GB/T 33588.6-2025Lightning protection system components(LPSC) - Part 6: Requirements for lightning strike counters(LSCs) (English PDF)
雷电防护系统部件(LPSC) 第6部分:雷击计数器(LSCs)的要求
This is a limited preview
Buy now to download the full PDF (17 pages)
Need quotation for your management?
Get a formal quotation for GB/T 33588.6-2025 in 30 minutes.
Issued by
State Administration for Market Regulation, China National Standardization Administration
Level / Type
National · Recommended
Issue date
April 25, 2025
Implementation date
November 1, 2025
Scope
GB/T 33588.6-2025 is the English-translated version of 雷电防护系统部件(LPSC) 第6部分:雷击计数器(LSCs)的要求.
GB/T 33588.6-2025 — This document specifies the requirements for lightning strike counters and describes the corresponding test methods. Lightning strike counters are based on the lightning current flowing in the conductor.
To record the number of lightning strikes, this type of conductor is used to conduct only part of the lightning current, including some conductors of the lightning protection system (LPS), Conductors of surge protectors (SPDs) or other conductors.
LSCs used in hazardous environments must take additional requirements into consideration. Note. In EU countries, see CLC/T S50703-2 for component test requirements for use in explosive environments.
Found what you need?
Document preview — GB/T 33588.6-2025
National Standard of the People's Republic of China
- ICS
- 91.120.40
- Classification
- K 10
- Replacing
- GB/T 33588.6-2020
Issued by: State Administration for Market Regulation, China National Standardization Administration
Contents
- Preface
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 Categories
- 5 Requirements
- 6 Test methods
- 7 Electromagnetic Compatibility (EMC)
- 8 Structure and content of test reports
- Appendix A (Normative) Environmental impact test of LSCs - UV resistance test
- Appendix B (Normative) Environmental impact test of LSCs-Corrosion resistance test
- Appendix C (Normative) Test Flowchart for LSCs
- Appendix D (Normative) Applicability of tests performed according to previous versions
- Reference
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting.
This document is Part 6 of GB/T 33588 Lightning Protection System Components (LPSC). GB/T 33588 has been published as follows part.
--- Part 1: Requirements for connectors;
--- Part 2: Requirements for lightning arresters, down conductors and grounding electrodes;
--- Part 3: Requirements for isolating spark gaps (ISGs);
--- Part 4: Requirements for conductor fasteners;
--- Part 5: Requirements for grounding electrode test boxes and grounding electrode seals;
--- Part 6: Requirements for lightning strike counters (LSCs);
--- Part 7: Requirements for grounding resistance reduction materials;
--- Part 8: Requirements for isolation components of lightning protection systems.
This document replaces GB/T 33588.6-2020 "Lightning protection system components (LPSC) Part 6: Requirements for lightning strike counters (LSC) Compared with GB/T 33588.6-2020, in addition to structural adjustments and editorial changes, the main technical changes are as follows.
a) Added the terms "impact current" and "surge" and their definitions (see 3.13, 3.14);
b) The classification of lightning strike counters has been changed (see Chapter 4, Chapter 4 of the 2020 edition);
c) Added test requirements for the applicability of tests performed in previous versions (see 6.1);
d) Added test methods for documents and installation instructions (see 6.2);
e) The identification test has been changed (see 6.3, 6.7 of the 2020 edition);
f) The requirements for corrosion resistance test (metal parts) have been changed (see 6.5, 6.3 of the 2020 edition);
g) The figure of "Pendulum impact test device" was deleted (see Figure 1 of the 2020 edition);
h) Added the normative appendix "Applicability of tests performed according to previous versions" (see Appendix D).
This document is equivalent to IEC 62561-6:2023 "Lightning protection system components (LPSC) Part 6: Lightning stroke counters (LSCs) Require".
The following minimal editorial changes were made to this document.
--- Notes were added in 6.1 to facilitate understanding and application;
---Correct "after the test in 5.3.2" in 6.3.2 to "after the test in 6.3.1".
Introduction
GB/T 33588 "Lightning protection system components (LPSC)" aims to establish the lightning protection system components designed and installed according to the IEC 62305 series of standards.
The requirements and test methods for various components used in the life protection system (LPS) are intended to consist of eight parts.
--- Part 1: Requirements for connectors. The purpose is to establish the requirements and test methods for metal connectors in lightning protection systems.
--- Part 2: Requirements for lightning terminals, down conductors and grounding electrodes. The purpose is to establish the requirements for the metallic conductors that constitute lightning terminals and down conductors.
Requirements and test methods for metal grounding electrodes (non-"natural" conductors) and metal grounding electrodes that constitute the grounding system.
--- Part 3: Requirements for Isolating Spark Gaps (ISGs). The purpose is to establish the requirements for isolating spark gaps in lightning protection systems and test methods.
--- Part 4: Requirements for conductor fasteners. The purpose is to establish the metal fasteners used to fix and support air terminals, down conductors and grounding devices.
Requirements and test methods for fasteners for metal and non-metallic conductors.
--- Part 5: Requirements for grounding electrode detection boxes and grounding electrode seals. The purpose is to establish grounding electrode detection boxes installed underground Requirements and test methods for terminal boxes and earthing electrode seals.
--- Part 6: Requirements for lightning strike counters (LSCs). The purpose is to establish the requirements and test methods for lightning strike counters.
--- Part 7: Requirements for grounding resistance reduction materials. The purpose is to establish the requirements and tests for grounding resistance reduction materials in lightning protection systems method.
--- Part 8: Requirements for isolation components of lightning protection systems. The purpose is to establish the requirements for insulation supports and insulation down conductors and their special tight Requirements and test methods for firmware.
Lightning Protection System Components (LPSC) Part 6: Requirements for lightning strike counters (LSCs)
1 Scope
This document specifies the requirements for lightning strike counters and describes the corresponding test methods. Lightning strike counters are based on the lightning current flowing in the conductor.
To record the number of lightning strikes, this type of conductor is used to conduct only part of the lightning current, including some conductors of the lightning protection system (LPS), Conductors of surge protectors (SPDs) or other conductors.
LSCs used in hazardous environments must take additional requirements into consideration.
Note. In EU countries, see CLC/T S50703-2 for component test requirements for use in explosive environments.
2 Normative references
The contents of the following documents constitute essential clauses of this document through normative references in this document.
For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to this document.
GB/T 2423.18-2021 Environmental testing Part 2: Test methods Test Kb. Salt spray, alternating (sodium chloride solution) (IEC 60068-2-52:2017, IDT) GB/T 2423.55-2023 Environmental testing Part 2: Test methods Test Eh. Hammer test (IEC 60068-2-75.
2014, IDT)
GB/T 16422.2-2022 Plastics laboratory light source exposure test method Part 2: Xenon arc lamp (ISO 4892-2:2013, IDT) GB/T 16422.3-2022 Plastics laboratory light source exposure test method Part 3: Fluorescent ultraviolet lamp (ISO 4892-3.
2016, IDT)
GB/T 16422.4-2022 Plastics laboratory light source exposure test method Part 4: Open carbon arc lamp (ISO 4892-4.
2013, IDT)
rosionresistance)
ISO 22479:2019 Corrosion of metals and alloys - Sulfur dioxide in humid air (fixed gas method) Note. GB/T 4208-2017 Enclosure Protection Degrees (IP Code) (IEC 60529:2013, IDT) IEC 61000-6-2 Electromagnetic compatibility (EMC) Part 6-2.Generic standard Immunity standard for industrial environments [Electro-ronments] Note. GB/T 17799.2-2023 General standard for electromagnetic compatibility Part 2: Immunity standard for industrial environments (IEC 61000-6-2:2016, MOD) IEC 61000-6-4 Electromagnetic compatibility (EMC) Part 6-4.Generic standards for emissions in industrial environments Note. GB 17799.4-2022 General standard for electromagnetic compatibility Part 4: Emission in industrial environments (IEC 61000-6-4:2018, IDT)
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 17 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 2423.18-2021Environmental testing - Part 2: Test methods - Test Kb: Salt mist, cyclic (sodium chloride solution)
- GB/T 2423.55-2023Environmental testing - Part 2: Test methods - Test Eh: Hammer tests
- GB/T 16422.2-2022Plastics - Methods of exposure to laboratory light sources - Part 2: Xenon-arc lamps
- GB/T 16422.3-2022Plastics - Methods of exposure to laboratory light sources - Part 3: Fluorescent UV lamps
- GB/T 16422.4-2022Plastics - Methods of exposure to laboratory light sources - Part 4: Open-flame carbon-arc lamps
- GB/T 4208-2017Degrees of protection provided by enclosures (IP code)
IEC 60068 · ISO 4892 · ISO 22479 · IEC 60529 · IEC 61000
How to Download GB/T 33588.6-2025
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 17799.4-2022 — Electromagnetic compatibility (EMC) - Generic standards - Part 4: Emission for industrial environments
GB/T 16422.2-2022 — Plastics - Methods of exposure to laboratory light sources - Part 2: Xenon-arc lamps
GB/T 16422.3-2022 — Plastics - Methods of exposure to laboratory light sources - Part 3: Fluorescent UV lamps
Secure payment via Stripe
Payments accepted
GB/T 33588.6-2025
$360.00