Valid

GB/T 28847.6-2023Building automation and control systems - Part 6: Data communication protocol conformance testing (English PDF)

Also coversGBT28847.6-2023

Open the GB/T 28847.6-2023 preview as PDF

Preview — first pages of GB/T 28847.6-2023

This is a limited preview

Buy now to download the full PDF

Issued by

State Administration for Market Regulation, China National Standardization Administration

Level / Type

National · Recommended

Issue date

March 17, 2023

Implementation date

October 1, 2023

Scope

GB/T 28847.6-2023 (Building automation and control systems - Part 6: Data communication protocol conformance testing) is available as an English-translated PDF.

GB/T 28847.6-2023 — This document specifies the content of the data communication protocol conformance test in the building automation and control system, including: protocol implementation conformance statement EPICS file rules, protocol implementation conformance statement EPICS test content, conformance test script language TCSL regulations, supported Supporting object function test, application service startup test, application service execution test, network layer protocol test, logical link layer protocol test, data According to link layer protocol test, special function test, IP function test and test result report, etc: This document is applicable to the conformance test of data communication protocols between devices in building automation and control systems:

Document preview — GB/T 28847.6-2023

National Standard of the People's Republic of China

ICS
35.240.50
Classification
L 67

Issued by: State Administration for Market Regulation, China National Standardization Administration

Contents

  • Preface
  • Introduction
  • 1 Scope1
  • 2 Normative references1
  • 3 Terms and Definitions1

foreword

This document is in accordance with the provisions of GB/T 1:1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules for Standardization Documents"

drafting:

This document is Part 6 of GB/T 28847 "Building Automation and Control Systems": GB/T 28847 has released the following parts:

--- Part 1: Overview;

--- Part 2: Hardware;

--- Part 3: Function;

--- Part 5: Data communication protocol;

--- Part 6: Data communication protocol conformance test:

This document was drafted with reference to ISO 16484-6:2014 "Building Automation and Control Systems Part 6: Data Communication Conformance Test":

The degree of consistency is not equivalent:

Introduction

GB/T 28847 "Building Automation and Control Systems" is proposed to be divided into seven parts:

--- Part 1: Overview;

--- Part 2: Hardware;

--- Part 3: Function;

--- Part 4: Application;

--- Part 5: Data communication protocol;

--- Part 6: Data communication protocol conformance test;

--- Part 7: Engineering realization:

This document is Part 6 of GB/T 28847 "Building Automation and Control Systems", which is used to verify the consistency of data communication protocols in Part 5

Whether the network layer protocol, logical link layer protocol, data link layer protocol, application service and other functions in the performance statement (PICS) can be implemented correctly, and

Realize the data communication and interconnection among the system management equipment, control equipment, on-site execution equipment, and network equipment hardware specified in Part 2:

Communication, meeting the information security and confidentiality, monitoring function, display function, operation function, redundancy function, control function, data

Management function, device management function, recording function, self-diagnosis function, communication function, integration function and other functions, etc:, and comply with Part 1

The overall requirements of the system overview can realize the analysis, classification, processing and judgment of various types of information collected, and the distributed monitoring of various equipment

Control and management, so that each subsystem and its equipment are always running in an orderly, coordinated, efficient and controlled state:

Building Automation and Control Systems

Part 6: Data communication protocol conformance test

1 Scope

This document specifies the content of the data communication protocol conformance test in the building automation and control system, including: protocol implementation conformance statement

EPICS file rules, protocol implementation conformance statement EPICS test content, conformance test script language TCSL regulations, supported

Supporting object function test, application service startup test, application service execution test, network layer protocol test, logical link layer protocol test, data

According to link layer protocol test, special function test, IP function test and test result report, etc:

This document is applicable to the conformance test of data communication protocols between devices in building automation and control systems:

2 Normative references

This document has no normative references:

3 Terms and Definitions

The following terms and definitions apply to this document:

3:1

local network localnetwork

A network to which BACnet devices are directly connected:

3:2

remotenetwork

A network of BACnet devices can only be accessed through one or more routers:

3:3

Test database testdatabase

A database of BACnet functions and objects created by reading the contents of EPICS:

4 Symbols and abbreviations

4:1 Symbols

The following symbols apply to this document:

C: Conditional

L: Data Link (Prefix) [DataLink (Prefix)]

M: Mandatory

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

How to Buy GB/T 28847.6-2023

  1. 1Add to cart. Click the "Buy GB/T 28847.6-2023" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 28847.6-2023

$11,990.00

$10,190.00for partners