GB/T 28847.6-2023Building automation and control systems - Part 6: Data communication protocol conformance testing (English PDF)
建筑自动化和控制系统 第6部分:数据通信协议一致性测试
This is a limited preview
Buy now to download the full PDF (1129 pages)
Need quotation for your management?
Get a formal quotation for GB/T 28847.6-2023 in 30 minutes.
Issued by
State Administration for Market Regulation, China National Standardization Administration
Level / Type
National · Recommended
Issue date
March 17, 2023
Implementation date
October 1, 2023
Scope
GB/T 28847.6-2023 is the English-translated version of 建筑自动化和控制系统 第6部分:数据通信协议一致性测试.
GB/T 28847.6-2023 — This document specifies the content of the data communication protocol conformance test in the building automation and control system, including: protocol implementation conformance statement EPICS file rules, protocol implementation conformance statement EPICS test content, conformance test script language TCSL regulations, supported Supporting object function test, application service startup test, application service execution test, network layer protocol test, logical link layer protocol test, data According to link layer protocol test, special function test, IP function test and test result report, etc: This document is applicable to the conformance test of data communication protocols between devices in building automation and control systems:
Found what you need?
Document preview — GB/T 28847.6-2023
National Standard of the People's Republic of China
- ICS
- 35.240.50
- Classification
- L 67
Issued by: State Administration for Market Regulation, China National Standardization Administration
Contents
- Preface
- Introduction
- 1 Scope1
- 2 Normative references1
- 3 Terms and Definitions1
foreword
This document is in accordance with the provisions of GB/T 1:1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules for Standardization Documents"
drafting:
This document is Part 6 of GB/T 28847 "Building Automation and Control Systems": GB/T 28847 has released the following parts:
--- Part 1: Overview;
--- Part 2: Hardware;
--- Part 3: Function;
--- Part 5: Data communication protocol;
--- Part 6: Data communication protocol conformance test:
This document was drafted with reference to ISO 16484-6:2014 "Building Automation and Control Systems Part 6: Data Communication Conformance Test":
The degree of consistency is not equivalent:
Introduction
GB/T 28847 "Building Automation and Control Systems" is proposed to be divided into seven parts:
--- Part 1: Overview;
--- Part 2: Hardware;
--- Part 3: Function;
--- Part 4: Application;
--- Part 5: Data communication protocol;
--- Part 6: Data communication protocol conformance test;
--- Part 7: Engineering realization:
This document is Part 6 of GB/T 28847 "Building Automation and Control Systems", which is used to verify the consistency of data communication protocols in Part 5
Whether the network layer protocol, logical link layer protocol, data link layer protocol, application service and other functions in the performance statement (PICS) can be implemented correctly, and
Realize the data communication and interconnection among the system management equipment, control equipment, on-site execution equipment, and network equipment hardware specified in Part 2:
Communication, meeting the information security and confidentiality, monitoring function, display function, operation function, redundancy function, control function, data
Management function, device management function, recording function, self-diagnosis function, communication function, integration function and other functions, etc:, and comply with Part 1
The overall requirements of the system overview can realize the analysis, classification, processing and judgment of various types of information collected, and the distributed monitoring of various equipment
Control and management, so that each subsystem and its equipment are always running in an orderly, coordinated, efficient and controlled state:
Building Automation and Control Systems
Part 6: Data communication protocol conformance test
1 Scope
This document specifies the content of the data communication protocol conformance test in the building automation and control system, including: protocol implementation conformance statement
EPICS file rules, protocol implementation conformance statement EPICS test content, conformance test script language TCSL regulations, supported
Supporting object function test, application service startup test, application service execution test, network layer protocol test, logical link layer protocol test, data
According to link layer protocol test, special function test, IP function test and test result report, etc:
This document is applicable to the conformance test of data communication protocols between devices in building automation and control systems:
2 Normative references
This document has no normative references:
3 Terms and Definitions
The following terms and definitions apply to this document:
3:1
local network localnetwork
A network to which BACnet devices are directly connected:
3:2
remotenetwork
A network of BACnet devices can only be accessed through one or more routers:
3:3
Test database testdatabase
A database of BACnet functions and objects created by reading the contents of EPICS:
4 Symbols and abbreviations
4:1 Symbols
The following symbols apply to this document:
C: Conditional
L: Data Link (Prefix) [DataLink (Prefix)]
M: Mandatory
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 1129 pages — is available in the English PDF.
How to Download GB/T 28847.6-2023
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 28847.5-2021 — Building automation and control systems - Part 5: Data communication protocol
GB/T 28847.3-2012 — Building automation and control systems -- Part 3: Function
GB/T 28847.2-2012 — Building automation and control systems -- Part 2: Hardware
Secure payment via Stripe
Payments accepted
GB/T 28847.6-2023
$11,900.00