GB/T 42749.4-2023Information technology - IT Enabled Services - Business Process Outsourcing(ITES-BPO) lifecycle processes - Part 4: Terms and concepts (English PDF)
信息技术 IT赋能服务业务过程外包(ITES-BPO)生存周期过程 第4部分:术语和概念
This is a limited preview
Buy now to download the full PDF (19 pages)
Need quotation for your management?
Get a formal quotation for GB/T 42749.4-2023 in 30 minutes.
Issued by
State Administration for Market Regulation, China National Standardization Administration
Level / Type
National · Recommended
Issue date
May 23, 2023
Implementation date
December 1, 2023
Scope
GB/T 42749.4-2023 is the English-translated version of 信息技术 IT赋能服务业务过程外包(ITES-BPO)生存周期过程 第4部分:术语和概念.
This document defines the terms and concepts used across GB/T 42749, establishes the ITES-BPO life cycle and sets out how the several parts of GB/T 42749 relate to one another and to the other relevant standards.
The document is intended to let a service provider see all the similar and related processes that keep service integrity within the ITES-BPO life cycle, and so to apply the other parts of GB/T 42749.
It is the fourth part of the standard on IT enabled services and business process outsourcing life cycle processes.
Found what you need?
Document preview — GB/T 42749.4-2023
National Standard of the People's Republic of China
- ICS
- 35.080
- Classification
- L 77
Issued by: State Administration for Market Regulation, China National Standardization Administration
Contents
- Preface
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 Abbreviations
- 5 concept
- 6 Relationship to International Standards
- Reference
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules for Standardization Documents" drafting.
This document is part 4 of GB/T 42749 "Information Technology IT Enablement Service Business Process Outsourcing (ITES-BPO) Life Cycle Process" part. GB/T 42749 has issued the following parts.
--- Part 1. Process Reference Model (PRM);
--- Part 2. Process Assessment Model (PAM);
--- Part 3. Measurement Framework (MF) and Organizational Maturity Model (OMM);
--- Part 4. Terms and concepts;
--- Part 5. Guidelines.
This document is modified to adopt ISO /IEC 30105-4:2022 "Information Technology IT Enablement Service Business Process Outsourcing (ITES-BPO) Survival Cycle Process Part 4. Key Concepts.
Compared with ISO /IEC 30105-4:2022, this document has made the following structural adjustments.
---Chapter 3 corresponds to 3.1 in ISO /IEC 30105-4:2022;
---Chapter 4 corresponds to 3.2 in ISO /IEC 30105-4:2022;
--- Chapter 5 corresponds to Chapter 4 of ISO /IEC 30105-4:2022;
--- Chapter 6 corresponds to Chapter 5 of ISO /IEC 30105-4:2022.
The technical differences between this document and ISO /IEC 30105-4:2022 and their reasons are as follows:
--- Added the term assessed capability, assessment input, assessment output, assessment record, basic practice, basic process group, contract management, corrective Positive, Corrective Action, Extended Process Group, Generic Practices, Generic Resources, Knowledge Transfer, Organizational Process Maturity, Organizational Units, Piloting Project, process capability gap assessment, process improvement, root cause analysis, tailoring guidelines (see 3.1, 3.3, 3.4, 3.5, 3.6, 3.7, 3.11, 3.12, 3.13, 3.15, 3.16, 3.17, 3.20, 3.24, 3.25, 3.27, 3.34, 3.37, 3.42, 3.46), in order to be compatible with GB/T 42749 Other parts are used together;
--- Added abbreviations BCM, GWP, IT, KPI, KT, WP (see Chapter 4) for allocation with other parts of GB/T 42749 set use;
---Change the information entry and general information entry to work output and general work output (see 5.3.2) respectively, so as to be compatible with GB/T 42749 Other parts are used together;
---Changed the name of the process capability level PA2.2, deleted the process capability level PA3.3, and added the process capability level PA5.2 (see Figure 6 and Table 3) for supporting use with other parts of GB/T 42749. The following editorial changes have been made to this document.
---In order to coordinate with relevant standards and clarify the content of this document, the name of the standard is changed to "Information Technology IT Enablement Service Business Process Outsourcing (ITES-BPO) Life Cycle Process Part 4. Terms and Concepts";
---Moved the relationship diagram between the various parts of the standard to the introduction.
Introduction
ITES-BPO services include the business outsourcing process of assigning one or more IT enabling services to the service provider, and the service provider communicates with Provide services with appropriate technology. The service provider is responsible for managing, delivering, improving and executing outsourced services according to predetermined measurable performance indicators business process. ITES-BPO services can cover diverse business processes, such as finance, personnel management, administrative management, medical care, banking and financial services, supply chain management, hospitality and tourism, media, market research, data analysis, telecommunications, production and processing, etc. These services will Provide business solutions to customers around the world and form an integral part of the customer's core service delivery chain.
GB/T 42749 specifies the requirements for the life cycle process in the ITES-BPO service industry.
---From the perspective of service providers who perform ITES-BPO services for customers, it provides information applicable to all parties in the ITES-BPO service industry This standard applies to any service provider who provides ITES-BPO services to clients under contract in different industries.
--- Covers the entire life cycle of ITES-BPO services, and clarifies the process of good practice.
---Improvement standard, the service provider who implements ITES-BPO service can conduct process capability gap assessment and Improve.
---Universal standard, applicable to all types and properties of ITES-BPO services.
--- Bring clear return on investment to customers and service providers.
--- Improve the consistency, quality and predictability of service delivery.
The main institutions involved in ITES-BPO services and their relationships are shown in Figure 1, including customers, service providers and suppliers at all levels business. This is basically consistent with the supply chain relationship described in 8.3 of ISO /IEC 20000-1:2018.
See Figure 2 for the description of the relationship between the various parts of GB/T 42749.
GB/T 42749.1-2023 provides a process reference model, the purpose is to define a set of processes and their process objectives and process results. Pass The program objectives detail the results of a successful implementation process and deliver a return on investment for stakeholders. Process outcomes are observable results of implementation The results are matched with the business benefits obtained by customers and service providers.
GB/T 42749.2-2023 provides an example model for performing process assessment, which is referenced to the process in GB/T 42749.1-2023 model is based on and directly compatible with. The process dimension is provided through the GB/T 42749.1-2023 external process reference model.
The capability model of GB/T 42749.2-2023 is based on the process capability measurement framework defined in GB/T 42749.3-2023. through the adoption process A complete index set of performance and process capability, which extends the ITES-BPO process reference model and process capability measurement framework.
GB/T 42749.3-2023 defines the process capability measurement framework and organizational maturity model, which is used to evaluate process capability level and organizational composition The maturity level clarifies the assessment method, which is helpful for organizations to use the model for process capability level and organizational maturity level assessment. Provide guidelines to help users understand and apply GB/T 42749.
GB/T 42749.5-2023 provides guidance for the use of GB/T 42749, and also provides guidance for process capability gap assessment. Assists organizations in process capability gap assessment and process improvement.
GB/T 42749 specifies the process requirements for the service provider to implement the ITES-BPO life cycle. It defines the planning, establishing, implementing The process of implementing, operating, monitoring, reviewing, maintaining and improving its services.
1 Scope
This document defines the terms and concepts of GB/T 42749, establishes the ITES-BPO life cycle and the various parts of GB/T 42749 Relationship to other relevant standards.
This document is applicable for the service provider to understand all similar and related processes for ensuring service integrity within the ITES-BPO life cycle.
This process helps the service provider to apply various parts of GB/T 42749.
2 Normative references
This document has no normative references.
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1 Assessed capabilities
According to the requirements of GB/T 42749, the output after one or more relevant process evaluations.
3.2 Assessment indicator
Objective evidence and parameters used to support evaluators in evaluating the capability characteristics of the measurement process.
NOTE Examples include work outputs, practices or resources. [Source: ISO /IEC 33001:2015, 3.3.1, with modifications]
3.3 Assessment input
Information required prior to process evaluation. [Source: ISO /IEC 33001:2015, 3.2.3, with modifications]
3.4 Assessment output
evaluation result.
NOTE: See assessment records (3.5). [Source: ISO /IEC 33001:2015, 3.2.4, with modifications]
3.5 Assessment record
Information used by evaluators during evaluation activities to understand and validate evaluation results. [Source: ISO /IEC 33001:2015, 3.2.7, with modifications]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 19 pages — is available in the English PDF.
Referenced standards
Cited by
- GB/Z 42749.6-2025Information technology - IT Enabled Services-Business Process Outsourcing (ITES-BPO) lifecycle processes - Part 6: Guidelines on risk management
- GB/Z 42749.7-2025Information technology - IT Enabled Services-Business Process Outsourcing (ITES-BPO) lifecycle processes - Part 7: Exemplar for maturity assessment
- GB/T 42749.1-2023Information technology - IT Enabled Services-Business Process Outsourcing (ITES-BPO) lifecycle processes - Part 1: Process reference model (PRM)
- GB/T 42749.2-2023Information technology - IT Enabled Services - Business Process Outsourcing(ITES-BPO) lifecycle processes - Part 2: Process assessment model(PAM)
How to Download GB/T 42749.4-2023
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 42749.5-2023 — Information technology - IT Enabled Services - Business Process Outsourcing(ITES-BPO) lifecycle processes - Part 5: Guidelines
GB/T 42749.3-2023 — Information technology - IT Enabled Services - Business Process Outsourcing(ITES-BPO) lifecycle processes - Part 3: Measurement framework (MF) and organization maturity model (OMM)
GB/T 42749.2-2023 — Information technology - IT Enabled Services - Business Process Outsourcing(ITES-BPO) lifecycle processes - Part 2: Process assessment model(PAM)
Secure payment via Stripe
Payments accepted
GB/T 42749.4-2023
$420.00