Valid

GB/T 24563-2009Monitoring and testing for energy saving of coal gas generator (English PDF)

煤气发生炉节能监测

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 24563-2009 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

October 30, 2009

Implementation date

May 1, 2010

Scope

GB/T 24563-2009 is the English-translated version of 煤气发生炉节能监测.

GB/T 24563-2009 specifies the energy monitoring items, the monitoring methods and the assessment indicators for coal gas generators. Clause 1 applies it to atmospheric fixed bed gasifiers and states that it does not apply to gas generators used to produce chemical synthesis gas.

Clause 2 cites GB/T 4272 and GB/T 50195.

Clause 3 holds two definitions whose term names the draft does not print: fuel moving slowly down through the furnace so as to complete drying, pyrolysis, oxidation and reduction, usually carried out in a relatively stationary bed; and the mass of fuel gasified per hour per unit of cross-sectional area of the gas generator, in kilograms per square metre per hour.

Clause 4 splits the monitoring into check items and test items: the check items are that the generator body and its ancillary equipment be kept intact and that equipment and pipe insulation meet GB/T 4272, that the measuring instruments be fitted and reasonably chosen, in normal working order and within their test cycle, and that the fuel conform to the design requirements of the generator; the test items are gasification strength, the carbon content of the ash and the CO2 content of the gas.

Clause 5 then sets the monitoring method, requiring the test to be made while the generator is in normal production with stable thermal conditions, for not less than 2 h on a continuously producing generator and over one production cycle on an intermittently producing one, with instruments that meet the requirements of the monitoring programme, are intact and within their test cycle, and whose range, resolution and accuracy, the last not lower than 2.0, suit the measurement.

The draft breaks off there, so the assessment indicators announced in clause 1 are not shown, and the foreword records only that Appendix A is normative and that the standard falls under the national standardization technical committee for energy management. It was issued on 2009-10-30 and has applied since 2010-05-01.

Found what you need?

Document preview — GB/T 24563-2009

National Standard of the People's Republic of China

ICS
27.010
Classification
F 01

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 Gas furnace energy monitoring project
  • 5 Furnace gas energy monitoring method

Foreword

Appendix A of this standard is a normative appendix.

This standard by the National Standardization Technical Committee for Energy Management and focal points.

1 Scope

This standard specifies the gas furnace energy monitoring program, monitoring methods and assessment indicators.

This standard applies to atmospheric fixed bed gasifier.

This standard does not apply to the production of chemical synthesis gas used in gas furnace.

2 Normative references

The following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard.

GB/T 4272 General technical equipment and pipeline insulation

GB/T 50195 gas station design specifications

3 Terms and Definitions

The following terms and definitions apply to this standard.

3.1

Moving slowly down the fuel in the furnace, in order to complete drying, pyrolysis, oxidation and reduction. Usually in a relatively stationary bed is carried out.

3.2

Gas furnace unit cross-sectional area per hour, gasified fuel quality, in kilograms per square meter per hour [kg/(m2 . h)].

4 Gas furnace energy monitoring project

4.1 Check item

4.1.1 gas furnace body and ancillary equipment should be kept intact, equipment and pipe insulation should be consistent with GB/T 4272 requirements.

4.1.2 measuring instruments and instrument-equipped, reasonable, normal operation and in the test cycle.

4.1.3 should be consistent with the fuel gas furnace design requirements.

4.2 Test Project

4.2.1 gasification strength.

4.2.2 ash carbon content.

4.2.3 gas in the CO2 content.

5 Furnace gas energy monitoring method

5.1 Conditions and Monitoring time

Monitoring should be tested in gas furnace production under the normal state thermal conditions were stable. Gas furnace continuous production time is not detected Less than 2h, intermittent production of gas furnace should detect a production cycle.

5.2 Monitoring Instruments

Monitoring equipment should be used to meet the requirements of monitoring programs, equipment intact and in the test cycle, the measurement range and resolution shall be Adapt measurements with an accuracy not less than 2.0.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 24563-2009

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 24563-2009

$85.00