Valid

GB/T 18216.11-2024Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC - Equipment for testing, measuring or monitoring of protective measures - Part 11: Effectiveness of residual current monitors(RCM)in TT, TN and IT systems (English PDF)

Preview PDF

This is a limited preview

Buy now to download the full PDF (14 pages)

Need quotation for your management?

Get a formal quotation for GB/T 18216.11-2024 in 30 minutes.

Issued by

State Administration for Market Regulation, China National Standardization Administration

Level / Type

National · Recommended

Issue date

December 31, 2024

Implementation date

July 1, 2025

Scope

GB/T 18216.11-2024 (Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC - Equipment for testing, measuring or monitoring of protective measures - Part 11: Effectiveness of residual current monitors(RCM)in TT, TN and IT systems) is available as an English-translated PDF.

GB/T 18216.11-2024 — This document specifies the test equipment used to test the effectiveness of residual current monitors (RCM) installed in power distribution systems.

Require. The test equipment can be used for any type of network, such as TN, TT or IT systems. The RCM that distinguishes the direction in the system. The purpose of this document is not to validate an RCM against its product standard.

Found what you need?

Document preview — GB/T 18216.11-2024

National Standard of the People's Republic of China

ICS
17.220.20
Classification
N 20

Issued by: State Administration for Market Regulation, China National Standardization Administration

Contents

  • Preface
  • Introduction
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 Requirements
  • 4.1 General requirements
  • 4.2 Function
  • 4.3 Fault voltage exceeding UL
  • 4.4 Overvoltage
  • 5 Marking and instruction manual
  • 5.1 Logo
  • 5.2 User Manual
  • 6 Experiments
  • 6.1 General Principles
  • 6.2 Working Uncertainty
  • 6.3 High fault voltage protection test
  • 6.4 Overvoltage test
  • References
  • Figure 1 Maximum step size of increasing smooth DC test current (IT)
  • Figure 2 Maximum gradient of linearly increasing smooth DC test current (IT)
  • Figure 3 Example of a linearly increasing smooth DC test current (IT). Ideltan = 30 mA
  • Table 1 Evaluation of working uncertainty

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting is required.

This document is a supplement to GB/T 18216 "Electrical safety protection measures for low voltage power distribution systems with AC 1 000 V and DC 1 500 V and below" Part 11 of "Test, Measuring or Monitoring Equipment". GB/T 18216 has published the following parts.

--Part 1: General requirements;

--Part 2: Insulation resistance;

--Part 3: Loop impedance;

--Part 4: Earth resistance and equipotential earth resistance;

--Part 5: Resistance to Earth;

-- Part 6: Effectiveness of residual current devices (RCD) in TT, TN and IT systems;

--Part 7: Phase sequence;

-- Part 8: Insulation monitoring devices in IT systems;

-- Part 9: Insulation fault location equipment in IT systems;

-- Part 10: Combined measuring equipment for testing, measuring or monitoring protective measures;

-- Part 11: Effectiveness of residual current monitors (RCM) in TT, TN and IT systems;

--Part 12: Power measurement and monitoring devices (PMD).

This document is equivalent to IEC 61557-11:2020 "Electrical safety equipment for low voltage power distribution systems up to 1 000 V AC and 1 500 V DC" Testing, measuring or monitoring equipment for complete protective measures - Part 11: Residual current monitors (RCM) for TT, TN and IT systems Effectiveness.

The following minimal editorial changes were made to this document.

--Corrected the editorial error in 4.3 of IEC 61557 - 11.2020, from "Figure 1 in IEC 61010 - 1.2010" to "IEC 61010-1:2010 Figure 2";

--Correct the editorial error in the formula in Note 6.1 of IEC 61557-11:2020, changing from "RA max = U LIdeltan Ideltao" to "RA max = UL Ideltan ".

Introduction

IEC 60364-6 specifies the initial testing, continuous monitoring and commissioning of electrical installations in TN, TT or IT systems.

In addition to specifying the general criteria for carrying out these tests, IEC 60364-6 also includes the Only in a few cases, such as when measuring insulation resistance, does IEC 60364-6 include the requirements for the measuring equipment used.

Circuit diagrams given as examples in IEC 60364-6 and referenced in the main body of the document are generally not applicable to Actual use.

When dangerous voltages are present in electrical installations and equipment is used improperly or is damaged, testing can easily cause accidents.

Therefore, technicians need to rely on measuring devices that ensure the safety of the measuring method in addition to simplifying the measurement.

Applying the general rules for safety of electrical and electronic measuring equipment (IEC 61010-1) to perform protective measures testing is not sufficient in itself.

Measurements in power installations can pose a hazard not only to the technicians but also to third parties due to different measurement methods.

Likewise, in order to obtain an objective assessment of the equipment, for example, periodic testing, continuous insulation monitoring or in the case of performance assurance, an important prerequisite is to obtain reliable and comparable measurement results with measuring devices from different manufacturers.

GB/T 18216 Test Method for Electrical Safety Protection Measures for Low Voltage Distribution Systems with AC 1000 V and DC 1500 V and Below the purpose of the "Testing, Measuring or Monitoring Equipment" is to provide uniform principles for compliance with the above characteristics, which apply to nominal voltage AC Measuring and monitoring equipment for electrical safety tests and performance tests in systems up to 1 000 V and 1 500 V DC. GB/T 18216 it is planned to consist of 17 parts.

--Part 1: General requirements. The purpose is to establish the low voltage distribution system with a nominal voltage of 1 000 V AC and 1 500 V DC and below General requirements for test equipment used for measuring and monitoring electrical safety in systems.

-- Part 2: Insulation resistance. The purpose is to establish the insulation resistance of equipment and electrical installation equipment in the non-energized state.

Relevant requirements for resistance equipment.

-- Part 3: Loop impedance. The purpose is to establish the impedance between the line conductor and the protective conductor, between the line conductor and the neutral conductor, or between the line conductor and the neutral conductor.

Requirements for loop impedance equipment between two conductors.

--Part 4: Ground resistance and equipotential ground resistance. The purpose is to establish the ground conductor of the measuring equipment, the protective ground conductor and related requirements for the resistance of equipotential bonding conductors.

--Part 5: Resistance to Earth. The purpose is to establish the requirements for measuring equipment that uses AC voltage to measure resistance to earth.

-- Part 6: Effectiveness of residual current devices (RCD) in TT, TN and IT systems. The purpose is to establish the Requirements for measuring equipment for the effectiveness of protective measures provided by residual current devices in TT, TN and IT systems.

--Part 7: Phase sequence. The purpose is to establish the requirements for measuring equipment used to test the phase sequence of three-phase distribution systems.

--Part 8: Insulation monitoring devices in IT systems. The purpose is to establish the relevant requirements for insulation monitoring devices in IT systems.

-- Part 9: Insulation fault location equipment in IT systems. The purpose is to establish the relevant About requirements.

-- Part 10: Combined measuring equipment for testing, measuring or monitoring protective measures. The purpose is to establish within a device Combined measurement that combines several measurement functions or test methods that conform to the individual parts of this series of standards Equipment requirements.

-- Part 11: Effectiveness of residual current monitors (RCM) in TT, TN and IT systems. The purpose is to establish Requirements for equipment for testing the effectiveness of residual current monitors (RCM) installed in power distribution systems.

--Part 12: Quantity measurement and monitoring devices (PMD). The purpose is to establish a comprehensive system for measuring and monitoring electrical parameters in power distribution systems.

Relevant requirements for combined electrical quantity measuring and monitoring devices.

-- Part 13: Hand-held and hand-operated current clamps and sensors for measuring leakage current in distribution systems.

Requirements for hand-held and hand-operated current clamps and sensors for measuring leakage current in electrical systems.

-- Part 14: Equipment for testing the safety of electrical equipment of machinery. The purpose is to specify the equipment for testing the safety of electrical equipment of machinery Special requirements for equipment.

-- Part 15: Functional safety requirements for insulation monitoring devices and insulation fault location equipment in IT systems.

Functional safety requirements for insulation monitoring devices and insulation fault location equipment in systems.

-- Part 16: Equipment for testing the effectiveness of protective measures for electrical equipment and/or medical electrical equipment. The purpose is to specify the test Particular requirements for equipment to ensure the effectiveness of protective measures for electrical equipment and/or medical electrical equipment.

--Part 17: Non-contact AC voltage indicators. The purpose is to specify the minimum performance of non-contact AC voltage indicators Require.

AC 1 000 V and DC 1 500 V and below Electrical safety protection measures for low voltage power distribution system Testing, measuring or monitoring equipment Part 11: Residual in TT, TN and IT systems Effectiveness of current monitors (RCM)

1 Scope

This document specifies the test equipment used to test the effectiveness of residual current monitors (RCM) installed in power distribution systems.

Require.

The test equipment can be used for any type of network, such as TN, TT or IT systems.

The RCM that distinguishes the direction in the system.

The purpose of this document is not to validate an RCM against its product standard.

2 Normative references

The contents of the following documents constitute the essential clauses of this document through normative references in this document.

For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to this document.

GB/T 18216.1-2021 Electrical safety protection measures for low voltage power distribution systems up to 1 000 V AC and 1 500 V DC Test, measuring or monitoring equipment for use with electrical equipment Part 1: General requirements (IEC 61557-1:2019, IDT) IEC 61010-1:2010 Safety requirements for electrical equipment for measurement, control and laboratory use Part 1: General requirements for electrical equipment for measurement, control and laboratory use-Part 1: General require-ments) Note. GB 4793.1-2007 Safety requirements for electrical equipment for measurement, control, and laboratory use Part 1: General requirements (IEC 61010-1:2001, IDT).

IEC 61557-6 Tests and measurements of electrical safety protection measures for low voltage power distribution systems up to 1 000 V AC and 1 500 V DC Measuring or monitoring equipment Part 6: Effectiveness of residual current devices (RCD) in TT, TN and IT systems (Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC-Equipment for testing, measuring or monitoring of protective measures-Part 6: Effectiveness of residual current devices (RCD) in TT, TN and IT systems Note. GB/T 18216.6-2022 Test, measurement or Monitoring equipment Part 6: Effectiveness of residual current devices (RCD) in TT, TN and IT systems (IEC 61557-6:2019, IDT).

3 Terms and definitions

The terms and definitions defined in GB/T 18216.1-2021, IEC 61557-6 and the following apply to this document.

ISO and IEC maintain terminology databases for standardization at the following addresses.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 14 pages — is available in the English PDF.

Referenced standards

How to Download GB/T 18216.11-2024

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
14 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 18216.11-2024

$290.00