GB 50930-2013Code for design of cold rolling strip plant (English PDF)
冷轧带钢工厂设计规范
This is a limited preview
Buy now to download the full PDF (64 pages)
Need quotation for your management?
Get a formal quotation for GB 50930-2013 in 30 minutes.
Issued by
Ministry of Housing and Urban-Rural Development of the People's Republic of China; General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China
Level / Type
National · Mandatory
Issue date
November 29, 2013
Implementation date
June 1, 2014
Scope
GB 50930-2013 is the English-translated version of 冷轧带钢工厂设计规范.
GB 50930-2013 — 1.0.1 In order to implement the national iron and steel industry development policy, standardize the design of cold-rolled strip factory, realize the advanced nature, practicability, economy and rationality of cold-rolled strip factory design, and ensure that the factory meets the requirements of energy saving, environmental protection, safety and fire protection, etc., develop this specification.
1.0.2 This specification is applicable to the design of new, rebuilt and expanded cold-rolled strip factories and independent workshops, but not applicable to the design of cold-rolled electrical steel factories and cold-rolled stainless steel factories.
1.0.3 The design of the cold-rolled strip steel plant shall not only conform to this specification, but also comply with the current relevant national standards.
Found what you need?
Document preview — GB 50930-2013
National Standard of the People's Republic of China
- ICS
- 77.010
- Classification
- P 73
Issued by: Ministry of Housing and Urban-Rural Development of the People's Republic of China; General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China
Contents
- 1 General
- 2 Terms and abbreviations
- 2.1 Terminology
- 2.2 Abbreviations
- 3 Basic Regulations
- 4 Process and equipment
- 4.1 General provisions
- 4.2 Process flow
- 4.3 Production units and cranes
- 4.4 Workshop Layout
- 4.5 Workshop piping
- 4.6 Workshop transportation
- 5 General layout
- 6 Power supply and distribution facilities
- 6.1 General provisions
- 6.2 Power supply
- 6.3 Power supply and distribution system
- 6.4 Power supply and distribution lines
- 7 Electrical Transmission and Electrical Engineering
- 7.1 Low-voltage power supply and distribution system
- 7.2 Electric drive
- 7.3 Electrical Engineering
- 8 Detection instrument
- 8.1 General provisions
- 8.2 Testing instrument equipment
1 General
1.0.1 In order to implement the national iron and steel industry development policy, standardize the design of cold-rolled strip factory, realize the advanced nature, practicability, economy and rationality of cold-rolled strip factory design, and ensure that the factory meets the requirements of energy saving, environmental protection, safety and fire protection, etc., develop this specification.
1.0.2 This specification is applicable to the design of new, rebuilt and expanded cold-rolled strip factories and independent workshops, but not applicable to the design of cold-rolled electrical steel factories and cold-rolled stainless steel factories.
1.0.3 The design of the cold-rolled strip steel plant shall not only conform to this specification, but also comply with the current relevant national standards.
2 Terms and abbreviations
2.1 Terminology
2.1.1 Cold rolled strip
Cold-rolled strip steel refers to the strip steel produced by using hot-rolled strip steel as raw material and undergoing processes such as pickling, cold rolling, (degreasing), annealing, smoothing, and finishing.
2.1.2 Coated cold rolled steel strip
Cold-rolled coated strip steel refers to the strip steel produced by cold-rolled steel coil, surface degreasing, annealing, and coating, including hot-dip galvanized strip steel (hot-dip galvanized aluminum 5% Al strip steel, hot-dip galvanized aluminum zinc 55% Al strip steel, etc.), electro-galvanized strip steel, electro-tin-plated steel strip (including chrome-plated steel strip).
2.1.3 Organic coated cold rolled steel strip
Cold-rolled coated steel strip refers to the steel strip produced by surface degreasing, coating or cladding with annealed and flattened steel coil or coated steel coil as raw material, also known as color coated steel strip.
2.1.4 Push-pull pickling line (PPL) push-pull pickling line
The unit does not have a welding machine and a large-capacity looper. The steel coil is uncoiled, corner-cut, pickled, rinsed, dried, edge-trimmed, oiled, coiled and other processes, and the pickling unit is a single-coil intermittent production.
2.1.5 Continuous pickling line (CPL) continuous pickling line
Pickling unit for continuous production of steel coils after uncoiling, welding, mechanical scale breaking, pickling, rinsing, drying, edge trimming, oiling, coil splitting, coiling and other processes.
2.1.6 Cold Reversing Mill (CRM) cold reversing mill
The strip is reciprocally rolled on the rolling mill to finally obtain the required thickness of the rolling mill. There are two kinds of single-stand reversing cold-rolling unit and double-stand reversing cold-rolling unit.
2.1.7 Tandem Cold Mill (TCM) tandem cold mill
A cold tandem rolling unit with 3 or more racks arranged in series. It is divided into conventional tandem cold rolling mill (TCM), full continuous cold tandem rolling mill (FTCM) and pickling and rolling mill combination (PLTCM).
2.1.8 Electrolytic degreasing unit (ECL) electrolytic cleaning line
The cold-rolled steel coil is uncoiled, welded, degreased, coiled and other processes, and the production unit continuously degreases the surface of the strip.
2.1.9 Bell annealing furnace (BAF) batch annealing furnace
An annealing furnace in which the stacked steel coils are recrystallized and annealed in the hood.
2.1.10 Continuous annealing line (CAL) continuous annealing line
The cold-rolled steel coil is continuously annealed through uncoiling, welding, degreasing, annealing, smoothing, trimming, inspection, oiling, coiling, and other processes.
2.1.11 Temper mill
It is a unit used to improve the mechanical properties and flatness of cold-rolled strip steel, eliminate the yield plateau of strip steel after annealing, and improve the surface quality of strip steel. There are two types of separation line leveling unit and online leveling machine.
2.1.12 Continuous hot dip galvani-zing line (CGL) continuous hot dip galvani-zing line
Cold-rolled steel coils are uncoiled, welded, degreased, annealed, hot dipped, (alloyed), cooled after plating, skinned, stretched, post-treated (passivation, anti-fingerprint, phosphating, etc.), (trimmed), inspection, oiling, coiling, and other processes to continuously form a zinc layer (or zinc alloy layer) on the surface of the strip.
2.1.13 Continuous electrolytic gal-vanizing line (EGL) continuous electrolytic gal-vanizing line
The cold-rolled steel coil after annealing and leveling undergoes uncoiling, welding, (stretching and straightening), degreasing, pickling, electroplating, passivation, inspection, oiling, coiling, and other processes, and the production of continuous electrogalvanizing on the surface of the strip unit.
2.1.14 Continuous electrolytic tin-ning line (ETL) continuous electrolytic tin-ning line
The cold-rolled steel coil after annealing and leveling is continuously electroplated on the surface of the strip through the processes of uncoiling, welding, (stretching and straightening), degreasing, pickling, electroplating, reflow, passivation, inspection, oiling, coiling, and coiling. Tin production unit.
2.1.15 Color coating line (CCL) color coating line
Coating organic color paint or pasting plastic film on cold-rolled or coated or plated substrates to produce colored organic-coated or plastic-coated strip steel production units.
2.1.16 Finishing line
According to user requirements, inspect, trim, (stretch and straighten), coil, cross-cut, slitting and packaging the finished cold-rolled strip, including recoiling (inspection) unit, cross-cutting unit, slitting unit, packaging unit.
2.1.17 Acid regeneration plant (ARP) acid regeneration plant
A facility that reacts the waste acid produced by the pickling unit to generate regenerated acid.
2.1.18 Basic automation system (L1) basic automation system
A control system that realizes the collection and processing of on-site data, data exchange, and the execution of commands required by output devices.
2.1.19 Process automation system (L2) process automation system
A control system that uses computer technology and software engineering to make the production process more efficient and safer.
2.1.20 Manufacturing execution system (MES) manufacturing execution system
Responsible for coordinating the production between processes or workshops, rationally allocating resources, executing and completing the production tasks issued by the enterprise resource planning ERP system, carrying out production planning and scheduling for problems in actual production, and implementing product quality management and control systems.
2.1.21 Intercom system
It is a multi-functional PA communication system that realizes dispatching and contacting with or without a center, all-call or group-call command calls, interrupt calls, conference calls, etc.
2.2 Abbreviations
B/S - browser/server (Browser/Server);
C/S - Client/Server (Client/Server);
CPU - Central Processing Unit (Central Processing Unit);
D1——Digital TV system 480i display format (Digital 1);
ERP - Enterprise Resource Planning (Enterprise Resource Planning);
HMI - Human Machine Interface (Human Machine Interface);
IP - computer network communication protocol (Internet Protocol);
I/O - Input/Output (Input/Output).
IPC——Industrial Personal Computer (Industrial Personal Computer);
OA - Office Automation (Office Automation);
PLC - Programmable Logic Controller (Programmable Logic Controller);
QoS - Quality of Service;
RAID - Disk Array (Redundant Arrays of Independent Disks);
TCP/IP - Transmission Control Protocol/Internet Protocol (Transmission Control Protocol/Internet Protocol);
UPS——uninterruptible power supply (Uninterruptible Power Supply);
VLAN - virtual local area network (Virtual Local Area Network).
3 Basic Regulations
3.0.1 The design of the cold-rolled strip factory shall meet the requirements of economical production scale, and the annual effective working hours and load rate of each production unit shall be determined reasonably, and shall comply with the relevant provisions of the current national standards.
3.0.2 The process design of the cold-rolled strip factory should conform to the circular economy development model, actively adopt advanced energy-saving, water-saving, and environmentally-friendly technologies, and equipment, reduce raw materials and energy consumption in the production process, and improve waste gas, waste water, Comprehensive utilization level of solid waste. The treatment of waste gas, waste water and solid waste shall comply with the relevant current national standards and be discharged up to standard.
3.0.3 The configuration of the production units of the cold-rolled strip factory should follow the principle of "advanced, practical, economical and reasonable". The capabilities of each production unit should match each other to ensure a smooth and stable production process and meet the production requirements of the product outline.
3.0.4 The electrical transmission and automation equipment level of the cold-rolled strip factory shall be compatible with the requirements of the production process and the technical equipment level of the production unit; the selected automation control system and on-line detection system shall be advanced and reliable, and shall meet the requirements of system maintenance and The need for upgrading.
3.0.5 The public and auxiliary facilities of the cold-rolled strip factory shall be planned and optimized according to the construction conditions of the cold-rolled strip factory, and equipment and treatment processes with excellent performance, advanced indicators, energy-saving and environment-friendly shall be adopted.
3.0.6 The general plan design of cold-rolled strip factories should be combined with the geographical and natural conditions of each cold-rolled strip factory and the overall layout of the enterprise, so as to achieve compactness and reasonableness, smooth process, and the needs of future sustainable development should be reserved.
3.0.7 The production of high-end products such as automobile sheets and electroplated tin sheets shall adopt the consistent quality production technology from ironmaking, steelmaking, continuous casting, hot rolling to cold rolling. The cold-rolled strip workshop and the pre-process workshop should coordinate production or design and construct at the same time.
3.0.8 Except for precision steel strips and cold-rolled steel strips for other special purposes, the width of cold-rolled steel strips should be greater than or equal to 700mm.
4 Process and equipment
4.1 General provisions
4.1.1 The determination of the production process and the selection of operating equipment should be determined after technical and economic comparisons based on factors such as production scale, product plan, production method, raw material, fuel performance and plant construction conditions.
4.1.2 The public and auxiliary facilities shall meet the production requirements.
4.2 Process flow
4.2.1 The production of cold-rolled steel strip shall comply with the following process flow.
4.2.2 The production of cold-rolled coated and coated steel strips shall comply with the following process flow.
4.3 Production units and cranes
4.3.1 The selection of the production unit shall comply with the relevant provisions of the current national standards "Code for Design of Strip Rolling Process" GB 50629, "Code for Design of Strip Finishing Process" GB 50713 and "Code for Design of Industrial Furnaces in Iron and Steel Plants" GB 50486.
4.3.2 The type, lifting tonnage, working level and control mode of the crane shall be selected according to the requirements of the production process.
4.3.3 Cranes should be equipped with inspection hoists and inspection platforms.
4.4 Workshop Layout
4.4.1 The layout of the workshop should be in accordance with the requirements of the production process and smooth logistics, and the production units should be reasonably arranged to avoid cross-transportation.
4.4.2 The warehouse area should meet the reasonable production turnover needs.
4.4.3 Production units of the same type should be arranged in a centralized manner.
4.4.4 The layout of the workshop should meet the layout requirements of the workshop transportation road, production operation and equipment maintenance site, underground pipe gallery and trench.
4.4.5 The space between equipment and between equipment and buildings (structures) shall meet the requirements of production, operation, installation, maintenance and fire protection.
4.4.6 Production auxiliary facilities should be close to the main production unit.
4.4.7 The elevation of the track surface of the factory building shall meet the maintenance requirements at the highest point of the production unit.
4.5 Workshop piping
4.5.1 The workshop pipes should be laid along the columns, pipe trenches or underground pipe corridors of the workshop, and shall not hinder the passage, opening of doors and windows and daylighting.
4.5.2 When multiple pipes are arranged up and down, the following requirements shall be met.
1 The hot medium pipeline is above the cold medium pipeline;
2 The non-corrosive medium pipeline is above the corrosive medium pipeline;
3 The gas pipeline is above the liquid pipeline;
4 The metal pipe is above the non-metal pipe;
5 Insulated pipes are above uninsulated pipes.
4.5.3 When multiple pipes are arranged horizontally against the wall, it is advisable to place thick pipes, normal temperature pipes, and pipes with few branches close to the wall, and thinner pipes, hot pipes, and pipes with many branches outside.
4.5.4 Flanges and valves shall not be set above the sidewalk for heat medium pipelines and corrosive medium pipelines. The valve parts on the riser should be arranged within the range of 1.2m ~ 1.5m from the ground. When it needs to be arranged above 2m, an operation platform should be provided.
4.5.5 The gas pipeline should be arranged away from the power supply side of the crane.
4.6 Workshop transportation
4.6.1 On-line walking beams, transport chains, and coil trolleys should be used for steel coil transportation between processes.
4.6.2 The replacement rolls should be transported directly to the grinding roll room.
4.6.3 After collection, the head and tail waste and trimming waste should be directly transported outside the factory, and transport vehicles should not enter the workshop.
5 General layout
5.0.1 The site selection of an independent cold-rolled strip factory shall comply with the relevant provisions of the current national standard "Code for Transportation Design of General Drawings of Iron and Steel Enterprises" GB 50603.
5.0.2 The location of the cold-rolled strip factory in the iron and steel complex shall comply with the following regulations.
1 It should be located on the downwind side of the perennial minimum frequency wind direction in the plant area;
2.It should have convenient conditions for exporting finished products;
3 It should be arranged near the hot-rolled strip factory that provides raw materials for it.
5.0.3 The general layout of the cold-rolled strip factory shall be in accordance with the production process, so that the flow of logistics, people and media is short and smooth, and the flow of people and goods can be separated.
5.0.4 The safety protection spacing between buildings (structures) and between buildings (structures) and railways, roads and pipelines, as well as the anti-vibration and anti-noise distances of the cold-rolled strip factory shall comply with the current national standard "Steel Relevant provisions of GB 50603, "Code for Fire Protection Design of Iron and Steel Metallurgical Enterprises" GB 50414 and "Code for Fire Protection Design of Buildings" GB 50016.
5.0.5 For the cold-rolled steel strip factory built in phases, the short-term projects should be arranged in a centralized manner, and the long-term projects should be arranged outside the land for the short-term projects.
5.0.6 The layout of the main building of the cold-rolled strip factory shall meet the following requirements.
1 It should be arranged in areas with good geological conditions;
2 In mountainous and hilly areas, the longitudinal axis of the main powerhouse should be parallel to the contour line of the terrain, and the possible hazards caused by deep excavation and high filling of the slope should be prevented;
3 In hot areas, the intersection angle between the longitudinal axis of the main factory building and the prevailing wind direction in summer should not be less than 45°.
5.0.7 The general layout of public and auxiliary facilities shall meet the following requirements in addition to the relevant provisions of the current national standards.
1 should be as close as possible to their respective main users;
2 The regional substation should be arranged at the edge of the factory area where the high-voltage line is convenient;
3 Gas facilities should be arranged in areas with few people and traffic;
4 The acid regeneration station (ARP) should be arranged near the pickling workshop, and should be located on the windward side of the main workshop building with the minimum frequency wind direction;
5 The cooling facilities of the circulating water treatment system should be arranged on the windward side of the minimum frequency wind direction of the buildings and structures in winter; the protective distance between the cooling facilities and the buildings (structures) should comply with the current national standard "Code for the Design of General Drawings and Transportation of Iron and Steel Enterprises" GB 50603 the relevant regulations;
6 The compressed air station should avoid the gas, boiler room and acid regeneration station (ARP), and should be located on the downwind side of the minimum frequency wind direction of the above facilities.
5.0.8 The office and living facilities shall be arranged on the downwind side of the perennial minimum frequency wind direction in the cold-rolled strip factory area, and where the flow of people is concentrated.
5.0.9 The transportation mode of materials in the cold-rolled strip factory shall be determined after technical and economic comparison according to external transportation conditions, source of raw materials, destination of finished products and transportation volume.
5.0.10 When the cold-rolled strip factory is arranged near the hot-rolled strip factory that provides raw steel coils for it, cold-rolled rails that do not intersect the railway and road planes should be installed between the hot-rolled strip factory and the cold-rolled strip factory. Special channel for rolling raw material transportation.
5.0.11 The vertical layout, comprehensive layout of pipelines, greening design, and the design of transportation systems such as railways and roads shall comply with the relevant provisions of the current national standard "Code for Transportation Design of General Drawings of Iron and Steel Enterprises" GB 50603.
6 Power supply and distribution facilities
6.1 General provisions
6.1.1 The power supply and distribution design of the production unit shall comply with the relevant provisions of the current national standard "Code for Design of Power Supply and Distribution System" GB 50052.
6.2 Power supply
6.2.1 The production unit shall be powered by at least one dedicated line or two high (medium) voltage power lines. In the case of two-way power supply, when one circuit fails and the power is cut off, the other circuit should be able to bear the fault state load or the full load power supply.
6.3 Power supply and distribution system
6.3.1 The medium-voltage distribution voltage level of production units should be 10kV.
6.3.2 According to its production scale and distribution of production units, the cold-rolled strip factory should set up power distribution systems in different areas, and the power distribution systems in each area should be as close to the load center as possible.
6.3.3 The main wiring of the power distribution system should adopt single busbar or single busbar section wiring, and the power distribution system should adopt radial type.
6.3.4 Power quality problems caused by electrical equipment should be managed by the power supply system in this area.
6.3.5 The design of relay protection and automatic devices shall comply with the relevant provisions of the current national standard "Code for Design of Relay Protection and Automatic Devices for Electric Power Installations" GB 50062.
6.4 Power supply and distribution lines
6.4.1 The design of cable distribution lines shall comply with the relevant provisions of the current national standard "Code for Design of Electric Power Engineering Cables" GB 50217.
7 Electrical Transmission and Electrical Engineering
7.1 Low-voltage power supply and distribution system
7.1.1 The electricity load of the cold-rolled strip factory shall be Class II or Class III, and some facilities with higher requirements for power supply safety may be Class I loads. The power supply and distribution system should meet the corresponding load classification requirements.
7.1.2 The power load level of fire-fighting equipment shall comply with the relevant provisions of the current national standard "Code for Fire Protection Design of Buildings" GB 50016.
7.1.3 The automatic control system, important testing instruments, switches and telephones of the IP communication system should use UPS power as the emergency power supply, and its backup time should meet the emergency treatment needs after the working power supply is cut off.
7.1.4 Lighting and cranes in the cold-rolled strip factory should be powered by dedicated transformers.
7.1.5 The design of the low-voltage power supply and distribution system shall also comply with the relevant provisions of the current national standard "Code for Design of Low-Voltage Power Distribution" GB 50054.
7.2 Electric drive
7.2.1 The electric drive system should adopt full AC drive mode. Motors that require speed regulation should be powered by full-digital AC frequency conversion speed regulation equipment.
7.2.2 The transmission motors in the production units that need frequency conversion and speed regulation should adopt the power supply mode of "public rectifier + inverter".
7.2.3 The transmission system of pumps and fans should adopt AC frequency conversion speed regulation system.
7.3 Electrical Engineering
7.3.1 The location of the electrical room should be close to the load center. For production units with large and dispersed electrical loads, it is advisable to set up multiple electrical rooms according to the load distribution.
7.3.2 For large electrical rooms, basements or cable interlayers should be set up.
7.3.3 For large-scale production units, cables should be laid in cable tunnels.
7.3.4 The air inlets of electrical rooms, operating rooms, and cable tunnels should avoid acid and alkali fog areas.
7.3.5 Electrical equipment, cables and cable laying materials arranged in areas with acid and alkali fog should adopt acid and alkali resistant materials or take other protective measures.
7.3.6 The cable design should comply with the relevant provisions of the current national standard "Code for Design of Electric Power Engineering Cables" GB 50217.
7.3.7 The fire protection design shall comply with the relevant provisions of the current national standards "Code for Fire Protection Design of Buildings" GB 50016 and "Code for Fire Protection Design of Iron and Steel Metallurgical Enterprises" GB 50414.
7.3.8 The lighting design shall comply with the relevant provisions of the current national standard "Architectural Lighting Design Standard" GB 50034.
7.3.9 The lightning protection design shall comply with the relevant provisions of the current national standard "Code for Lightning Protection Design of Buildings" GB 50057.
7.3.10 The grounding design shall comply with the relevant provisions of the current national standard "Type and Safety Technical Requirements for System Grounding" GB 14050.
7.3.11 The design of explosive and fire hazardous environments shall comply with the relevant provisions of the current national standard "Code for Design of Electrical Installations in Explosive and Fire Hazardous Environments" GB 50058.
8 Detection instrument
8.1 General provisions
8.1.1 The configuration of testing instruments should be economical, reliable, practical and easy to maintain, based on the overall equipment level and control level of the production unit on the premise of meeting the requirements of the production process.
8.1.2 The analog signal for long-distance transmission should adopt 4mA~20mA DC signal.
8.2 Testing instrument equipment
8.2.1 Temperature instruments should meet the following requirements.
1 The graduation number of the thermal resistance should be Pt100; the thermocouples with the graduation numbers E, K, S, and B should be preferred according to the temperature measurement range;
2 Armored thermocouples should be used for temperature measurement of the radiant tube wall of the annealing furnace;
3 The inserting temperature measuring instrument should be inserted into the appropriate depth according to the diameter of the process pipe;
4.According to the characteristics of the measured medium, select the appropriate material for the protection tube of the temperature measuring element;
5 When the strip temperature needs to be continuously measured, an infrared pyrometer should be used.
8.2.2 For pressure gauges, appropriate liquid-contacting materials should be selected according to the corrosiveness of the measured medium. For highly corrosive acidic media, diaphragm-sealed pressure transmitters should be used.
8.2.3 The throttling device and electromagnetic flowmeter in the flow meter shall meet the following requirements.
1 The throttling device shall meet the following requirements.
1) Throttling devices should be used for gas and non-conductive liquid flow detection;
2) For the gas flow measurement with large temperature and pressure fluctuations, temperature and pressure compensation should be carried out;
3) The pressure taking and installation method of the throttling device shall comply with the relevant provisions of the current national standard GB/T 2624 "Using a differential pressure device installed in a circular cross-section pipe to measure the flow of a full pipe fluid".
2 The electromagnetic flowmeter shall meet the following requirements.
1) For the flow measurement of conductive liquid medium, electromagnetic flowmeter should be used first;
2) When the measured medium contains magnetic or magnetizable substances, electromagnetic flowmeters should not be used;
3) For alkaline medium, the electrode material should be stainless steel; for strongly corrosive acidic medium, the electrode material should be tantalum metal, and the lining material should be polytetrafluoroethylene;
4) For places with insufficient maintenance space or large vibrations, and when the measured medium is highly corrosive, a split electromagnetic flowmeter should be used.
8.2.4 Level instruments should meet the following requirements.
1 Under normal working conditions, the liquid density is prone to obvious changes...
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 64 pages — is available in the English PDF.
How to Download GB 50930-2013
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 11118-2026 — Hydraulic fluids (L-HL, L-HM, L-HV, L-HS and L-HG type)
GB 11557-2026 — Provisions for protecting drivers from injury by the steering mechanism of motor vehicles
GB 12021.4-2026 — Maximum allowable values of the energy consumption, water consumption and grades for electric washing machines and washer-dryers
Secure payment via Stripe
Payments accepted
GB 50930-2013
$285.00