GB/T 43064.4-2024Guidelines for intelligent plants construction—Part 4: Design documents for intelligent plant (English PDF)

智能工厂建设导则 第4部分:智能工厂设计文件编制

Open the GB/T 43064.4-2024 preview as PDF

Preview — first pages of GB/T 43064.4-2024 (full document: 24 pages)

This is a limited preview

Buy now to download the full PDF (24 pages)

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

March 15, 2024

Implementation date

October 1, 2024

Scope

GB/T 43064.4-2024 is the English-translated version of 智能工厂建设导则 第4部分:智能工厂设计文件编制.

GB/T 43064.4-2024 is the Chinese national standard covering guidelines for intelligent plants construction, Part 4: Design documents for intelligent plant. Issued on 15 March 2024, it has been in force since 1 October 2024.

Document preview — GB/T 43064.4-2024

National Standard of the People's Republic of China

ICS
35.240.50
Classification
L 67

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • PrefaceIII
  • IntroductionIV
  • 1 Scope1
  • 2 Normative references1
  • 3 Terms and Definitions1
  • 4 Abbreviations1
  • 5 General Requirements1
  • 6 Feasibility Study Report2
  • 6.1 General requirements2
  • 6.2 General2
  • 6.3 Basic information of the factory2
  • 6.4 Requirements Analysis3
  • 6.5 Overall design plan and phased construction content3
  • 6.6 Project Design Documents3
  • 6.7 Project Implementation Progress5
  • 6.8 Project Investment and Financing and Financial Plan5
  • 6.9 Project Risk Analysis6
  • 6.10 Feasibility Study Conclusion6
  • 6.11 Annexes, Figures and Schedules6
  • 7 Preliminary Design Documents7
  • 7.1 General requirements7
  • 7.2 General description of preliminary design7
  • 7.3 Adjustments to the Feasibility Study Report8
  • 7.4 Project Design Documents8
  • 7.5 Project Implementation Progress13
  • 7.6 Project budget13
  • 7.7 Annexes and Figures13
  • 8 Construction drawing design documents14
  • 8.1 General requirements14
  • 8.2 General description of construction drawing design14
  • 8.3 Figure14
  • 8.4 Project Design Documents14
  • 8.5 Equipment and main materials Table18
  • 8.6 Calculation sheet18
  • 8.7 Project Budget19
  • 8.8 Annexes and Figures19
  • 9 Special design documents1920
  • 9.1 Intelligent Equipment and Production Lines1920
  • 9.2 Internet of Things System20
  • 9.3 Factory Simulation Model20
  • 9.4 Equipment and facility codes21
  • Reference22

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting.

This document is part 4 of GB/T 43064 "Guidelines for the Construction of Intelligent Factories". GB/T 43064 has been published in the following parts.

— Part 1: Physical factory intelligent system;

— Part 2: Virtual factory construction;

— Part 4: Preparation of smart factory design documentation.

Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.

This document is proposed and coordinated by the Ministry of Industry and Information Technology of the People's Republic of China.

This document was drafted by: China Machinery Industry Sixth Design and Research Institute Co., Ltd., China National Machinery Industry Internet Research Institute (Henan) Co., Ltd., China Electronics Technology Standardization Institute, China Aviation Comprehensive Technology Research Institute, China Textile Machinery Association, Building Materials Industry Information Center, China National Machinery Industry Corporation Group Science and Technology Research Institute Co., Ltd., Beijing Machinery Industry Automation Research Institute, Beijing Machinery Industry Electrical Technology and Economic Research Institute, Machinery Industrial Instrumentation and Metering Technology and Economic Research Institute, Beijing University of Science and Technology, Henan Institute of Engineering, China National Machinery Industry Corporation, China Control System Engineering Co., Ltd., SINOMACH Intelligent Technology Co., Ltd., SINOMACH Intelligent Technology Research Institute Co., Ltd., COSCO Shipping Ship Equipment Co., Ltd.

Accessories Co., Ltd., China Shipbuilding Industry Corporation 716th Research Institute, Shanghai Electric Science Research Institute (Group) Co., Ltd., Sanquan Food Products Co., Ltd., China Merchants Jinling Shipbuilding (Nanjing) Co., Ltd., CRRC Luoyang Locomotive Co., Ltd., Xinxiang Aviation Industry (Group) Co., Ltd.

Company, Ningbo Fotile Kitchenware Co., Ltd., Zhengzhou Abrasives and Grinding Tools Research Institute Co., Ltd., Hunan China Tobacco Industry Co., Ltd., Fujian Yu Energy Electric Power Equipment Co., Ltd., Hexagon Manufacturing Intelligent Technology (Qingdao) Co., Ltd., Do-Fluoride New Energy Technology Co., Ltd., Xinxiang Great Wall Machinery Co., Ltd.

The main drafters of this document are: Zhu Kaizhen, Liu Ying, Guan Juntao, Miao Faxiang, He Honghong, Cheng Yuhang, You Bing, Xu Bin, Chen Lei, Ma Yingzheng, Wang Linjun, Liu Lisha, Yang Qiulin, Zhang Baogang, Ning Dong, He Tisheng, Liu Jie, Liao Shenglan, Miao Jianjun, Hou Xi, Jiang Yuan, Xie Bingbing, Wei Sha, Wang Linkun, Wang Kun, Zhang Dezheng, Lü Peng, Ji Xuecheng, Dai Weiwei, Jiang Qian, Zhu Xuexin, Wang Zhaojie, Gao Yunpeng, Xu Qiang, Zhang Jianshe, Zhao Anzhong, Shi Chao, Li Hongkai, Ju Changjiang, Hao Xuan, Yan Ning, Zhang Song, Sun Dongchen, Wang Tao, Jin Ting, Chen Shengxian, Sun Xiaobing, Yu Qun, He Ran, Tang Yuanyuan, Wang Jizhong, Xu Fei.

Introduction

In order to guide the construction of smart factories in a systematic manner according to scientific methods and rules, and guide enterprises to Gradually develop towards high-level smart factories, thereby promoting the transformation and upgrading of manufacturing enterprises, and formulate GB/T 43064 "Guidelines for the Construction of Smart Factories" GB/T 43064 is intended to solve the common problems encountered by enterprises in the process of building smart factories. It is planned to consist of four parts.

— Part 1: Physical factory intelligent system. The purpose is to specify the construction and application requirements of the physical factory intelligent system.

— Part 2: Virtual factory construction. The purpose is to standardize and guide the creation and application of virtual factory models required for smart factory construction.

To improve the construction quality and application value of virtual factories.

— Part 3: Requirements for integration of virtual factories and physical factories. The purpose is to specify the requirements for integration of virtual factories and physical factories in the construction of smart factories.

The overall framework and technical architecture of the factory integration, and the integration content, data standards, integration interfaces, system implementation, system operation, etc. Provide technical guidance.

— Part 4: Preparation of smart factory design documents. The purpose is to standardize the construction, reconstruction, expansion and technical Preparation of design documents in the design of technological transformation projects.

Guidelines for building smart factories Part 4: Preparation of smart factory design documentation

1 Scope

This document specifies the content and requirements for document preparation at each design stage of smart factory construction projects.

This document is applicable to the preparation of design documents for new construction, renovation, expansion and technological transformation projects of smart factories.

2 Normative references

GB/T 43064.2-2024

GB/T 50848

GB/T 51362-2019

3 Terms and definitions

The following terms and definitions apply to this document.

3.1 physical plant

A general term for physical factories consisting of production equipment, public infrastructure and information infrastructure.

[Source. GB/T 43064.1-2023, 3.1]

3.2 Virtual Plant

A modeling platform or tool that maps the physical factory and has the functions of simulating, managing and controlling the key elements of the physical factory.

[Source. GB/T 40648-2021, 3.1, modified]

4 Abbreviations

The following abbreviations apply to this document. IP. Internet Protocol

5 General requirements

The design work of smart factory construction projects can be divided into four stages. feasibility study, preliminary design, construction drawing design, and special design.

The design documents of each stage should be based on the traditional factory design content, and add relevant information about the intelligent system of physical factory, virtual factory, virtual factory, etc.

The relevant design documents for the integration of the plant and the physical plant should include the process, information infrastructure, Internet of Things system, information application system, Civil engineering and public infrastructure, factory information model, factory simulation model, virtual-real integration system, etc. The overall requirements are as follows.

a) The design documents for each stage of the smart factory construction project should be the necessary input documents of the design content and requirements of the previous stage, and

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 24 pages — is available in the English PDF.

Referenced standards

Editions of GB/T 43064.4

EditionTitleRevisionStatus
GB/T 43064.4-2024Guidelines for intelligent plants construction - Part 4: Design documents for intelligent plantcurrent editionCurrent

This page sells the current edition, GB/T 43064.4-2024. Earlier editions are listed for reference only.

How to Buy GB/T 43064.4-2024

  1. 1Add to cart. Click the "Buy GB/T 43064.4-2024" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
24 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 43064.4-2024

$425.00

$360.00for partners