Valid

GB/T 33009.2-2016Industrial automation and control system security—Distributed control system(DCS)—Part 2: Management requirements (English PDF)

工业自动化和控制系统网络安全 集散控制系统(DCS) 第2部分:管理要求

Preview PDF

This is a limited preview

Buy now to download the full PDF (40 pages)

Need quotation for your management?

Get a formal quotation for GB/T 33009.2-2016 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

October 13, 2016

Implementation date

May 1, 2017

Scope

GB/T 33009.2-2016 is the English-translated version of 工业自动化和控制系统网络安全 集散控制系统(DCS) 第2部分:管理要求.

GB/T 33009.2-2016 is the Chinese standard "Industrial automation and control system security - Distributed control system (DCS) - Part 2: Management requirements".

Its scope clause reads: This part of GB/T 33009 specifies the specific requirements of the distributed control system network security management system and its related security management elements.

This part applies to the security management in the operation and maintenance process of the distributed control system. Its clauses include terms, definitions, abbreviations; dcs security management overview; dcs security management elements.

It was issued by the General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China Sta on OCTOBER 13, 2016 and took effect on MAY 01, 2017.

Found what you need?

Document preview — GB/T 33009.2-2016

National Standard of the People's Republic of China

ICS
25.040
Classification
N 10

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword3
  • 1 Scope5
  • 2 Normative references5
  • 3 Terms, definitions, abbreviations5
  • 3.1 Terms and definitions5
  • 3.2 Abbreviations9
  • 4 DCS security management overview9
  • 4.1 DCS system overview9
  • 4.2 DCS network security management system12
  • 5 DCS security management elements18
  • 5.1 Guidelines, strategies and procedures18
  • 5.2 Management organization19
  • 5.3 Asset management21
  • 5.4 Staff22
  • 5.5 Cryptography23
  • 5.6 Physical and environmental23
  • 5.7 Security control measures24
  • 5.8 Communication security32
  • 5.9 System operation and maintenance33
  • 5.10 Supplier relations35
  • 5.11 Information and document management36
  • 5.12 Business continuity planning37
  • 5.13 Security incident planning and response38
  • 5.14 Compliance39
  • References40

Foreword

GB/T 33009 "Industrial automation and control system security - Distributed control system (DCS)" and GB/T 33008 "Industrial automation and control system security - Programmable logic controller (PLC)" and other standards together constitute the industrial automation and control systems network security series standard.

GB/T 33009 "Industrial automation and control system security - Distributed control system (DCS)" is divided into 4 parts.

- Part 1. Protection requirements;

- Part 2. Management requirements;

- Part 3. Assessment guidelines;

- Part 4. Risk and vulnerability detection requirements.

This part is part 2 of GB/T 33009.

This part was drafted in accordance with the rules given GB/T 1.1-2009.

1 Scope

This part of GB/T 33009 specifies the specific requirements of the distributed control system network security management system and its related security management elements.

This part applies to the security management in the operation and maintenance process of the distributed control system.

2 Normative references

The following documents are essential to the application of this document. For the dated documents, only the versions with the dates indicated are applicable to this document; for the undated documents, only the latest version (including all the amendments) are applicable to this document.

GB/T 20984-2007 Information security technology - Risk assessment specification for information security

GB/T 22080-2008 Information technology - Security techniques - Information security management systems - Requirements

GB/T 30976.1-2014 Industrial control system security - Part 1: Assessment specification ISO/IEC 27002:2013 Information technology - Security techniques - Code of practice for information security controls

3 Terms, definitions, abbreviations

3.1 Terms and definitions

The terms and definitions as defined in GB/T 20984-2007 and GB/T 30976.1-2014 AND the following terms and definitions apply to this document. For ease

3.1.16 Vulnerability

Defects or weaknesses in system design, implementation, or operation and management, which can be exploited to compromise system integrity or security policies. [GB/T 30976.1-2014, Definition 3.1.1]

3.1.17 Asset

Anything that is valuable to the organization.

3.2 Abbreviations

The following abbreviations apply to this document.

DCS. Distributed Control System

DoS. Denial of Service

HSE. Health, Safety and Environmental Management System

SMS. Security Management System

MES. Manufacturing Execution System

PSM. Process Safety Management

4 DCS security management overview

4.1 DCS system overview

4.1.1 General DCS system application network structure

DCS system applications are usually a vertical hierarchical network structure, from top to bottom including process monitoring layer, field control layer and field equipment layer. Each layer is connected by a communication network, each equipment in each layer is communicated through a communication network of the same level. The typical network structure is as shown in Figure 1. This part mainly proposes requirements for security requirements of the […]

4.1.2.3 Security requirements DCS has

DCS is generally deployed in important production areas, the system does not allow security incidents.

4.1.2.4 Integrity requirements DCS has

integrity requirements, it does not allow unauthorized users or malicious programs to alter the information and data.

4.1.2.5 Stability requirements DCS has

Once the DCS works unstably, there will be a serious threat, resulting in a large number of unqualified products outflow, AND meanwhile it also exacerbates the loss of equipment.

4.1.2.6 High reliability requirements

DCS has reliability requirements. DCS can carry out the control function of its setting under the stipulated conditions for a long time, during which no shutdown is allowed, AND it shall have good durability and maintainability.

4.2 DCS network security management system

4.2.1 General requirements

The core of DCS network security management is to establish, maintain and improve the network security management system. Appropriate organization management system should be established in accordance with GB/T 22080-2008. This part aims to guide the DCS system related enterprises to understand the DCS network security management system establishment and operation process. In clause 5, the necessary management elements and specific requirements for the establishment and operation of the DCS network security management system are defined. The user shall choose to implement it combining the actual conditions of the specific DCS application.

The DCS information security management system is designed to guide enterprises or organizations to establish, implement, operate, monitor, review, maintain and improve the documented DCS information security management system (ISMS) within the framework or environment of the existing information security management system. DCS information security management system shall take into account the importance of assets, asset location, system functions, control targets and manufacturers and other factors, to perform zoning management of the control system.

a) Determine the scope and boundaries of DCS's ISMS based on characteristics of DCS business, organization structure, physical areas, value assets and technical means;

b) Determine the ISMS policies of DCS based on characteristics of DCS business, organization structure, physical areas, value assets and technical means. The ISMS policies of DCS shall.

1) Include the framework for setting the DCS network security objectives and the overall direction and principles for establishing DCS network security work;

2) Consider the requirements of DCS business and related laws and regulations, as well as the security obligations in the contract;

3) Set up DCS risk management framework and establish and maintain ISMS of DCS under the strategic risk management environment of the organization or enterprise;

4) Establish risk assessment criteria to determine the scope of acceptable risk;

5) Obtain approval and support from the organization or business manager.

c) Determine the DCS risk assessment methods.

1) Selecting a risk assessment methodology appropriate to DCS's ISMS, which is identified of business network security and laws and regulations, identifying and classifying risks based on the security threats, vulnerabilities, and consequences of DCS assets;

2) Establishing a set of index system for the ranking of DCS business processes and subsystems in terms of risk handling; establishing risk acceptance criteria to identify acceptable risk levels.

The risk assessment method chosen shall ensure that the risk assessment produces can produce comparable and reproducible results.

d) Identify DCS risks.

1) Create DCS network topology map, collect DCS asset information, identify the assets within the scope of ISMS and its principals;

Note: The person in charge identifies the individuals and entities that have obtained the approval from the manager and are responsible for generating, developing, maintaining, using, and securing the assets, not the asset owner. implemented in accordance with documented process flow and whether the selected control measures are deployed, whether they are effective, report the results to the managers for review, including.

a) Develop ISMS audit processes and methods;

b) Maintain the independence of audit staff; for the audit of a specific DCS system, the required audit staff capacity shall be consistent with the relevant provisions of enterprises or organizations;

c) Implement periodic ISMS audits to detect errors in process results, identify attempted and successful security breaches and incidents, ensure that the network security policies and procedures developed are properly implemented, and the network security objectives are met for DCS zoning;

d) Monitor ISMS best practices for DCS risk assessment and risk treatment from the organizational structure, technical, DCS business objectives and process flow, identified threats, external issues, etc., conduct regular DCS risk assessments and audit of residual risks and toleration risk; […]

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 40 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 33009.2-2016

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
40 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 33009.2-2016

$125.00