GB 51020-2014Code for design of ventilation dedusting and fume scrubbing of aluminum smelter (English PDF)
铝电解厂通风除尘与烟气净化设计规范
Also coversGB51020-2014
This is a limited preview
Buy now to download the full PDF (42 pages)
Need quotation for your management?
Get a formal quotation for GB 51020-2014 in 30 minutes.
Issued by
Ministry of Housing and Urban-Rural Construction of the People’s Republic of China
Level / Type
National · Mandatory
Issue date
July 13, 2014
Implementation date
May 1, 2015
Scope
GB 51020-2014 is the English-translated version of 铝电解厂通风除尘与烟气净化设计规范.
GB 51020-2014 is the Chinese standard "Code for design of ventilation dedusting and fume scrubbing of aluminum smelter".
Its scope clause reads: 1.0.1 This code is formulated with a view to raising the design level of ventilation dedusting and fume scrubbing in aluminium smelters and achieving advanced technology, safety and reliability, environmental protection and energy saving, economic rationality and convenient management.
1.0.2 This code is applicable to the design of ventilation dedusting and fume scrubbing works for new, expanded and reconstructed aluminium smelters, and for the production workshops and auxiliary facilities of anode and cathode manufacturing plants for aluminium electrolysis.
1.0.3 For the production process design related to ventilation dedusting and fume scrubbing, processes, technologies and equipment that generate no or little hazardous substances shall be adopted.
1.0.4 The design of ventilation dedusting and fume scrubbing shall adopt efficient, energy-saving and safe technologies, processes and equipment. Treatment measures shall be taken for the waste water, waste materials and waste residues of the systems, which shall be returned to the production system where they meet production requirements.
Ventilation dedusting and fume scrubbing facilities shall be interlocked with the related production process systems or equipment.
1.0.5 The equipment level of the ventilation dedusting and fume scrubbing design should not be lower than that of the process design, and the facilities shall be designed, constructed and put into production simultaneously with the main project.
1.0.6 The design of ventilation dedusting and fume scrubbing of aluminium smelters shall comply not only with this code but also with the provisions of the relevant current national standards.
Found what you need?
Document preview — GB 51020-2014
National Standard of the People's Republic of China
- Classification
- P 73
Issued by: Ministry of Housing and Urban-Rural Construction of the People’s Republic of China
Contents
- 1 General provisions
- 2 Terms
- 3 Basic requirements for ventilation and dedusting
- 3.1 Ventilation
- 3.2 Dedusting
- 3.3 Ventilation and dedusting equipment
- 3.4 Air ducts and others
- 3.5 Automatic control
- 3.6 Noise reduction and vibration isolation
- 4 Electrolysis production system
- 4.1 Pot room
- 4.2 Butt cooling room
- 4.3 Cast house
- 4.4 Ladle cleaning room
- 4.5 Anode assembly
- 4.6 Pot repair and auxiliary repair
- 4.7 Storage and conveying of alumina and fluoride salts
- 4.8 Power distribution installations
- 4.9 Rectifier station
- 5 Carbon production system
- 5.1 Raw material storage
- 5.2 Pitch melting
- 5.3 Calcination
- 5.4 Green anode and green cathode manufacture
- 5.5 Baking and carbon block transport
- 5.6 Treatment of returned material
- 5.7 Graphitization
- 5.8 Machining
- 6 Auxiliary and ancillary facilities
- 6.1 Water supply and drainage facilities
- 6.2 Power facilities
- 6.3 Public utilities and ancillary buildings
- 7 Basic requirements for fume scrubbing
- 7.1 General arrangement
- 7.2 Alumina conveying and metering
- 7.3 Scrubbing equipment
- 7.4 Fume exhaust ducts
- 7.5 Stack
- 7.6 Operation monitoring and control
- 7.7 Safety facilities
- 8 Electrolysis fume scrubbing
- 8.1 Types of pollutants, emission quantities and scrubbing efficiency
- 8.2 General arrangement
- 8.3 Basic design parameters
- 8.4 Fume exhaust system and equipment
- 9 Baking fume scrubbing
- 9.1 Pollutants and emission quantities of baking fume
- 9.2 Baking fume scrubbing system
- 9.3 Ducts and equipment arrangement of the baking fume scrubbing system
- Explanation of wording in this code
- List of quoted standards
- Addition: Explanation of provisions
Foreword
This code was prepared by China Nonferrous Metals Engineering Co., Ltd. and Shenyang Aluminum and Magnesium Engineering and Research Institute Co., Ltd. jointly with the relevant organizations, according to the requirements of the "Notice on Printing and Distributing the Plan for the Formulation and Revision of Engineering Construction Standards and Codes in 2010" (Jianbiao [2010] No. 43) issued by the Ministry of Housing and Urban-Rural Development.
During the preparation of this code, the drafting group carried out extensive investigation and research on domestic aluminium electrolysis enterprises, carefully summarized practical experience, referred to advanced experience at home and abroad, and widely solicited the opinions of the relevant design, scientific research and production organizations; through repeated discussion it drew up the draft for approval, which was finally submitted to the Ministry of Housing and Urban-Rural Development for examination and finalization.
This code consists of 9 chapters, and the main technical contents are: general provisions, terms, basic requirements for ventilation and dedusting, electrolysis production system, carbon production system, auxiliary and ancillary facilities, basic requirements for fume scrubbing, electrolysis fume scrubbing, and baking fume scrubbing.
The provisions printed in bold type in this code are mandatory provisions and shall be strictly implemented.
The Ministry of Housing and Urban-Rural Development is in charge of the administration of this code and the interpretation of the mandatory provisions, the Administration Office of Engineering Construction Standards of the China Nonferrous Metals Industry is responsible for the routine management, and Shenyang Aluminum and Magnesium Engineering and Research Institute Co., Ltd. is responsible for the explanation of the specific technical contents. Any comments or suggestions arising during the implementation of this code should be sent to Shenyang Aluminum and Magnesium Engineering and Research Institute Co., Ltd. (address: No. 184 Heping North Street, Shenyang; postcode: 110001) for reference in future revision.
Chief development organizations: China Nonferrous Metals Engineering Co., Ltd.; Shenyang Aluminum and Magnesium Engineering and Research Institute Co., Ltd.
Participating development organizations: Guiyang Aluminum and Magnesium Design and Research Institute Co., Ltd.; Liancheng Branch of Aluminum Corporation of China Limited; Gansu Academy of Civil Engineering Science.
Participating organization: Jiehua Holding Co., Ltd.
1 General provisions
1.0.1 This code is formulated with a view to raising the design level of ventilation dedusting and fume scrubbing in aluminium smelters and achieving advanced technology, safety and reliability, environmental protection and energy saving, economic rationality and convenient management.
1.0.2 This code is applicable to the design of ventilation dedusting and fume scrubbing works for new, expanded and reconstructed aluminium smelters, and for the production workshops and auxiliary facilities of anode and cathode manufacturing plants for aluminium electrolysis.
1.0.3 For the production process design related to ventilation dedusting and fume scrubbing, processes, technologies and equipment that generate no or little hazardous substances shall be adopted.
1.0.4 The design of ventilation dedusting and fume scrubbing shall adopt efficient, energy-saving and safe technologies, processes and equipment. Treatment measures shall be taken for the waste water, waste materials and waste residues of the systems, which shall be returned to the production system where they meet production requirements. Ventilation dedusting and fume scrubbing facilities shall be interlocked with the related production process systems or equipment.
1.0.5 The equipment level of the ventilation dedusting and fume scrubbing design should not be lower than that of the process design, and the facilities shall be designed, constructed and put into production simultaneously with the main project.
1.0.6 The design of ventilation dedusting and fume scrubbing of aluminium smelters shall comply not only with this code but also with the provisions of the relevant current national standards.
2 Terms
2.0.1 pollution source of fume (dust)
Location where fume (dust) is generated.
2.0.2 harmful gas
Gas emitted in the production process that pollutes the environment.
2.0.3 fume
Process waste gas generated by reduction cells and baking furnaces in the production process.
2.0.4 ventilation
Technical measure by which air is brought into or exhausted from a room by natural or mechanical means in order to meet air environment requirements such as hygiene and safety; it consists of exhaust hoods, fans, ducts, air inlets and air outlets, etc.
2.0.5 dedusting
Technical measure for the cleaning treatment of dust generated in the production process of an aluminium smelter; it consists of gas collecting and dust suction hoods, ducts, dust collectors, dust discharge devices, fans, exhaust stacks, etc.
2.0.6 fume scrubbing
Technical measure for the purification and treatment of the fume emitted by aluminium reduction cells and baking furnaces in the production process.
2.0.7 fume scrubbing system
System works for the treatment of fume from aluminium reduction cells and baking furnaces, consisting of ducts, dust collectors, fans, stacks and system auxiliary devices.
2.0.8 bag filter
Dust collection and purification device that uses bag-shaped or cylindrical filter elements made of filter media to capture the dust in dust-laden gas and to adsorb harmful gases such as hydrogen fluoride (HF) and sulfur dioxide (SO2).
2.0.9 high-voltage electrostatic precipitator
Dust collector that separates dust and tar from the gas by the adsorption action of a high-voltage electric field on charged dust and charged tar droplets. A high-voltage electrostatic precipitator used mainly for treating liquid pitch tar is also commonly called an electrostatic tar precipitator.
2.0.10 standard condition
State of a gas at a temperature of 273.15 K and a pressure of 101.325 kPa. The fume volumes specified in this code are all based on dry gas under standard condition.
3 Basic requirements for ventilation and dedusting
3.1 Ventilation
3.1.1 The ventilation of aluminium smelters shall meet the following requirements:
1 The basis of workshop ventilation design shall comply with the relevant provisions of the current national standards "Hygienic standards for the design of industrial enterprises" GBZ 1, "Occupational exposure limits for hazardous agents in the workplace - Part 1: Chemical hazardous agents" GBZ 2.1 and "Occupational exposure limits for hazardous agents in the workplace - Part 2: Physical agents" GBZ 2.2, and of the current national standard "Design code for heating ventilation and air conditioning of civil buildings" GB 50736.
2 Production workshops generating surplus heat and harmful gases shall be provided with ventilation facilities. Production equipment emitting harmful substances shall be enclosed. Pollution sources shall be provided with local ventilation; where hygienic requirements cannot be met, general ventilation shall be added as a supplement.
3 The arrangement of process equipment in the workshop and the building form shall be coordinated with the ventilation design, and surplus heat and harmful gases shall be subjected to protection and treatment.
4 Where surplus heat and harmful substances generated indoors would pollute adjacent rooms, negative pressure shall be maintained indoors. Where the process production has cleanliness requirements for the indoor air, positive pressure shall be maintained indoors.
5 Supply air outlets of the ventilation system shall be arranged upwind of the pollution source, and exhaust outlets shall be arranged downwind of the pollution source.
6 Where rooms requiring ventilation have dust-proof requirements, filtering measures shall be taken for the intake air.
7 The ventilation volume shall be determined according to the emission quantities of surplus heat and harmful substances and the permissible values of the harmful substances. The surplus heat shall include the building cooling load.
8 The emission of harmful substances shall comply with the relevant provisions of the current national standard "Integrated emission standard of air pollutants" GB 16297.
9 The design of smoke control and smoke exhaust systems shall comply with the relevant provisions of the current national standard "Code of design on building fire protection and prevention" GB 50016.
3.1.2 Natural ventilation shall meet the following requirements:
1 Production workshops and auxiliary buildings should adopt natural ventilation;
2 In summer, measures favourable to removing surplus heat and lowering the indoor temperature shall be taken; in winter, measures favourable to using surplus heat to maintain the indoor heating temperature shall be taken. Air inlets and outlets shall be provided with opening and closing measures.
3.1.3 Mechanical ventilation shall meet the following requirements:
1 Production buildings with mechanical exhaust should adopt natural make-up air; where this does not meet the requirements, mechanical air supply should be adopted;
2 Where there are requirements for the room temperature of production buildings with mechanical exhaust, air volume balance and heat balance calculations shall be carried out;
3 Mechanical ventilation systems shall be divided according to the process production flow, the production working time and the nature of the harmful substances exhausted;
4 In workshops simultaneously emitting surplus heat and harmful gases, or emitting only harmful gases with a density lower than that of air, in addition to local exhaust, natural or mechanical exhaust should be taken from the upper zone, with an exhaust volume of not less than 1 air change per hour; where the room height is greater than 6 m, the exhaust volume may be calculated as 6 m3/(h x m2);
5 In workshops emitting dust or harmful gases with a density greater than that of air, exhaust should be taken from the lower zone and supply air should be delivered to the upper zone; 2/3 of the total exhaust volume should be exhausted from the lower zone and 1/3 of the total air volume from the upper zone, and the air change rate shall not be less than 1 air change per hour.
3.1.4 Emergency ventilation shall meet the following requirements:
1 Rooms that may emit large quantities of harmful gases or gases with explosion hazard shall be provided with an emergency ventilation system.
2 Emergency ventilation should be provided jointly by the ventilation system in regular use and the emergency ventilation system, and when an accident occurs the required emergency ventilation volume shall be ensured.
3 For non-enclosed rooms, the emergency exhaust may be provided without a make-up air system. Enclosed rooms shall be provided with a mechanical make-up air system, the make-up air volume shall be greater than 50% of the exhaust volume, and the emergency exhaust system shall be interlocked with the make-up air system.
4 The suction inlets of emergency ventilation shall be located at the positions where the emission of harmful gases or explosive hazardous substances is greatest or where they accumulate most.
5 The exhaust outlets of emergency ventilation shall not be located at positions where persons stay or pass. The horizontal distance between the exhaust outlet and the air intake of the mechanical air supply system shall not be less than 20 m; where it is less than 20 m, the exhaust outlet shall be more than 6 m higher than the air intake.
6 For rooms emitting explosive hazardous substances, where combustible or harmful gas detection and alarm devices are provided, the emergency ventilation system should be started in interlock with them;
7 The emergency ventilation volume should be determined by calculation according to the process design requirements, but the air change rate shall not be less than 12 air changes per hour;
8 The fans of emergency ventilation shall be provided with electrical switches both indoors and outdoors.
Remaining clauses in the full document
- 3.2 Dedusting
- 3.3 Ventilation and dedusting equipment
- 3.4 Air ducts and others
- 3.5 Automatic control
- 3.6 Noise reduction and vibration isolation
- 4 Electrolysis production system
- 5 Carbon production system
- 6 Auxiliary and ancillary facilities
- 7 Basic requirements for fume scrubbing
- 8 Electrolysis fume scrubbing
- 9 Baking fume scrubbing
- Explanation of wording in this code
- List of quoted standards
- Addition: Explanation of provisions
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 42 pages — is available in the English PDF.
How to Download GB 51020-2014
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 11118-2026 — Hydraulic fluids (L-HL, L-HM, L-HV, L-HS and L-HG type)
GB 11557-2026 — Provisions for protecting drivers from injury by the steering mechanism of motor vehicles
GB 12021.4-2026 — Maximum allowable values of the energy consumption, water consumption and grades for electric washing machines and washer-dryers
Secure payment via Stripe
Payments accepted
GB 51020-2014
$455.00