GB/T 29516-2013Manganese ores -- Determination of moisture content (English PDF)
This is a limited preview
Buy now to download the full PDF (12 pages)
Need quotation for your management?
Get a formal quotation for GB/T 29516-2013 in 30 minutes.
Issued by
General Administration of Quality Supervision, Inspection and Quarantine
Level / Type
National · Recommended
Issue date
May 9, 2013
Implementation date
February 1, 2014
Scope
GB/T 29516-2013 (Manganese ores -- Determination of moisture content) is available as an English-translated PDF.
GB/T 29516-2013 is the Chinese standard "Manganese ores -- Determination of moisture content". Its scope clause reads: This Standard specifies the determination method of moisture content of manganese ores.
This Standard is applicable to the determination of moisture content of natural manganese ores and processed manganese ores (including flotation or pellets). Its clauses include terms and definitions; calculation and result expression.
It was issued by the General Administration of Quality Supervision, Inspection and Quarantine on 2013-05-09 and took effect on 2014-02-01.
Found what you need?
Document preview — GB/T 29516-2013
National Standard of the People's Republic of China
- ICS
- 73.060.20
- Classification
- D 32
Issued by: General Administration of Quality Supervision, Inspection and Quarantine
Contents
- Foreword...3
- 1 Scope...4
- 2 Normative references...4
- 3 Terms and definitions...4
- 4 Method summary...5
- 5 Instruments and equipment...5
- 6 Sample and sample preparation...6
- 7 Steps...6
- 8 Calculation and result expression...7
- 9 Precision...9
- 10 Test report...9
- Annex A (normative) Test method for moisture content of sticky manganese10
- Annex B (normative) Calibration of sprayed water and/or rain...12
1 Scope
This Standard specifies the determination method of moisture content of manganese ores.
This Standard is applicable to the determination of moisture content of natural manganese ores and processed manganese ores (including flotation or pellets).
2 Normative references
The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies.
GB/T 2011, Method of sampling and sample preparation of manganese ores in bulk
3 Terms and definitions
For the purposes of this document, the following terms and definitions apply.
3.1 lot
A certain amount of manganese ores that are processed or produced under the same conditions.
3.2 consignment
A certain amount of manganese ores in one delivery. A consignment may consist of a lot, several lots or partial lots of manganese ores.
3.3 increment
7.2.3 Place the drying plan into the drying oven that has been pre-adjusted to
105°C. Dry at this temperature for not less than 4h.
7.2.4 Take out the drying pan. Immediately weigh. The weighing device shall use thermal insulation material to prevent the heat transfer of material.
7.2.5 Place the drying pan into the drying oven once again. Maintain 1h. Take it out to weigh and record.
7.2.6 Repeat the above steps till the weight is constant, that is, the difference between the two-weighings is less than 0.05% of the initial mass. After the repeated drying, the mass shall increase and the last weighing data before the last testing shall be used as the calculation data.
7.2.7 For the samples that are difficult to sieve, break, and divide due to excessive humidity or stickiness, it may pre-dry the sample till there is no difficulty in sample preparation (see Annex A).
7.2.8 The calibration of sprayed water and/or rain is conducted according to
Annex B.
8 Calculation and result expression
8.1 Calculation of moisture content of test portion
The moisture content wi is calculated according to formula (1), expressed in mass fraction (%). The result is expressed to two digits after the decimal place:
Where, m1 - Initial mass of test portion, in grams (g);
m2 - Dried mass of test portion, in grams (g).
8.2 Calculation of moisture content of consignment
8.2.1 When moisture is determined by gross sample, the moisture content of consignment shall be calculated according to formula (2). The result is expressed to one digit after the decimal place:
Annex A (normative)
Test method for moisture content of sticky manganese
When the sample is difficult to sieve, break or divide due to excessive humidity or stickiness, it may perform pre-drying. In such a situation, it shall conduct the moisture test according to the following pre-drying methods.
A.1 Weigh the initial mass of the test sample.
A.2 Tile the test sample to the uniform thickness. Place it in the air or place it in a drying oven of which the temperature is not greater than 105°C. The drying temperature and time shall not cause the sample to reabsorb moisture in the subsequent operations.
A.3 Weigh the dried manganese ore once again.
A.4 According to formula (A.1), calculate the pre-drying moisture content of the
test sample wp (%):
Where,
- Test sample mass before pre-drying, in kilograms (kg);
- Test sample mass after pre-drying, in kilograms (kg).
A.5 Record the pre-drying moisture content to the second digit after the decimal
place.
A.6 Prepare test portion from the pre-drying samples according to Clause 6.
A.7 Measure the weight loss of test portion. According to the method described
in Clause 7, then according to sub-clause 8.1, calculate the moisture content of test portion (mass fraction).
A.8 According to formula (A.2), calculate the total moisture content, wpd (%):
Annex B (normative)
Calibration of sprayed water and/or rain
B.1 Introduction
To prevent dust from polluting the environment, it needs to spray water on the ores during loading-unloading. Therefore, the moisture content of the consignment shall be calibrated according to the mass of sprayed water. The calibration procedures are in accordance with the provisions of this Annex.
This Annex is also applicable to the moisture content calibration of the consignment of manganese ores that are exposed in rain.
B.2 General rules
B.2.1 Sprayed water due to the following reasons:
a) The environmental regulations of loading/unloading ports have requirements for dust;
b) It is more convenient to spray water for reasons such as minerals, weather, or disposal equipment.
B.2.2 When the rain has a considerable effect on the moisture content of the consignment, it shall consider the rain calibration. But the corrected coefficient shall be agreed with the relevant stakeholders.
B.3 Calibration of sprayed water
B.3.1 Sprayed water
Sprayed water refers to the water that is added between the moisture determination and the determination of total mass of cargo.
B.3.2 Determination of sprayed water mass
It may use a flowmeter of which the accuracy is ±5% to determine the sprayed water mass. Multiply the determined volume by the density of the sprayed water and convert it to the mass m3 that is represented in t.
NOTE: The density of fresh water is assumed to be 1t/m3.
B.3.3 Mass of consignment
B.4.2 Effective area exposed to rain
The effective area exposed to rain shall be calculated according to the provisions of B.4.2.1~B.4.2.3 and rounded off to square meters.
B.4.2.1 Cargo compartment
The area calculation of cargo compartment exposed to rain shall be based on the cargo ship plan view provided by the ship owner.
B.4.2.2 Feed bin
The area calculation of feed bin exposed to rain shall be based on the feed bin plan view.
B.4.2.3 Belt transport
During belt transport, the calculation of the area exposed to rain shall multiply the effective width of the belt by the length of the exposed rain, that is, the distance from the container to the sampling point when the cargos are transported.
B.4.3 Rainfall duration
If the vessel uses a water gauge to weigh, the rainfall duration shall be from the beginning of the water gauge identification to the end of sampling.
B.4.4 Measurement method of rainwater
The measurement of rainwater shall use a certified rain gauge. During measurement, place it near the loading-unloading ores. The rainfall is expressed in millimeters (mm).
B.4.5 Mass of rain
The mass of rain is expressed in mR, in tons (t). Use formula (B.3) to calculate to an integer.
Where,
A - Raining effective area calculated according to B.4.2, in square meters (m2);
R - Rainfall measured according to B.4.4, in millimeters (mm);
rho - Rain density, in tons per cubic meter (t/m3); usually it is 1t/m3.
......
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 12 pages — is available in the English PDF.
Referenced standards
Normative references
How to Download GB/T 29516-2013
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 2011-1987 — Method of sampling and sample preparation of manganeseores in bulk
GB/T 20110-2006 — Hydraulic fluid power -- Cleanliness of parts and components -- Inspection document and principles related to contaminant collection, analysis and data reporting
GB/T 20111.1-2015 — Electrical insulation systems -- Procedures for thermal evaluation -- Part 1: General requirements -- Low-voltage
Secure payment via Stripe
Payments accepted
GB/T 29516-2013
$105.00