GB/T 44137-2024Technical requirements for the integration of customers with high power quality demands (English PDF)
高电能质量需求用户接入电网技术要求
This is a limited preview
Buy now to download the full PDF (14 pages)
Need quotation for your management?
Get a formal quotation for GB/T 44137-2024 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
June 29, 2024
Implementation date
October 1, 2024
Scope
GB/T 44137-2024 is the English-translated version of 高电能质量需求用户接入电网技术要求.
China's national technical requirements for connecting customers whose processes demand high power quality. The customers in question are semiconductor fabs, display panel plants, precision manufacturing and data centres, and their difficulty is that the grid's ordinary quality is not good enough for them.
A voltage dip of a tenth of a second - caused by a fault kilometres away on a different feeder, cleared correctly by the protection, and unnoticed by every other customer - will trip a fab's process tools and scrap a day's wafers.
Nothing is wrong with the network; the sensitivity is the customer's.
So the requirements have to allocate responsibility between them: what quality the network undertakes to provide, what immunity the customer's equipment must have, and what mitigation - dynamic voltage restorers, uninterruptible supplies, ride-through - the customer installs on their own side of the meter.
Found what you need?
Document preview — GB/T 44137-2024
National Standard of the People's Republic of China
- ICS
- 29.020
- Classification
- K 04
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- 1 Scope1
- 2 Normative references1
- 3 Terms and Definitions1
- 4 General requirements2
- 5 Grid connection requirements for users with high power quality requirements2
- 6 Technical requirements for electricity suppliers2
- 7 Technical requirements for users with high power quality requirements2
- 9 Reference10
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part
1.Structure and drafting rules for standardization documents" Drafting is required. Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document is proposed and coordinated by the National Technical Committee for Standardization of Voltage, Current Levels and Frequency (SAC/TC1). This document was drafted by: State Grid Jiangsu Electric Power Co., Ltd. Electric Power Research Institute, China Machinery Productivity Promotion Center Co., Ltd., Wuhan University, Xi'an Boyu Electric Co., Ltd., South China University of Technology, State Grid Ningxia Electric Power Co., Ltd. Electric Power Research Institute, Shenzhen Power Supply Bureau Co., Ltd. Company, Guangdong Power Grid Co., Ltd. Electric Power Research Institute, State Grid Anhui Electric Power Co., Ltd. Electric Power Research Institute, State Grid Fujian Electric Power Co., Ltd. Electric Power Research Institute of China Electric Power Co., Ltd., China National Nuclear Corporation, Electric Power Research Institute of State Grid Shanxi Electric Power Co., Ltd., Southwest Jiaotong University Jiangsu Provincial People's Hospital, State Grid Hubei Electric Power Co., Ltd. Electric Power Research Institute, Sichuan University, Shandong Taikai Automation Co., Ltd., Nanjing High Speed Gear Manufacturing Co., Ltd., Shenzhen China Electric Power Technology Co., Ltd., Pushtong (Beijing) Electric Co., Ltd., Huahe Nuclear Power Gas Co., Ltd. The main drafters of this document are. Shi Mingming, Chen Hongkun, Liu Jing, Zhang Ping, Shi Shuaibin, Liu Juncheng, Zhong Qing, Fei Juntao, Zheng Xian, Huang Yongning, Wang Ling, Ji Changan, Lin Yan, Meng Zhaojun, Li Jiahui, Ma Ming, Zhang Min, Xie Shaofeng, Yu Jianyu, Huang Zengrui, Wang Ying, Zhang Yubin, Wang Xin, Guo Zhaojing, Zhang Bo, Qu Xuejing and Yang Kaiyong. Technical requirements for grid access for users with high power quality requirements
1 Scope
China's national technical requirements for connecting customers whose processes demand high power quality. The customers in question are semiconductor fabs, display panel plants, precision manufacturing and data centres, and their difficulty is that the grid's ordinary quality is not good enough for them. A voltage dip of a tenth of a second - caused by a fault kilometres away on a different feeder, cleared correctly by the protection, and unnoticed by every other customer - will trip a fab's process tools and scrap a day's wafers. Nothing is wrong with the network; the sensitivity is the customer's. So the requirements have to allocate responsibility between them: what quality the network undertakes to provide, what immunity the customer's equipment must have, and what mitigation - dynamic voltage restorers, uninterruptible supplies, ride-through - the customer installs on their own side of the meter.
This document specifies the general requirements for users with high power quality requirements to access the power grid, grid connection requirements, technical requirements for power suppliers, high power quality requirements, Technical requirements for users with quality needs and technical requirements for power quality monitoring and evaluation at assessment points. This document applies to power quality management during the planning, design, grid connection and operation of users with high power quality requirements accessing the power grid.
2 Normative references
The contents of the following documents constitute the essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to this document.
GB/T 17626.30 Electromagnetic compatibility test and measurement technology Power quality measurement method
3 Terms and definitions
The following terms and definitions apply to this document.
3.1 Power supplier A market member that provides electricity and power to users in accordance with the contract. [Source: GB/T 2900.87-2011, 617-02-08, modified]
3.2 Power userpowercustomer Electricity consumers who establish electricity supply and consumption relationships with electricity suppliers in accordance with contracts, as well as customers who purchase electricity products or receive services. [Source: GB/T 32507-2016, 2.1.18, modified]
3.3 sensitive load sensitiveload Loads whose power quality requirements exceed the range specified by power quality standards. [Source: GB/T 32507-2016, 2.1.26, modified]
3.4 point of connection The connection reference point between the user's power equipment and the power system. [Source: GB/T 2900.87-2011,617-04-01]
3.5 Power users with sensitive loads or special power quality requirements.
3.6 Checkpoint The power quality indicator measurement points agreed upon by both parties in the power supply and use agreement. [Source: DL/T 1198-2013, 3.9, modified]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 14 pages — is available in the English PDF.
Referenced standards
How to Download GB/T 44137-2024
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 17626.30-2012 — Electromagnetic compatibility - Testing and measurement techniques - Power quality measurement methods
GB/T 17626.30-2023 — Electromagnetic compatibility - Testing and measurement techniques - Part 30: Power quality measurement methods
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
Secure payment via Stripe
Payments accepted
GB/T 44137-2024
$285.00