Valid

GB/T 45078-2024Guidelines for construction of gateway community of national park (English PDF)

国家公园入口社区建设指南

Open the GB/T 45078-2024 preview as PDF

Preview — first pages of GB/T 45078-2024 (full document: 15 pages)

This is a limited preview

Buy now to download the full PDF (15 pages)

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

November 28, 2024

Implementation date

November 28, 2024

Scope

GB/T 45078-2024 is the English-translated version of 国家公园入口社区建设指南.

GB/T 45078-2024 is the Chinese national standard covering the village cluster at the entrance road of a national park that takes the visitors the park itself cannot host — the dominant and combined functions it must carry, the siting conditions and the construction layout, the facility system, the green development and the co-construction platform that ties the park authority to the residents, and the negative lists of what may not be built there. First edition, under the National Forestry and Grassland Administration. In force from 28 November 2024. Issued on 28 November 2024, it has been in force since 28 November 2024.

Document preview — GB/T 45078-2024

National Standard of the People's Republic of China

ICS
65.020
Classification
B 65

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • PrefaceIII
  • 1 Scope1
  • 2 Normative references1
  • 3 Terms and Definitions1
  • 4 Functional Positioning1
  • 5 Basic Principles2
  • 6 Construction elements2
  • 7 Construction conditions2
  • 8 Construction layout3
  • 9 Facilities System4
  • 10 Green Development7
  • 11 Co-construction and sharing platform construction8
  • 12 Negative List9
  • Appendix A (Informative) Negative List of Prohibited Categories1012
  • Appendix B (Informative) Negative List of Restrictions11 Reference12

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting.

Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.

This document is proposed and coordinated by the State Forestry and Grassland Administration.

This document was drafted by: Forestry and Grassland Survey and Planning Institute of the State Forestry and Grassland Administration, Beijing Forestry University, Institute of Geography, Chinese Academy of Sciences, Tsinghua University University of North Carolina School of Management, Fudan University, and Tongji University.

The main drafters of this document are: Qiao Yongqiang, Tang Xiaoping, Hua Ning, Zhang Yujun, Jiang Yafang, Zhang Bolin, Xu Wentong, Zhong Linsheng, Shen Xingna, Zhang Chaozhi, Yang Rui, Wu Chengzhao, Zhuang Youbo, Tian He, Wang Daoyang, Li Xuewu, Zhang Xiaobo, Zhao Zhiguo, Liu Yuheng, Dang Jingwen, Zhao Siyuan, Zong Xue, Li Xiyuan, Wang Binshan, Wu En, Tian Jiani, Li Lunyang, Li Xiaowei, Wang Weicai, Yang Hong, Fu Mingxia, Qiu Shouming, Ma Youming.

National Park Gateway Community Development Guide

1 Scope

This document proposes the functional positioning, general principles, and construction conditions of national park entrance communities, and provides a basis for construction layout, facility system, and green development.

Provide guidance on development, co-construction and sharing.

This document applies to the construction, management, and operation of national park entrance communities.

2 Normative references

GB/T 10001.1

GB 55019

3 Terms and definitions

The following terms and definitions apply to this document.

3.1 Village clusters (residential areas) that provide services such as ecological protection

Located at the main nodes of the national park entrance and exit roads, adjacent to or across the national park boundaries, it provides a good opportunity for national park recreational experience, scientific research, education and life.

4 Functional Positioning

4.1 Dominant Function

National park entrance communities should have the following dominant functions.

— It has the function of a national park gateway area. Visitors can get transportation distribution, consultation guidance, leisure shopping and other corresponding services at the entrance community. Serve.

— Display the characteristics of the national park's ecosystem, biodiversity, natural landscape, natural relics, etc., and carry out popular science education and ecological experience, etc. Activity.

— Build a comprehensive platform for cooperation between national park management agencies and relevant local management agencies and local communities.

— Provide a platform for the general public to participate in protection, construction and cultural inheritance.

4.2 Combined functions

National park entrance communities can combine the following functions.

— Cultivate green industries. Make use of the resources and location conditions of the national park and its surrounding areas, and give full play to the national park’s own brand and characteristic resources.

The resource and environment enablement role of cultivating and developing green planting, popular science education, ecological leisure, ecological camping, outdoor sports, culture

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Editions of GB/T 45078

EditionTitleRevisionStatus
GB/T 45078-2024Guidelines for construction of gateway community of national parkcurrent editionCurrent

This page sells the current edition, GB/T 45078-2024. Earlier editions are listed for reference only.

How to Buy GB/T 45078-2024

  1. 1Add to cart. Click the "Buy GB/T 45078-2024" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 45078-2024

$260.00

$220.00for partners