GB/T 20833.1-2021Rotating electrical machines - The winding insulation - Part 1: Off-line partial discharge measurements (English PDF)

Also coversGBT20833.1-2021

Open the GB/T 20833.1-2021 preview as PDF

Preview — first pages of GB/T 20833.1-2021

This is a limited preview

Buy now to download the full PDF

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

March 9, 2021

Implementation date

October 1, 2021

Scope

GB/T 20833.1-2021 (Rotating electrical machines - The winding insulation - Part 1: Off-line partial discharge measurements) is available as an English-translated PDF.

GB/T 20833.1-2021 — This Part of GB/T 20833 provides a common basis with respect to partial discharge off-line measurements on the winding insulation of rotating electrical machines: - measuring techniques and instruments; - the arrangement of test circuits; - normalization and testing procedures; - noise reduction; - the documentation of test results; - the interpretation of test results. The measurement methods described in this document are applicable to stator windings of machines with or without conductive slot coating and to the stator windings of machines made with form wound or random wound windings. In special cases like high voltage rotor field windings, this document is applicable as well. The measurement methods are applicable when testing with alternating sinusoidal voltages from 0.1 Hz up to 400 Hz; see Annex A. Interpretation guidelines are given in this document and are applicable only if all the following requirements are fulfilled: - Measurements performed with power frequency of 50 Hz or 60 Hz, or when testing with power supply within a frequency range of 45 Hz to 65 Hz. - Form wound windings and winding components such as bars and coils. - Winding with conductive slot coating. This is usually valid for machines with voltage rating of 6 kV and higher. For machines with random wound windings, form-wound windings without conductive slot coating, and testing at frequencies differing from power frequencies, the interpretation guidelines are not applicable. The testing procedures for off-line PD-measurements of this document can be used for assessing the uniform quality of manufacturing or/and the trending of these kind of windings as well as converter driven machine windings. NOTE: Testing of low voltage machines with so called Type I insulation systems is defined in IEC 60034- 18-41. Testing procedures for qualification of converter driven high voltage machines with so called Type II insulation systems are dealt with in IEC 60034-18-42 (in addition to the optional electric tests described therein).

Document preview — GB/T 20833.1-2021

National Standard of the People's Republic of China

Issued by: SAMR; SAC

Contents

  • Foreword...3
  • Introduction...6
  • 1 Scope...8
  • 2 Normative References...9
  • 3 Terms and Definitions...9
  • 4 Nature of PD in Rotating Machines...12
  • 5 Measuring Technologies and Instrumentation...15
  • 6 Visualization of Measurements...18
  • 7 Test Circuits...21
  • 8 Normalization of Measurements...27
  • 9 Test Procedures...30
  • 10 Interpretation of Test Results...36
  • 11 Test Report...42

Foreword

GB/T 20833 Rotating Electrical Machines - The Winding Insulation can be divided into the

following 4 parts:

--- Part 1: Off-Line Partial Discharge Measurements;

--- Part 2: On-Line Partial Discharge Measurements;

--- Part 3: Dielectric Dissipation Factor Measurement;

--- Part 4: Measurement of Insulation Resistance Polarization Index.

This Part is Part 1 of GB/T 20833.

This Part was drafted as per the rules stipulated in GB/T 1.1-2009.

This Part replaced GB/T 20833.1-2016 Rotating Electrical Machines - The Stator Winding

Insulation of Rotating Electrical Machines - Part 1: Off-Line Partial Discharge Measurements.

Compared with GB/T 20833.1-2016, the major technical changes of this Part are as follows:

--- Modify the Scope of the standard and Normative References (see Clause 1 and Clause 2

of this Edition; Clause 1 and Clause 2 of the 2016 Edition);

--- Add Terms and Definitions (see Clause 3 of this Edition);

--- Modify the nature of partial discharge in the motor (see Clause 4 of this Edition; Clause

4 of the 2016 Edition);

--- Modify the impact of measuring instruments (see 5.4 of this Edition; 5.4 of the 2016

Edition);

--- Modify the minimum range of partial discharge data expression (see 6.2 of this Edition;

6.2 of the 2016 Edition);

--- Add calibration pulse level and tolerance (see 7.1 of this Edition);

---Modify the standard measurement (see 7.3.2 and 7.3.3 of this Edition; 7.3.2 of the 2016

Edition);

--- Add the use of integrated test equipment (see 7.3.4 of this Edition);

--- Modify the partial discharge measurement of windings and winding components (see 9.1

of this Edition; 9.1 of the 2016 Edition);

--- Delete the electromagnetic probe (see 9.2.2 of the 2016 Edition);

--- Modified the evaluation of test results (see 10.1, 10.2.1 and 10.3.1 of this Edition; 10.1,

10.2.1 and 10.3.1 of the 2016 Edition);

--- Delete the annex of on-line partial discharge measurement (see Annex A of the 2016

Edition);

--- Add the influence of the test frequency parameter on the test process (see Annex A of this

Edition);

--- Add other methods for determining the amplitude of partial discharge (see Annex B of

this Edition);

--- Modify the method of off-line partial discharge detection and off-line location (see Annex

C of this Edition, Annex B of the 2016 Edition);

--- Add interpretation of partial discharge measurement and induction discharge/vibration

spark from terminal and star-connected neutral point (see Annex D of this Edition);

--- Add the complete winding measurement connection circuit (see Annex G of this Edition);

--- Modify the broadband and narrowband systems (see Annex H, 5.4 of the 2016 Edition).

This Part used translation method to equivalently adopt IEC 60034-27-1:2017 Rotating

Electrical Machines - Part 27-1: Off-Line Partial Discharge Measurements on the Winding

Insulation.

The Chinese documents that have consistent correspondence with the international documents

cited in this part are as follows:

--- GB/T 7354-2018 High-voltage test techniques - Partial discharge measurements (IEC

60270-2000, MOD);

--- GB/T 16927.1-2011 High-voltage test techniques—Part 1: General definitions and test

requirements (IEC 60060-1:2010, MOD);

--- GB/T 16927.2-2013 High-voltage test techniques - Part 2: Measuring systems (IEC

60060-2:2010, MOD);

--- GB/T 17948.4-2016 Rotating electrical machines - Functional evaluation of insulation

systems - Test procedures for form-wound windings - Evaluation by electrical endurance

(IEC 60034-18-32:2010, IDT);

--- GB/T 22720.2-2019 Rotating electrical machines - Qualification tests for the partial

discharge resistant electrical insulation systems (Type II) used in rotating electrical

machines fed from voltage converters (IEC 60034-18-42:2017, IDT);

--- GB/T 20833.2-2016 Rotating electrical machines - The stator winding insulation of

Rotating Electrical Machines - The Winding Insulation -

Part 1: Off-Line Partial Discharge Measurements

1 Scope

This Part of GB/T 20833 provides a common basis with respect to partial discharge off-line

measurements on the winding insulation of rotating electrical machines:

- measuring techniques and instruments;

- the arrangement of test circuits;

- normalization and testing procedures;

- noise reduction;

- the documentation of test results;

- the interpretation of test results.

The measurement methods described in this document are applicable to stator windings of

machines with or without conductive slot coating and to the stator windings of machines made

with form wound or random wound windings. In special cases like high voltage rotor field

windings, this document is applicable as well. The measurement methods are applicable when

testing with alternating sinusoidal voltages from 0.1 Hz up to 400 Hz; see Annex A.

Interpretation guidelines are given in this document and are applicable only if all the following

requirements are fulfilled:

- Measurements performed with power frequency of 50 Hz or 60 Hz, or when testing with

power supply within a frequency range of 45 Hz to 65 Hz.

- Form wound windings and winding components such as bars and coils.

- Winding with conductive slot coating. This is usually valid for machines with voltage

rating of 6 kV and higher.

For machines with random wound windings, form-wound windings without conductive slot

coating, and testing at frequencies differing from power frequencies, the interpretation

guidelines are not applicable. The testing procedures for off-line PD-measurements of this

document can be used for assessing the uniform quality of manufacturing or/and the trending

of these kind of windings as well as converter driven machine windings.

NOTE: Testing of low voltage machines with so called Type I insulation systems is defined in IEC 60034-

18-41. Testing procedures for qualification of converter driven high voltage machines with so called Type

II insulation systems are dealt with in IEC 60034-18-42 (in addition to the optional electric tests described

therein).

2 Normative References

The following documents are essential to the application of this Document. For the dated

documents, only the versions with the dates indicated are applicable to this Document; for the

undated documents, only the latest version (including all the amendments) is applicable to this

Document.

IEC 60034-18-32 Rotating Electrical Machines - Part 18-32: Functional Evaluation of

Insulation Systems - Test Procedures for Form-Wound Windings - Evaluation by

Electrical Endurance

IEC 60034-18-42 Rotating Electrical Machines - Part 18-42: Partial Discharge Resistant

Electrical Insulation Systems (Type II) Used in Rotating Electrical Machines Fed from

Voltage Converters - Qualification Tests

IEC TS 60034-27-2 Rotating Electrical Machines - Part 27-2: On-Line Partial Discharge

Measurements on the Stator Winding Insulation of Rotating Electrical Machines

IEC 60034-27-4 Rotating Electrical Machines - Part 27-4: Measurement of Insulation

Resistance and Polarization Index of Winding Insulation of Rotating Electrical Machines

IEC 60060-1 High-Voltage Test Techniques - Part 1: General Definitions and Test

Requirements

IEC 60060-2 High-Voltage Test Techniques - Part 2: Measuring Systems

IEC 60270:2000 High-Voltage Test Techniques - Partial Discharge Measurements

3 Terms and Definitions

For the purposes of this document, the terms and definitions given in IEC 60270 and the

following apply.

3.1 Partial discharge; PD

Localized electrical discharge that only partially bridges the insulation between conductors and

which can or cannot occur adjacent to a conductor.

3.2 Off-line measurement

at phase terminal side of stator winding. The PD activity results in increased ageing through

erosion of the main insulation. Coil loosening can also lead to mechanical abrasion in a severe

case.

As insulation erosion is caused by high voltage induced slot discharges, it will occur more

severely at bars/coils near HV terminals. Therefore, off-line PD measurements will provide

different PD intensity and, sometimes, patterns at terminal and neutral side, in the presence of

slot discharges.

Bar or coil vibration within the slots during operation, caused e.g., by forces due to the

electromagnetic field and in the condition that the bars and coils are not tight anymore, may be

the initial state of slot portion coating damage. Under certain conditions vibration sparking may

occur during machine operation. This is caused by intermitted interruption of driven currents

which are caused by electromagnetically induced voltages. Although it is not a PD phenomenon

it may occur similarly during measurements.

When the conductive slot coating is deteriorated by the vibration sparking, in standstill these

can be measured as slot discharges. Since vibration sparking is driven by the magnetic field this

phenomenon can occur mainly in the slot section of each bar or coil, from terminal side to

neutral side, the effect may be measured on both sides of the winding. Comparative

measurements including pattern analysis on terminal and neutral side may give an indication

for vibration sparking. F.1.4 provides more background information.

4.2.4 End-winding gap and surface discharges

Partial discharges in the end-winding area may occur at several locations with high local electric

field strengths. Such discharges usually occur at interfaces between different elements of the

stator winding overhang. If the stress control coating of the end-winding becomes ineffective

because of poorly designed interfaces, contamination, porosity, thermal effects, etc., reliable

field grading is no longer ensured and surface discharges will develop, which may gradually

erode the insulation and surface materials. This is normally a slow ageing mechanism. The PD

behavior might be subjected to relatively fast changes due to surface effects.

In addition, PD may occur between phases, for example due to inadequate interface clearance,

at elements of the overhang support system, or as phase to ground discharges on the end-

winding surface.

4.2.5 Foreign conductive materials discharges

Conductive contamination of the winding may result in a strong local concentration of partial

discharges. These may result in a localized damage in the insulation. More dangerous may be

larger metal pieces such as broken bolts or screws, as well as unintentionally forgotten tools.

Beside the local concentration of PD and its potentially damaging effect it may lead to

secondary impact such as immediate mechanical damage or abrasion driven by the impact of

the magnetic field to such metal pieces.

......

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

Referenced standards

How to Buy GB/T 20833.1-2021

  1. 1Add to cart. Click the "Buy GB/T 20833.1-2021" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 20833.1-2021

$640.00

$545.00for partners