GB/T 44639.6-2024Railway applications - Energy measurement on board trains - Part 6: Requirements for purposes other than billing (English PDF)
This is a limited preview
Buy now to download the full PDF (59 pages)
Need quotation for your management?
Get a formal quotation for GB/T 44639.6-2024 in 30 minutes.
Issued by
State Administration for Market Regulation, China National Standardization Administration
Level / Type
National · Recommended
Issue date
September 29, 2024
Implementation date
April 1, 2025
Scope
GB/T 44639.6-2024 (Railway applications - Energy measurement on board trains - Part 6: Requirements for purposes other than billing) is available as an English-translated PDF.
GB/T 44639.6-2024 — This document specifies the specific requirements for energy measurement systems (EMS) used for energy benchmarking, routine energy consumption monitoring, and energy technology research and development.
Physical requirements. This document provides a convenient way to monitor the on-board power consumption in daily train operation. The data is applicable to industry sectors such as power management, energy conservation, etc. This document is not intended for billing purposes.
Note 1.EMS has practical uses in the following areas. a) Daily power monitoring of vehicles; b) Analyze the relationship between train operation and electric energy by acquiring data under influencing factors such as operating instructions and environmental conditions; c) electrical energy management of power flows between the vehicle and ground units; d) Perform investigative testing for train system development; e) Predict electricity costs through overall electricity efficiency and consumption analysis.
The requirements specified in this document supplement and/or modify the requirements specified in GB/T 44639.1~GB/T 44639.5. This document is applicable to level 2 and level 3 electrical energy measurement systems.
Note 2.Table 1 gives the performance level classification of electric energy measurement systems. NOTE 3 Unless otherwise specified, the requirements in this document apply to both Level 2 and Level 3 energy measurement systems.
Table 1 Performance level Level Description Notes Level 1 is suitable for on-board power measurement for power management, energy saving, billing, etc. This is the only level suitable for billing Level 2 Suitable for power management, energy saving, supplier or train operator benchmarking this level is not suitable for on-board power measurement in areas such as for international comparative measurements or benchmarking, etc., Level 2 EMS should the measurement accuracy is also very high.
Level 3 Suitable for daily power measurement, such as technology research and development. This level is not applicable for billing this rating is based on user needs, performance and usage conditions.
Level 1 EMS strict. According to the existing sensors installed in the converter system, Voltage and current data to calculate power and energy
Found what you need?
Document preview — GB/T 44639.6-2024
National Standard of the People's Republic of China
- ICS
- 45.060
- Classification
- S 34
Issued by: State Administration for Market Regulation, China National Standardization Administration
Contents
- Preface
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms, definitions, abbreviations and symbols
- 3.1 Terms and Definitions
- 3.2 Abbreviations
- 3.3 Symbols
- 4 Requirement
- 4.1 General requirements
- 4.2 EMS system
- 4.3 Electrical Energy Measurement
- 4.4 Data Processing
- 4.5 Communication
- 4.6 Conformance Test
- 5 Conformance Test
- 5.1 Overview
- 5.2 Energy Measurement Conformance Test
- 5.3 Data processing consistency test
- 5.4 Communication consistency test
- 5.5 Conformance test procedure
- 6 Supplements and modifications to the relevant appendices of GB/T 44639.1~GB/T 44639.5
- 6.1 GB/T 44639.1 Appendix Supplement and Modification
- 6.2 GB/T 44639.2 Appendix Supplement and Modification
- 6.3 GB/T 44639.3 Appendix Supplement and Modification
- 6.4 GB/T 44639.4 Appendix Supplement and Modification
- 6.5 GB/T 44639.5 Appendix Supplement and Modification
- Appendix A (Informative) Differences between Level 1 EMS, Level 2 EMS and Level 3 EMS
- Appendix B (Normative) List of Additional Technical Conditions
- Appendix C (Informative) Examples of Distributed Measurement Installation Points
- Appendix D (Informative) Measurement of non-sinusoidal waves
- References
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting.
This document is Part 6 of GB/T 44639 "Electric Energy Measurement System for Rail Transit Trains".
Lower part.
--- Part 1: General;
--- Part 2: Electrical energy measurement;
--- Part 3: Data processing;
--- Part 4: Communications;
--- Part 5: Conformance test;
--- Part 6: Requirements other than billing.
This document is modified to adopt IEC 62888-6:2019 "Rail transit train energy measurement systems Part 6: Requirements other than billing".
This document has the following structural adjustments compared to IEC 62888-6:2019.
---6.2.1 corresponds to 6.2.2 in IEC 62888-6:2019;
---6.2.2 corresponds to 6.2.3 in IEC 62888-6:2019;
---6.2.3 corresponds to 6.2.1 in IEC 62888-6:2019;
---6.4.1 corresponds to 6.4.2 in IEC 62888-6:2019;
---6.4.2 corresponds to 6.4.1 in IEC 62888-6:2019;
--- Appendix A corresponds to Appendix C of IEC 62888-6:2019;
--- Appendix C corresponds to Appendix A of IEC 62888-6:2019;
--- Appendix D corresponds to Appendix B of IEC 62888-6:2019.
The technical differences between this document and IEC 62888-6:2019 and their reasons are as follows.
--- Replace IEC 60850 with the normative reference GB/T 1402 to adapt to my country's technical conditions and increase operability;
--- Replace IEC 60044-8 with the normative reference GB/T 20840.8 to adapt to my country's technical conditions and increase operability;
--- Replace IEC 62236-3-2 with the normative reference GB/T 24338.4 to adapt to my country's technical conditions and increase operability;
--- Replace IEC 61287-1 with the normative reference GB/T 25122.1 to adapt to my country's technical conditions and increase operability;
--- Replace IEC 62497-1 with the normative reference GB/T 32350.1 to adapt to my country's technical conditions and increase operability;
--- Replace IEC 62625-1 with the normative reference GB/T 42286.1 to adapt to my country's technical conditions and increase operability;
--- Added normative Appendix B "List of additional technical conditions" to adapt to my country's technical conditions and increase operability.
The following editorial changes were made to this document.
--- Adjust the explanatory text in Chapter 1 "Scope" to a note;
--- Deleted abbreviations such as DSI, ESI, MCF, RAMS, etc.;
---Rearrange chapter titles.
Introduction
Energy efficiency is essential to meet the challenges of supporting energy policies, protecting the environment and conserving natural resources.
Energy efficiency, especially the standardization of overall energy efficiency of rail transit vehicles, has attracted great attention from the rail transit industry, and relevant standards are being gradually formulated.
The main contents include the definition and boundary of energy efficiency, influencing factors, test methods, etc. GB/T 44639 "Railway Transit Train the Electric Energy Measurement System aims to standardize the process of acquiring train electric energy data and ensure the reliability of the data. It is planned to consist of six parts.
--- Part 1: General. The purpose is to specify the system-level requirements of the energy measurement system and to implement one or more General requirements for equipment with multiple functions.
--- Part 2: Electric energy measurement. The purpose is to specify the requirements for electric energy measurement functions for measuring the electric energy consumed and regenerated by traction units, and Requirements for the voltage measurement function, current measurement function and energy calculation function that make up the energy measurement function.
--- Part 3: Data processing. The purpose is to specify the data processing system and ground data collection service in the electric energy measurement system requirements.
--- Part 4: Communications. The purpose is to specify the requirements for on-board data communication services and vehicle-to-ground communication services of the energy measurement system.
These communication services enable data to be transferred between functions within the energy measurement system, between the energy measurement system and other on-board units, and between data Handles exchanges between the system and ground servers.
--- Part 5: Conformance test. The purpose is to specify the consistency test of new energy measurement systems installed on traction units Arrangements, and conformance testing procedures for replacement of equipment and auxiliary components.
--- Part 6: Requirements other than billing. The purpose is to clarify the requirements for energy consumption benchmark testing, daily energy consumption monitoring, and technology research and development.
Able to measure the specific requirements of the system.
The functional structure, main sub-functions and data flow of the train energy measurement system (EMS) are shown in Figure 1.
Figure 1 Schematic diagram of EMS functional structure and data flow
Rail transit train power measurement system Part 6: Requirements other than billing
1 Scope
This document specifies the specific requirements for energy measurement systems (EMS) used for energy benchmarking, routine energy consumption monitoring, and energy technology research and development.
Physical requirements.
This document provides a convenient way to monitor the on-board power consumption in daily train operation.
The data is applicable to industry sectors such as power management, energy conservation, etc. This document is not intended for billing purposes.
Note 1.EMS has practical uses in the following areas.
a) Daily power monitoring of vehicles;
b) Analyze the relationship between train operation and electric energy by acquiring data under influencing factors such as operating instructions and environmental conditions;
c) electrical energy management of power flows between the vehicle and ground units;
d) Perform investigative testing for train system development;
e) Predict electricity costs through overall electricity efficiency and consumption analysis.
The requirements specified in this document supplement and/or modify the requirements specified in GB/T 44639.1~GB/T 44639.5.
This document is applicable to level 2 and level 3 electrical energy measurement systems.
Note 2.Table 1 gives the performance level classification of electric energy measurement systems.
NOTE 3 Unless otherwise specified, the requirements in this document apply to both Level 2 and Level 3 energy measurement systems.
Table 1 Performance level
Level Description Notes Level 1 is suitable for on-board power measurement for power management, energy saving, billing, etc. This is the only level suitable for billing Level 2 Suitable for power management, energy saving, supplier or train operator benchmarking this level is not suitable for on-board power measurement in areas such as for international comparative measurements or benchmarking, etc., Level 2 EMS should the measurement accuracy is also very high.
Level 3
Suitable for daily power measurement, such as technology research and development. This level is not applicable for billing this rating is based on user needs, performance and usage conditions.
Level 1 EMS strict.
According to the existing sensors installed in the converter system, Voltage and current data to calculate power and energy
2 Normative references
The contents of the following documents constitute the essential clauses of this document through normative references in this document.
For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to this document.
GB/T 1402 Voltage of rail transit traction power supply system (GB/T 1402-2010, IEC 60850:2007, MOD) GB/T 20840.8 Instrument transformers Part 8: Electronic current transformers (GB/T 20840.8-2007, IEC 60044-8.
2002, MOD)
GB/T 24338.4 Rail Transit Electromagnetic Compatibility Part 3-2.Rolling Stock Equipment (GB/T 24338.4-2018,
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 59 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 1402Railway applications - Supply voltages of traction systems
- GB/T 1402-2010Railway applications - Supply voltages of traction systems
- GB/T 24338.4Railway applications -- Electromagnetic compatibility -- Part 3-2: Rolling stock -- Apparatus
- GB/T 24338.4-2018Railway applications -- Electromagnetic compatibility -- Part 3-2: Rolling stock -- Apparatus
IEC 60850 · GB/T 20840.8 · GB/T 20840.8-2007 · IEC 60044
How to Download GB/T 44639.6-2024
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 1402-2025 — Railway applications - Supply voltages of traction systems
GB/T 14020-2024 — Hydrogenated rosin
GB/T 14020-2026 — Deep-processing products of rosin
Secure payment via Stripe
Payments accepted
GB/T 44639.6-2024
$965.00