GB/T 41771.13-2025Field device integration - Part 13: Profiles - HART and WirelessHART (English PDF)
现场设备集成 第13部分:行规 HART和WirelessHART
This is a limited preview
Buy now to download the full PDF (39 pages)
Need quotation for your management?
Get a formal quotation for GB/T 41771.13-2025 in 30 minutes.
Issued by
State Administration for Market Regulation
Level / Type
National · Recommended
Issue date
October 31, 2025
Implementation date
May 1, 2026
Scope
GB/T 41771.13-2025 is the English-translated version of 现场设备集成 第13部分:行规 HART和WirelessHART.
GB/T 41771.13-2025 — This document specifies IEC 62769 for IEC 61784-1_CP9/1 HART and IEC 61784-1_CP9/2 Wire-lessHART's FDI industry practices.
Found what you need?
Document preview — GB/T 41771.13-2025
National Standard of the People's Republic of China
- ICS
- 25.040
- Classification
- N 10
Issued by: State Administration for Market Regulation
Contents
- Preface
- Introduction
- 1 Scope
- 2 Normative References
- 3 Terms, Definitions, and Abbreviations
- 3.1 Terms and Definitions
- 3.2 Abbreviations
- 4 Agreement
- 4.1 EDDL Syntax
- 4.2 XML Syntax
- 4.3 Uppercase
- 5 CP9/1 (HART) or CP9/2 (WirelessHART) Industry Standards
- 5.1 General Rules
- 5.2 Table of Contents Rules
- 5.3 Associate the package with the CP9/1 device
- 5.4 Information Model Mapping
- 5.5 Topological Elements
- 5.6 Method
- Appendix A (Normative) Topology Scan Mode
- A.1 General Rule
- A.2 IdentificationType
- A.3 AddressTypeTP
- A.4 AddressTypeIP
- A.5 AddressType TDMA
- A.6 AddressType
- A.7 ConnectionPointType
- A.8 NetworkType
- A.9 Network
- Appendix B (Normative) Transmission Service Parameters
- B.1 General Rule
- B.2 receiveData
- B.3 sendData
- B.4 TransferResultDataT
- B.5 TransferSendDataT
- Appendix C (Informative) Mapped to PADIM
- C.1 Overview
- C.2 Mapping Table
- References
Foreword
This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1: Structure and Drafting Rules of Standardization Documents".
Drafting.
This document is Part 13 of GB/T 41771 "Field Device Integration". GB/T 41771 has already published the following parts.
---Part 1: Overview;
---Part 2: Client;
---Part 3: Servers;
---Part 4: Package;
---Part 5: Information Model;
---Part 6: Technology Mapping;
---Part 7: Communication Equipment;
---Part 9: Industry Standards Foundation Fieldbus H1;
---Part 10: Industry Standards Foundation Fieldbus HSE;
---Part 11: PROFIBUS (Industry Standards)
---Part 12: PROFINET;
---Part 13: Industry Standards HART and WirelessHART.
This document is equivalent to IEC 62769-109-1:2023 "Field device integration (FDI) - Part 109-1.Industry standard HART and..." WirelessHART.
The following minimal editorial changes have been made to this document.
---To align with existing standards, the standard name has been changed to "Field Device Integration Part 13: Industry Standards for HART and Wire-lessHART.
Please note that some content in this document may involve patents. The issuing organization of this document assumes no responsibility for identifying patents.
This document was proposed by the China Machinery Industry Federation.
This document is under the jurisdiction of the National Technical Committee on Standardization of Industrial Process Measurement, Control and Automation (SAC/TC124).
Introduction
The field device integration series of standards are important technical standards guiding industrial process measurement and control activities. GB/T 41771 aims to...
The established guidelines for equipment integration will consist of 15 parts.
---Part 1: Overview. The purpose is to define and provide an overview of the field equipment integration specifications.
---Part 2: Client-Side. This section specifies the requirements for integrating clients into field devices.
---Part 3: Servers. This section specifies the requirements for integrating servers into field devices.
---Part 4: Packages. The purpose is to build a field device integration package model, providing a way to integrate devices, network components, and communication servers.
To obtain all the elements required by the system.
---Part 5: Information Model. The purpose is to define the topology of an automation system, used to describe the equipment and communication of that system.
Trust network connection.
---Part 6: Technology Mapping. The purpose is to define the technology mapping for concepts described in field device integration;
---Part 7: Communication Equipment. The purpose is to define the elements that enable communication capabilities.
---Part 8: Industry-Specific General Protocols. The purpose is to define the communication servers, gateways, and devices described in the field equipment integration package.
Detailed information on the required general protocol.
---Part 9: Industry Standards Foundation Fieldbus H1.The purpose is to define the field device integration communication of the H1 fieldbus technology.
Industry rules.
---Part 10: Industry Standards Foundation Fieldbus HSE. The purpose is to define the field device integration of HSE fieldbus technology.
Telecommunications industry regulations.
---Part 11: PROFIBUS Standards. The purpose is to define standard practices for field device integrated communication using PROFIBUS technology.
---Part 12: PROFINET. The purpose is to define the field device integration communication standards for PROFINET technology.
---Part 13: Industry Standards for HART and WirelessHART. The purpose is to define HART and WirelessHART technologies.
The field equipment integrated communication industry standard.
---Part 14: Industry Standards for Modbus-RTU. The purpose is to define the field device integrated communication specifications for Modbus-RTU technology.
Industry rules.
---Part 15: Industry Standard ISA100.The purpose is to define the industry standard for field device integrated communication using ISA100 technology.
Field Equipment Integration Part 13.
Industry-standard HART and WirelessHART
1 Scope
This document specifies IEC 62769 for IEC 61784-1_CP9/1 HART and IEC 61784-1_CP9/2 Wire-lessHART's FDI industry practices.
2 Normative references
The contents of the following documents, through normative references within the text, constitute essential provisions of this document. Dated citations are not included.
For references to documents, only the version corresponding to that date applies to this document; for undated references, the latest version (including all amendments) applies.
This document.
100.Devices interface) FDIpackages] Note. GB/T 41771.4-2022 Field device integration - Part 4: Packages (IEC 62769-4:2021, IDT) Informationmodel] Note. GB/T 41771.5-2022 Field device integration - Part 5: Information model (IEC 62769-5:2021, IDT) Note. GB/T 41771.7-2023 Field device integration - Part 7: Communication equipment (IEC 62769-7:2023, IDT)
3 Terms, Definitions and Abbreviations
3.1 Terms and Definitions
The terms and definitions defined in IEC 62541-100, IEC 62769-4, IEC 62769-5 and IEC 62769-7 apply to this document.
The URLs for the terminology databases maintained by ISO and IEC for standardization are as follows.
3.2 Abbreviations
The following abbreviations apply to this document.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 39 pages — is available in the English PDF.
Referenced standards
How to Download GB/T 41771.13-2025
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 41771.4-2022 — Field device integration - Part 4: Package
GB/T 41771.5-2022 — Field device integration - Part 5: Information model
GB/T 41771.7-2023 — Field device integration - Part 7: Communication devices
Secure payment via Stripe
Payments accepted
GB/T 41771.13-2025
$635.00