | Status |
|---|---|---|---|
| GB/T 45905.3-2025 | Electricity spot market operation - Part 3: Inter provincial technical support system | current edition | Current |
This page sells the current edition, GB/T 45905.3-2025. Earlier editions are listed for reference only.
How to Buy GB/T 45905.3-2025
- 1Add to cart. Click the "Buy GB/T 45905.3-2025" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 22239-2019 — Information security technology - Baseline for classified protection of cybersecurity
GB/T 45905.1-2025 — Electricity spot market operation — Part 1: Terminology
GB/T 45905.10-2025 — Electricity spot market operation — Part 10: The evaluation of operation
Secure payment via Stripe
Payments accepted
GB/T 45905.3-2025
$260.00