GB 51037-2014Standard for construction and acceptance of micro-assembling production line process equipment installation engineering (English PDF)
微组装生产线工艺设备安装工程施工及验收标准
Open the GB 51037-2014 preview as PDF
This is a limited preview
Buy now to download the full PDF (65 pages)
Issued by
SAMR; SAC
Level / Type
National · Mandatory
Issue date
August 27, 2014
Implementation date
May 1, 2015
Scope
GB 51037-2014 is the English-translated version of 微组装生产线工艺设备安装工程施工及验收标准.
GB 51037-2014 governs the installation of the process equipment that makes up a micro-assembling production line, covering construction, debugging, commissioning and acceptance in new, rebuilt and extended projects. It sets out the state the clean plant must be in before equipment arrives - empty-state acceptance passed, the air cleaning and conditioning system run in, temperature and humidity within band, floor bearing capacity, clear height, personnel purification, an equipment entry opening, fire-fighting and antistatic facilities accepted, and utilities and earthing in place - together with the technical documents, the permits for personnel entering the clean area, and the material and tooling standards that apply. Rules follow for unpacking, moving, installing, debugging and commissioning the equipment. Separate chapters then treat, machine by machine, the process equipment for co-fired ceramic and thick film substrate manufacture, for thin film substrate manufacture, for assembly and packaging, and for process inspection, and a final chapter deals with handover acceptance, completion acceptance and the disposal of items that fail acceptance. An appendix supplies the acceptance record forms. Terms used in the text, among them micro-assembling, co-fired ceramic, thin film, green tape, packaging and process inspection, are defined in Chapter 2.
Document preview — GB 51037-2014
National Standard of the People's Republic of China
- Classification
- P
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- 1 General provisions1
- 2 Terms2
- 3 Basic requirements4
- 3.1 Construction conditions4
- 3.2 Equipment unpacking5
- 3.3 Equipment moving5
- 3.4 Equipment installation6
- 3.5 Equipment debugging and commissioning7
- 4 Installation, debugging and commissioning of low temperature co-fired ceramic and thick film substrate production process equipment9
- 4.1 General requirements9
- 4.2 Tape caster10
- 4.3 Blanker11
- 4.4 Green tape puncher11
- 4.5 Laser puncher12
- 4.6 Via filling machine13
- 4.7 Screen printer14
- 4.8 Stacking machine15
- 4.9 Isostatic laminator16
- 4.10 Hot cutter17
- 4.11 Low temperature co-fired ceramic box furnace17
- 4.12 Thickfilm belt furnace18
- 4.13 Laser resistor trimmer18
- 4.14 Integrated control system19
- 4.15 Uncovering film machine19
- 4.16 Automated transmission line20
- 4.17 Frame pasting machine21
- 4.18 Film pasting machine22
- 4.19 Cache library22
- 4.20 Automated guided vehicle23
- 4.21 Drying oven24
- 4.22 HTCC box furnace25
- 4.23 Electroplating production line27
- 5 Installation, debugging and commissioning of thin film substrate production process equipment29
- 5.1 General requirements29
- 5.2 Magnetic sputtering deposition system29
- 5.3 Vacuum evaporation copper-coated machine30
- 5.4 Chemical vapor deposition system32
- 5.5 Spin coating and hot plate system33
- 5.6 Exposure machine34
- 5.7 Developing system35
- 5.8 Reactive ion etching machine36
- 5.9 Chemical mechanical polishing machine37
- 6 Installation, debugging and commissioning of assembling and packaging process equipment39
- 6.1 General requirements39
- 6.2 Die attaching machine39
- 6.3 Die eutectic bonder40
- 6.4 Eutectic oven42
- 6.5 Wire bonder43
- 6.6 Flip chip bonder44
- 6.7 Plasma cleaner45
- 6.8 Selective spray coating machine45
- 6.9 Parallel seam welder46
- 6.10 Energy storage welder47
- 6.11 Laser welder48
- 7 Installation, debugging and commissioning of process inspection equipment50
- 7.1 General requirements50
- 7.2 Probe tester50
- 7.3 Acoustic scanner51
- 7.4 3D optical profiler51
- 7.5 Automatic optical inspector52
- 7.6 Laser thickness gauge52
- 7.7 X-ray scanner53
- 7.8 Chip shearing/wire pulling tester53
- 8 Engineering acceptance55
- 8.1 General requirements55
- 8.2 Handover acceptance55
- 8.3 Completed acceptance56
- 8.4 Disposal of reject57
- Appendix A Record forms of acceptance for micro-assembling production line process equipment installation engineering58
- Explanation of wording in this standard63
- List of quoted standards64
- Addition: Explanation of provisions65
1 General provisions
1.0.1 The document was drawn up to regulate the construction and the quality acceptance of installation works for micro-assembling production line process equipment, to secure the installation quality and the reliable running of that equipment, and to advance equipment installation technology in this field.
1.0.2 It applies to the construction, debugging, commissioning and acceptance of installation works for micro-assembling production line process equipment in new, rebuilt and extended projects.
1.0.3 Apart from this standard, the construction and acceptance of installation works for micro-assembling production line process equipment shall also comply with the relevant provisions of the national standards currently in force.
2 Terms
2.0.1 micro-assembling - technology in which the various miniature components, integrated circuit chips and chip components that make up an electronic circuit are assembled on a high-density multilayer interconnection substrate by surface mounting and interconnection processes, forming an advanced microelectronic assembly.
2.0.2 multilayer substrate - substrate carrying embedded conductor layers, used to realise complex interconnection circuits.
2.0.3 thick film - film layer deposited on a substrate by a screen printing process and fused into its final form after firing at a maximum temperature of about 850 °C.
2.0.4 co-fired ceramic - composite ceramic material with a range of properties, obtained by making ceramic powder into green sheets of accurate thickness and high density, forming the circuits on multiple layers of green sheets and then firing and fusing them together; it is divided into low temperature co-fired ceramic and high temperature co-fired ceramic. (Clause revised in the 2024 partial revision; formerly 2.0.4 low temperature co-fired ceramic multilayer substrate.)
2.0.4A low temperature co-fired ceramic (LTCC) - rigid multilayer interconnection ceramic part obtained by stacking in order unfired flexible green ceramic sheets that carry printed thick film conductor and resistor patterns on the surface and metallised interlayer interconnection vias, pressing them into an integral structure while heating, and then co-firing the green sheets together with the thick film electronic pastes in an air atmosphere at a temperature of 800 °C to 950 °C.
2.0.4B high temperature co-fired ceramic (HTCC) - rigid multilayer interconnection ceramic part obtained by stacking in order unfired flexible green ceramic sheets that carry printed thick film conductor and resistor patterns on the surface and metallised interlayer interconnection vias, pressing them into an integral structure while heating, and then co-firing the green sheets together with the thick film electronic pastes in a hydrogen or hydrogen-nitrogen mixed atmosphere at a temperature of 1500 °C to 1850 °C.
2.0.5 thin film - conductive, resistive or dielectric material layer formed on a co-fired ceramic substrate by vacuum evaporation, sputtering, chemical vapour deposition or similar methods, its thickness usually being less than 1 micrometre. (Clause revised in the 2024 partial revision; formerly 2.0.5 thin film multilayer substrate.)
2.0.6 green tape - strip-shaped flexible thin ceramic material made by a tape casting process, uniform in texture, smooth on the surface and of a certain strength.
2.0.7 packaging - microelectronic process technology for interconnecting, protecting and dissipating the heat of electronic devices (microcircuits or assemblies); it falls mainly into three types, plastic packaging, ceramic packaging and metal packaging.
2.0.8 process inspection - process of measuring and inspecting the shape, dimensions and position of a product and its mechanical, physical and chemical characteristics with metering or testing tools, instruments or equipment and comparing them against its technical requirements; it is the inspection technique by which, during production, the conformity of a process step or of the finished state of a product with what the design and process documents lay down is evaluated.
3.1 Construction conditions
3.1.1 Before micro-assembling equipment is installed, the clean plant shall satisfy the following provisions: (1) it shall have passed as-built acceptance in the empty state, and the air cleaning and conditioning system shall have run continuously and normally for 24 h or more; (2) the temperature should be 20 °C to 26 °C; (3) the relative humidity should be 30 % to 70 %; (4) the bearing capacity of the floor shall meet the load requirements of the equipment; (5) the clear height shall meet the installation requirements of the equipment; (6) the personnel purification facilities at the entrance of the plant shall already be in service; (7) an opening for moving equipment in shall be available; (8) the fire-fighting facilities shall have passed their special acceptance and be ready for use; (9) the antistatic facilities of the antistatic working area shall have passed test acceptance; (10) power, gas and water supplies and earthing terminals meeting the requirements shall be present; (11) a safe evacuation route for the staff shall be provided.
3.1.2 The following technical documents shall be available for the installation of micro-assembling equipment: (1) the equipment installation layout drawing; (2) the equipment packing list; (3) the technical documents on equipment installation, operation and maintenance and the installation technical parameters supplied by the equipment manufacturer.
3.1.3 Construction personnel entering the clean plant shall have obtained a pass for the clean area, and personnel in special trades shall hold the certificates required by the relevant provisions.
3.1.4 Materials for equipment installation and for piping and wiring works shall comply with the relevant provisions of the current national standard GB 50472 Code for design of clean room of electronic industry.
3.1.5 The machines and tools used for construction shall comply with the relevant provisions of the current national standard GB 50467 Code for construction and acceptance of microelectronic production equipment installation engineering.
3.2 Equipment unpacking
3.2.1 Unpacking of the equipment shall be attended jointly by responsible personnel of the equipment supplier, the construction unit and the client; for imported equipment subject to statutory commodity inspection, a customs commodity inspection representative shall attend as well.
3.2.2 Before unpacking, the packing case shall be checked for damage and for the extent of any damage, and the anti-vibration and anti-tilt indicators shall show nothing abnormal.
3.2.3 Unpacking of the equipment shall satisfy the following provisions: (1) effective opening tools shall be used and a reasonable procedure followed, without causing damage to the equipment in the case or to its accessories; (2) the top cover of the case shall be removed first, after the nails or other fasteners of the top cover have been pulled out; (3) once the top cover and part or all of the side covers have been removed, the small parts and accessories other than the main unit shall be taken out first, and the remaining unpacking work carried out afterwards.
3.2.4 The packing materials removed shall be cleared away promptly after unpacking.
3.2.5 After unpacking, the equipment inside, the inner packing and the equipment accessories shall be checked for soundness; if anything abnormal is found, a photographic record shall be made at once and proposals for dealing with it put forward.
3.2.6 After unpacking, the following checks shall be made item by item: (1) the model and specification shown on the equipment nameplate shall agree with the equipment list or the technical parameter table; (2) any defect, damage or corrosion of the appearance and of the protective packing of the equipment shall be reported promptly and recorded, and manufacturing defects shall be notified to the equipment manufacturer for study and settlement; (3) parts, components, tools, accessories, ancillary materials and other technical documents shall be counted one by one against the packing list to see whether they are complete, and a record shall be made; (4) after unpacking and checking are complete, the parts, accessories, ancillary materials, tools and fixtures and technical documents that are not to be installed or are not used during installation shall be handed over to the user unit for safe keeping.
3.2.7 An unpacking inspection record shall be filled in for the unpacking of the equipment, and its content and format shall comply with Table A.0.1 of this standard.
2024 partial revision and change of title
The copy on offer is the 2024 printing. It carries Announcement No. 107 of 2024 of the Ministry of Housing and Urban-Rural Development, dated 27 June 2024, which approves partially revised clauses of GB 51037-2014 with effect from 1 October 2024 and states that the title of the standard is changed from Code for construction and acceptance of micro-assembling production line process equipment installation engineering to Standard for construction and acceptance of micro-assembling production line process equipment installation engineering, that is, from Code (guifan) to Standard (biaozhun). The cover of this printing carries the new title; the standard number, the issue date of 27 August 2014 and the implementation date of 1 May 2015 are unchanged, and the document remains a mandatory GB standard.
The explanation of the partial revision names the changes: in Chapter 2 the term 2.0.4 was changed from low temperature co-fired ceramic multilayer substrate to co-fired ceramic and 2.0.5 from thin film multilayer substrate to thin film, both redefined; the technical scope of Chapter 4 was widened from low temperature co-fired ceramic to co-fired ceramic manufacturing process equipment in general, taking in high temperature co-fired ceramic equipment, and the chapter was renamed accordingly; clauses 4.1.4 on equipment interconnection and interoperability and 4.1.5 on process equipment system integration were added; 4.4 was renamed from green tape puncher to mechanical puncher; interconnection, interoperability and system integration requirements were added for the equipment of 4.3, 4.4, 4.5, 4.6, 4.7 and 4.8; and 4.14 integrated control system, 4.15 uncovering film machine, 4.16 automated transmission line, 4.17 frame pasting machine, 4.18 film pasting machine, 4.19 cache library, 4.20 automated guided vehicle, 4.21 drying oven, 4.22 high temperature co-fired ceramic sintering furnace and 4.23 electroplating production line were added. In Chapter 5 the installation requirements for 5.8 reactive ion etching machine and 5.9 chemical mechanical polishing machine were supplemented. In Chapter 6 clause 6.1.4 was added, 6.2 was renamed from chip die bonder to chip mounter, and full-automatic equipment was added alongside the manual and semi-automatic equipment for 6.2, 6.3 and 6.5. Revised passages are marked with an underline in the printed text.
The revision was carried out by the China Electronics Standardization Institute together with the No. 2 Research Institute of China Electronics Technology Group Corporation and other bodies, under the 2019 work plan of the Ministry of Housing and Urban-Rural Development (Jianbiaohan [2019] No. 8).
Note on the printed English wording
The English contents pages of this printing spell the ceramic process co-fined in the headings of Chapter 4 and of clause 4.11; this is a typing error for co-fired, and the table of contents above carries the corrected spelling. The Chinese text uses the term for co-fired ceramic throughout, and the English glosses printed against terms 2.0.4, 2.0.4A and 2.0.4B in Chapter 2 read co-fired ceramic, low temperature co-fired ceramic and high temperature co-fired ceramic.
The English contents of this printing were not brought into line with the 2024 partial revision. The heading of Chapter 4 still reads low temperature co-fired ceramic and thick film substrate production process equipment and clause 4.4 still reads green tape puncher, whereas the Chinese contents of the same printing read co-fired ceramic and thick film substrate manufacturing process equipment and mechanical puncher. The table of contents above reproduces the printed English headings, with the spelling corrected, and this divergence between the two languages is left as it stands in the document.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 65 pages — is available in the English PDF.
How to Buy GB 51037-2014
- 1Add to cart. Click the "Buy GB 51037-2014" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 11118-2026 — Hydraulic fluids (L-HL, L-HM, L-HV, L-HS and L-HG type)
GB 11557-2026 — Provisions for protecting drivers from injury by the steering mechanism of motor vehicles
GB 12021.4-2026 — Maximum allowable values of the energy consumption, water consumption and grades for electric washing machines and washer-dryers
Secure payment via Stripe
Payments accepted
GB 51037-2014