GB/T 16895.17-2002Electrical installations of buildings - Part 5: Selection and erection of electrical equipment - Section 548: Earthing arrangements and equipotential bonding for information technology installations (English PDF)
建筑物电气装置 第5部分:电气设备的选择和安装 第548节:信息技术装置的接地配置和等电位联结
GB/T 16895.17 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| GB/T 16895.17-2002 | Electrical installations of buildings - Part 5: Selection and erection of electrical equipment - Section 548: Earthing arrangements and equipotential bonding for information technology installations | Obsolete |
GB/T 16895.17-2002 is obsolete. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for GB/T 16895.17-2002 in 30 minutes.
Issued by
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China
Level / Type
National · Recommended
Issue date
August 5, 2002
Implementation date
April 1, 2003
Scope
GB/T 16895.17-2002 is the English-translated version of 建筑物电气装置 第5部分:电气设备的选择和安装 第548节:信息技术装置的接地配置和等电位联结.
GB/T 16895.17-2002 is the Chinese national standard "Electrical installations of buildings - Part 5: Selection and erection of electrical equipment - Section 548: Earthing arrangements and equipotential bonding for information technology installations".
It was issued on August 5, 2002 by the General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, and took effect on April 1, 2003. It is obsolete: it has been withdrawn (abolished on December 15, 2017).
Found what you need?
Document preview — GB/T 16895.17-2002
National Standard of the People's Republic of China
Issued by: General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China
Contents
- Document data
1 Document data
Sector: National standard (Recommended).
Issuing body: General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China.
Date of issue: 2002-08-05.
Date of implementation: 2003-04-01.
Status: obsolete, withdrawn on 2017-12-15.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
How to Download GB/T 16895.17-2002
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 16895.18-2010 — Electrical installations of buildings -- Part 5-51: Selection and erection of electrical equipment -- Common rules
GB/T 16895.16-2002 — Electrical installations of buildings - Part 4: Protection for safety - Chapter 44: Protection against overvoltage - Section 444: Protection against electromagnetic interferences (EMI) in installations of buildings
GB/T 16895.18-2002 — Electrical installations of buildings - Part 5: Selection and erection of electrical equipment - Chapter 51: Common rules
Secure payment via Stripe
Payments accepted
GB/T 16895.17-2002
$105.00