GB/T 45905.2-2025Electricity spot market operation — Part 2: Provincial technical support system (English PDF)
电力现货市场运营 第2部分:省级技术支持系统
Open the GB/T 45905.2-2025 preview as PDF
This is a limited preview
Buy now to download the full PDF (17 pages)
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
August 1, 2025
Implementation date
February 1, 2026
Scope
GB/T 45905.2-2025 is the English-translated version of 电力现货市场运营 第2部分:省级技术支持系统.
GB/T 45905.2-2025 is the Chinese national standard covering the software a province runs its electricity spot market on — the architecture deployed at two sites, the functional requirements for the market operator terminals, the performance requirements, the data interaction with the systems around it, the reliability provisions that keep a market clearing on time when a site fails, the cybersecurity level protection, and the tests by which the system is accepted. Part 2 of the series of ten. First edition, under the China Electricity Council. In force from 1 February 2026. Issued on 1 August 2025, it has been in force since 1 February 2026.
Document preview — GB/T 45905.2-2025
National Standard of the People's Republic of China
- ICS
- 29.240
- Classification
- F 20
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- PrefaceIII
- IntroductionIV
- 1 Scope1
- 2 Normative references1
- 3 Terms and Definitions1
- 4 System Architecture1
- 5 Functional Requirements3
- 6 Performance Requirements7
- 7 Data Interaction7
- 8 Reliability Assurance8
- 9 Safety Protection8
- 10 Detection Test8
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting.
This document is Part 2 of GB/T 45905 “Electricity Spot Market Operation”. GB/T 45905 has been published in the following parts.
— Part 1: Terminology;
— Part 2: Provincial technical support system;
— Part 3: Inter-provincial technical support system;
— Part 4: Load forecasting;
— Part 5: Calculation method for new energy participation in power balance;
— Part 6: Frequency modulation capacity management;
— Part 7: Spare capacity management;
— Part 8: Multi-cycle power and quantity balance calculation method;
— Part 9: Market power monitoring and mitigation;
— Part 10.Operational evaluation.
Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.
This document was proposed by the China Electricity Council.
This document is under the jurisdiction of the National Technical Committee for Standardization of Power Grid Operation and Control (SAC/TC446).
This document was drafted by: State Grid Corporation of China, NARI Nanjing Control System Co., Ltd., State Grid Zhejiang Electric Power Co., Ltd., State Grid Gansu Electric Power Company, State Grid Shanxi Electric Power Company, State Grid Sichuan Electric Power Company, State Grid Shandong Electric Power Company, State Grid Fujian Electric Power Company Power Co., Ltd., China Electric Power Research Institute Co., Ltd., State Grid Jiangsu Electric Power Co., Ltd., Guangdong Power Grid Co., Ltd., China Southern Power Grid Inner Mongolia Electric Power (Group) Co., Ltd., Beijing Power Exchange Co., Ltd., Guangzhou Power Exchange China Huadian Corporation, China Datang Corporation, China Huadian Corporation, State Power Investment Corporation China Energy Investment Group Co., Ltd. and China National Energy Investment Group Co., Ltd.
The main drafters of this document are: Chang Naichao, Li Dan, Xu Hongqiang, Wang Chao, Ma Ke, Chang Li, Cai Yu, Mu Yongzheng, Sun Dayan, Wang Yang, Tao Hongzhu, Zhu Minjian, Zhao Wenna, Zhang Guofang, Luo Zhiqiang, Xiao Yanwei, Si Xiaofeng, Liu Jinbo, Kuang Honghui, Shao Lisong, Zhu Liye, Zheng Yaxian, Kong Piaohong, Li Huicong, Cao Rongzhang, Zhang Yantao, Cao Bin, Ma Yin, Zhou Yuqing, Wang Yanan, Wu Li, Wu Jing, Fan Yihui, Zhou Jieying, Han Bin, Zhou Huafeng, He Yubin, Zhao Ruifeng, Zhang Jiali, Lu Manyi, Li Hongbo, Zhang Xiao, Zhan Xiong, Lu Jiangang, Cai Qiuna, Zhang Dandan, Guo Tao, Wang Lei, Gao Zhipeng, Peng Hu, Wu Bingxiang, Yan Jinghua, Bai Xin, Wang Wen, Liang Ye, He Lei, Xie Xu, and Jiang Youquan.
Introduction
In order to further implement the national decision-making arrangements for deepening power system reform and accelerating the construction of a new power system, and to support the high-quality development of the power spot market, This series of standard.
GB/T 45905 "Electricity Spot Market Operation" covers terminology, provincial technical support system, inter-provincial technical support system, load forecasting, new energy Power balance calculation method for power source participation, frequency regulation capacity management, reserve capacity management, multi-cycle power balance calculation method, operation evaluation, etc.
GB/T 45905 is planned to consist of 10 parts.
— Part 1: Terminology. The purpose is to standardize the terms and definitions related to electricity spot market operation and grid operation, to provide a standardized and high-level Provide guidance for the effective construction and operation of electricity spot markets.
— Part 2: Provincial technical support system. The purpose is to standardize the system architecture, functional requirements, performance of the provincial technical support system requirements, data interaction, reliability assurance, security protection and other technical requirements, as a provincial technical support system design, development, construction and Basis for operation.
— Part 3: Inter-provincial technical support system. The purpose is to standardize the system architecture, functional requirements, performance of the inter-provincial technical support system requirements, data interaction, reliability assurance, security protection and other technical requirements, as the provincial technical support system design, development, construction and Basis for operation.
— Part 4: Load forecasting. The purpose is to specify the basic technical requirements for load forecasting in the electricity spot market, which is used to guide the Market operators, business entities and power grid companies carry out short-term and ultra-short-term system load forecasting, bus load forecasting and Household load forecasting.
— Part 5: Calculation method for new energy participating in power balance. The purpose is to standardize the power spot market environment, wind power, photovoltaic power, etc.
Principles, calculation methods and basic data requirements for the participation of new energy in electricity balance at different scales.
— Part 6: Frequency Regulation Capacity Management. The purpose is to standardize the overall requirements and calculation methods for frequency regulation capacity setting in the spot market, clarify Determine the frequency regulation capacity evaluation and adjustment methods, improve the standardization of the frequency regulation market and the compliance level of the spot market, and guide provincial/regional The power grid carries out frequency regulation capacity management.
— Part 7: Spare capacity management. The purpose is to standardize spare capacity configuration, spare capacity mutual assistance, spare capacity recovery and other requirements.
Provide guidance to provincial/regional power grids on reserve capacity management.
— Part 8: Multi-cycle power and quantity balance calculation method. The purpose is to specify the basic requirements for multi-cycle power and quantity balance calculation.
The requirements, data requirements, calculation methods and conclusion analysis are used to guide provincial and above power grids in dispatching production organization and spot market operation.
Carry out multi-cycle (year, month, week, day) power and electricity balance work during the process.
— Part 9: Market power monitoring and mitigation. The purpose is to standardize the monitoring methods and mitigation of market power in provincial/regional electricity spot markets.
Mitigation measures provide guidance for market power monitoring and mitigation.
— Part 10.Operational evaluation. The purpose is to standardize the evaluation requirements, evaluation indicators, and evaluation of provincial/regional electricity spot market operations.
The evaluation methods are used to provide guidance for the operation evaluation of the electricity spot market.
Electricity spot market operations Part 2: Provincial Technical Support System
1 Scope
This document specifies the system architecture, functional requirements, The technical requirements such as performance requirements, data interaction, reliability assurance, and safety protection are described, and the corresponding detection and test methods are described.
This document applies to the design, development, construction and operation of provincial technical support systems.
2 Normative references
GB/T 22239-2019
GB/T 45905.1
3 Terms and Definitions
The terms and definitions defined in GB/T 45905.1 apply to this document.
4 System Architecture
4.1 The provincial technical support system should be deployed in two sites, supporting provincial dispatching agency users to access the system using human-machine terminals and supporting sites The typical architecture of the provincial technical support system is shown in Figure 1.
Figure 1 Typical architecture of provincial technical support system
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 17 pages — is available in the English PDF.
Referenced standards
Editions of GB/T 45905.2
| Edition | Title | Revision | Status |
|---|---|---|---|
| GB/T 45905.2-2025 | Electricity spot market operation - Part 2: Provincial technical support system | current edition | Current |
This page sells the current edition, GB/T 45905.2-2025. Earlier editions are listed for reference only.
How to Buy GB/T 45905.2-2025
- 1Add to cart. Click the "Buy GB/T 45905.2-2025" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 22239-2019 — Information security technology - Baseline for classified protection of cybersecurity
GB/T 45905.1-2025 — Electricity spot market operation — Part 1: Terminology
GB/T 45905.10-2025 — Electricity spot market operation — Part 10: The evaluation of operation
Secure payment via Stripe
Payments accepted
GB/T 45905.2-2025
$305.00